Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical VPO CHAMBI | CHAMBA | HIMACHAL PRADESH | 176207 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.2 Cr
EMD Value
₹8.9 L
Closing Date
27 Jun 2026, 5:00 pmClosed
Executive Engineer
EE JSV Div Mandi
C/o Wet Well 9.08 MLD near HPSEB office at Sain and Providing and laying DI pipe double flanged pipe of 400 mm dia K9-1500 Rmt Rising Main from Wet Well to STP RKP along with Pumping Machinery, DG Set and allied accessories along with automation, C/o
2026_HPIPH_136802_1
7660-7759
Open Tender
Civil Works
Item Rate
180 days
Mandi
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹8.9 L
Chief Engineer MZ Mandi Dhangsidhar
24 Jul 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
27 Jun 2026
22 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work, chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge. | 2,174.95 | Cum | - | - |
| 2 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. (i) Ordinary rock) | 320 | Nos | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size in all leads & lifts and as per the entire satisfaction of Enginner-in-Charge. | 0.57 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts and as per the entire satisfaction of Enginner-in-Charge. | 206.38 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand): 4 graded stone aggregate 20 mm nominal size) in all leads and lifts and as per the entire satisfaction of Enginner-in-Charge. | 107.92 | Cum | - | - |
| 6 | Centering and shuttering includung strutting, propping etc. and removal of form fo all heights.: foundation footing bases of columns etc for mass concrete in all leads and lifts and as per the entire satisfaction of Enginner-in-Charge. | 96.63 | Sqm | - | - |
| 7 | Centering and shuttering includung strutting, propping etc. and removal of form fo all heights.:walls (any thickness) including attached pillasters buttresses, plinth and string courses etc in all leads and lifts and as per the entire satisfaction of Enginner-in-Charge. | 1,264.54 | Sqm | - | - |
| 8 | Centering and shuttering includung strutting, propping etc. and removal of form fo all heights.: Suspended floors, roofs landings balconioes and access platform in all leads and lifts and as per the entire satisfaction of Enginner-in-Charge. | 91.23 | Sqm | - | - |
| 9 | Lintels ,beams,plinth beams,girders,bressumers and centilivers. | 10.31 | Sqm | - | - |
| 10 | Columns, Pillars, Piers, Abutments, Posts and Struts | 225.6 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.49 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.63 MB
Form6.pdf
Tender Documents • 0.68 MB
Form8.pdf
Tender Documents • 1.14 MB
Datasheet.pdf
Tender Documents • 6.80 MB
Siteplan.pdf
Tender Documents • 0.58 MB
BOQ_202472.xls
BOQ • 0.58 MB
Corrigendum.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .