Loading…
Loading…
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
1 Oct 2026, 4:00 pm4d left
Executive Engineer REW Kargil
Executive Engineer REW Kargil
Boundary Wall at Higher Sec. School Panikhar
2026_RDD_19605_3
e-Tender- 22 of REW Kargil UTL of 2026-27
Open Tender
Civil Works - Others
Percentage
Tai-Suru
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer REW Kargil
₹25,000
24 Sept 2026
24 Sept 2026
3 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead
as per direction of Engineer-in-charge.In cement mortar | 1,668 | CUM | 54.34 | ₹90,632.45 |
| 2 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
a). All kinds of soil. | 526 | CUM | 37.4 | ₹19,672.4 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 7,795.18 | CUM | 31.61 | ₹2,46,405.64 |
| 4 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete.1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size )and all sort of carriage complete. | 13,000 | CUM | 28.5 | ₹3,70,500 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 9,500 | CUM | 19.2 | ₹1,82,400 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D | 12,901 | QTL | 17.3 | ₹2,23,187.3 |
| 7 | 15 mm cement plaster on the rough side of single or half brick wall of mix :
13.2.1 1:4 (1 cement: 4 fine sand) | 424.32 | SQM | 38.75 | ₹16,442.4 |
| 8 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. | 282 | SQM | 38.75 | ₹10,927.5 |
| 9 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC
(Volatile Organic Compound ) content less than 50 grams/ litre of approved
brand and manufacture, including applying additional coats wherever required to
achieve even shade and colour Two coats | 138 | CUM | 38.75 | ₹5,347.5 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns. | 400 | SQM | 119.04 | ₹47,616 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_46373.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .