Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L | L1 | Accepted-AOC Agreement executed on 20.1.21 |
| 2 | L2₹9.8 L+₹45,257.63 (4.86%)Rejected-Finance | ₹9.8 L+₹45,257.63 (4.86%) | L2 | Rejected-Finance higher rate |
Tender Value
Refer Docs
EMD Value
₹22,176
Closing Date
13 Jan 2021, 5:00 pmClosed
Executive Engineer
Office of the Executive Enginer,Civil Station,Kozhikode
Demolishing structures
2021_PWD_405082_1
DB3/TN/71/20-21
Open Tender
Civil Works - Roads
Item Rate
30 days
Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,960
Yes
₹22,176
Yes
23 Mar 2021
8 Jan 2021
15 Jan 2021
8 Jan 2021
13 Jan 2021
8 Jan 2021
Amount
Demolishing Structures and Cutting Trees
od20253/2020_2021 : Engaging wood cutter to cut fallen decayed free standing tree as per the direction of departmental officers
od20254/2020_2021 : Engaging man mazdoor for removal of cut/fallen trees branches including of stacking etc
od20255/2020_2021 : Engaging tractor with trolley for the removal of cut trees branches from road to stacking yard
2.4.2.A : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
2.4.3.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Brick / Tile work - In cement mortar <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Brick / Tile work - In cement mortar
2.4.4.D : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Dry rubble masonry<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry
2.4.5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 <br> Wood Work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 Wood Work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level
Prajeesh V K
Bidder Name
Varghese.K.T
Prajeesh V K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_575950.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .