Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC 210 FIRST FLOOR PHASE III OKHLA INDUSTRIAL AREA DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | 1 | Accepted-AOC workable rate | |
| 2 | Rejected-Technical | - | Rejected-Technical Not Responsive | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Responsive |
Tender Value
₹15.0 L
EMD Value
₹30,500
Closing Date
27 Oct 2023, 3:00 pmClosed
Executive Engineer
Room No 55, Dr B R Ambedkar University Delhi, Lothian Road, Kashmere Gate Delhi -110006
Comprehensive Annual Maintenance Contract (CAMC) of various Heat Pump type VRF/VRV Air conditioning system installed in Karampura Campus, Dr. B.R. Ambedkar University Delhi
2023_AUD_248868_1
01/EE/EMU/AUD/2023-24
Open Tender
Miscellaneous Services
Item Rate
365 days
DR B R Ambedkar University Delhi, Karampura Campus
As per NIT
10 documents required · 10 mandatory
₹0
₹30,500
2 Jan 2024
16 Oct 2023
27 Oct 2023
16 Oct 2023
27 Oct 2023
16 Oct 2023
16 Oct 2023 - 27 Oct 2023
Amount
CIVIL
Comprehensive (Routine, Preventive and Breakdown) maintenance of DAIKIN make VRF / VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (cassette type ceiling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits, etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one year) "Comprehensive Annual Maintnenace Contract of various Heat pump type VRF/VRV Air conditioning system . Outdoor Unit, Cluster 1 (B- Block / Auditorium ); (Cuircuit 8,9), 2 Modules (Capacity: 3x12 HP): Total 72 HP
Comprehensive (Routine, Preventive and Breakdown) maintenance of DAIKIN make VRF / VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (cassette type ceiling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits, etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one year) "Comprehensive Annual Maintnenace Contract of various Heat pump type VRF/VRV Air conditioning system . Outdoor Unit, Cluster 2 (B- Block /Comp Lab, Faculty cabin GF &FF, class room FF ); (circuit 1,6) 2 Modules , (Capacity: 8HP + 2x 10 HP): Total 56 HP
Comprehensive (Routine, Preventive and Breakdown) maintenance of DAIKIN make VRF / VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (cassette type ceiling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits, etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one year) "Comprehensive Annual Maintnenace Contract of various Heat pump type VRF/VRV Air conditioning system . Outdoor Unit, Cluster 3 (B- Block /class room GF& FF, VC roomGF, Committee room GF, Lib , DR AR Room, Admin room ); (circuit 2,4,5,7) , 4 Modules (Capacity: 2x12 HP): Total 96 HP
Comprehensive (Routine, Preventive and Breakdown) maintenance of DAIKIN make VRF / VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (cassette type ceiling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits, etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one year) "Comprehensive Annual Maintnenace Contract of various Heat pump type VRF/VRV Air conditioning system . Outdoor Unit, Cluster 4 (B- Block / Faculty room FF, Audi Mez, Ground and first ); (Circuit 3,10), 2 Modules (Capacity:1x 6HP + 1x 8 HP): Total 28 HP
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .