| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.5 L+₹44,688.99 (21.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.5 L+₹45,129.63 (21.6%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | vino L1 | Mohammed Ashraf.A.M L3 | RAFI L2 |
|---|---|---|---|---|---|---|
| 1.00Civil work | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 107.6 | cum | 195.6 ₹21,046.56 Lowest | 235.83 ₹25,375.31 | 235.4 ₹25,329.04 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.64 | cum | 6,178 ₹3,953.92 Lowest | 7,509.07 ₹4,805.8 | 7,495.36 ₹4,797.03 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 7.2 | sqm | 303.6 ₹2,185.92 Lowest | 369.47 ₹2,660.18 | 368.8 ₹2,655.36 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2 | cum | 6,679 ₹13,358 Lowest | 8,118.04 ₹16,236.08 | 8,103.22 ₹16,206.44 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 8.45 | cum | 7,244 ₹61,197.31 Lowest | 8,804.82 ₹74,383.12 | 8,788.75 ₹74,247.36 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 360 | sqm | 241 ₹86,760 Lowest | 294.84 ₹1,06,142.4 | 294.3 ₹1,05,948 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 1.28 | cum | 8,236 ₹10,542.08 Lowest | 10,010.58 ₹12,813.54 | 9,992.29 ₹12,790.13 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 4.24 | sqm | 738 ₹3,129.12 Lowest | 898.8 ₹3,810.91 | 897.2 ₹3,804.13 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 76.8 | kilogram | 94 ₹7,219.2 Lowest | 108 ₹8,294.4 | 108.12 ₹8,303.62 |
Tender Value
₹2.3 L
EMD Value
₹5,812
Closing Date
9 Apr 2025, 6:00 pmClosed
Vinodhan T P
O/o Assistant Executive Engineer, Minor Irrigation Sub Division Mananthavady
GENERAL-Annual Maintenance 2024-25- Koilery LI Scheme in Mananthavady Municipality-General Civil Work
2025_Irrig_755752_1
IRR/IA/TR/3434/2024_5_2_3/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Koileri
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹5,812
23 Aug 2025
27 Mar 2025
11 Apr 2025
27 Mar 2025
9 Apr 2025
27 Mar 2025
Amount
Civil work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
RAFI (BID ID -2193406)
Mohammed Ashraf.A.M (BID ID -2192194)
Bidder Name
Mohammed Ashraf.A.M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1227243.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .