Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC PWD S CONTRACTOR KUNHALINKIL HOUSE MARKET ROAD NILESHWAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.6 L+₹8,199.10 (0.71%)Rejected-AOC MASTHIKUND HOUSE CHENGALA POST KASARAGOD KERALA 671541 | KASARAGOD | KERALA | 671541 | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.9 L+₹33,364.19 (2.89%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹12.2 L+₹63,310.80 (5.49%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹12.4 L
EMD Value
₹30,929
Closing Date
7 Jul 2022, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,lding Sub Division, kanhangad.
DEPOSIT Govt.polytechnic periya New Vally ball shuttle court construction general civil work
2022_PWD_495984_1
PWD/BLDG/5141/2022-23 dtd 21-6-22
Open Tender
Civil Works - Buildings
Item Rate
180 days
Periya
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹30,929
Yes
1 Nov 2022
22 Jun 2022
11 Jul 2022
22 Jun 2022
7 Jul 2022
22 Jun 2022
Amount
APPENDIX-D Shuttle court Govt.Polytechnic, Kasargod
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD61537/2021-2022:Laterate masonry with neatly dressed laterate stone of size30X20X20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
OD61536/2021-2022: Laterate masonry with neatly dressed laterate stone of size 30x20x20 or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.39.1:Colour washing such as green, blue or buff to give an even shade:New work ( two or more coats) with a base coat of white washing with lime
OD62558/2021-2022:Providing and Laying synthetic floor for volley ball/shuttle court included material and labours charges ec complete
ABDUL NAZAR M A
M.V. REMESHAN
CK Ahamed
Bidder Name
CK Ahamed
M.V. REMESHAN
ABDUL NAZAR M A
SHAMEER A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_711525.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .