Loading…
Loading…
Tender Value
₹11.8 L
EMD Value
₹12,000
Closing Date
21 May 2026, 6:00 pmClosed
Executive Engineer, Rajkot Irrigation Division, Rajkot.
NYARI-II IRRIGATION SCHEME Providing Skilled, Unskilled Man Power, Electrician, Mechanical at Nyari-II Dam Site For flood season - 2026 of Nyari-II Irrigation Scheme
302261
SBD-03 of 2026-27
Open
Civil - All
Rajkot
7 documents required · 7 mandatory
₹900
Executive Engineer, Rajkot Irrigation Division Rajkot
₹12,000
7 May 2026
7 May 2026
7 May 2026
21 May 2026
7 May 2026
NAME OF WORK :-
Providing Skilled, Unskilled Man Power, Electrician, Mechanical at Nyari-II Dam Site For flood season - 2026 of Nyari-II Irrigation
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Providing unskill labour for dam/canal system suitable shift as per 1316.00 Man Days 690.09 Rupees: Six Hundred
instruction of engineer in charge. Ninty & Ps. Nine Only.
2 Providing Skill Labour T.A./W.A./Wireless Operator during Flood Cell to 383.00 Man Days 719.69 Rupees: Seven Hundred
Calculate inflow/outflow, pass massage and miscellaneous activity during Ninteen & Ps. Sixty Nine
flood cell. Only.
Wireless Operator/T.A./W.A. /Electrician/Mechanical
Rupees: Eleven Lac Eighty Three Thousand Seven Hundred Ninety Nine & Ps. Seventy One Only
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated
rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer
Signature of contractor. Irrigation Sub Division No.2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P 1 to 14.pdf
2- SBD Man Power Nyari-II P 15 to 122.pdf
3 Sch B - Man Power - Nyari-II P 123.pdf
Annexure A.pdf
Download all tender documents and submit your bid