Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 CrAccepted-AOC | ₹18.7 Cr | L1 | Accepted-AOC Responsive |
| 2 | L2₹18.7 CrRejected-AOC 102 IST FLOOR DEVIKA CHAMBER RDC RAJ NAGAR GHAZIABAD U P | GHAZIABAD | UTTAR PRADESH | 201001 | ₹18.7 Cr | L2 | Rejected-AOC Responsive |
| 3 | L3₹18.7 CrRejected-AOC | ₹18.7 Cr | L3 | Rejected-AOC Responsive |
Tender Value
₹18.6 Cr
EMD Value
₹37.1 L
Closing Date
21 Mar 2025, 3:00 pmClosed
SE Rampur Circle PWD Rampur
Office of SE Rampur Circle PWD Rampur
Widening and Strengthening of Dhampur Bypass road (transferrd part of NH-74) in 4 lane from ch. 0.000 to ch. 4.835 Including 05 year mai
2025_CEMBD_1017104_1
332/E-Tender-R.Circle/2023-24 Dt. 16.01.2025
Open Tender
Civil Works - Roads
365 days
Office of SE Rampur Circle PWD Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹37.1 L
Office of SE Rampur Circle PWD Rampur
4 Apr 2025
12 Mar 2025
21 Mar 2025
12 Mar 2025
21 Mar 2025
12 Mar 2025
13 Mar 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Morth Specification Clause 301 (3.6). Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 Morth Specification Clause 305 (3.17). Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth Specification clause 401 (4.1A). Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Morth Specification clause 406 (4.14B). Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. grade-I. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. grade-I. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Morth Specification clause 503 (5.2(i)) For BC. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 (5.5 B) complete in all respects. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Morth Specification Clause 305 (3.18). Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.Clause 2.4 A. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.. Ch-9.01,304. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification Ch-12.3, 304. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.M-15 Clause 9.14, 1500, 1700 & 2100. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
RCC Grade M25 in Foundation Plain/Reinforced Cement Concrete, in Foundation complete as per Drawing and Technical Specification. Clause 9.14 E Case II. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
RCC Grade M25 in Super structure Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications.Clause 9.15,B 1500, 1700 & 2100. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
HYSD in Foundation Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Clauses 9.16, 1600. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Clause 9.17, 2706 & 2200. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.Clause 15.1, 2503. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications.RCC Grade M-30 Clause 9.15,1500, 1700 & 2100. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.PCC 1:3:6 in fondation,Clause 9.4, 2100. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.Clause 9.5, 1300. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications Clause 9.14, 1300 & 2200. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Struck cement pointing in 1:2 cement : F.Sand mortar.Clause 9.9, 1300 & 2200. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . Clause 9.12a, 2900. Including cost of Material, labour, T&P, Labour Cess, all taxes but excluding GST.
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost. For Ist Year @ 0.00 %
For Ist Year @ 0.00 %
For IInd Year @ 0.25 %
For IIIrd Year @ 0.50 %
For IVth Year @ 0.75 %
For Vth Year @ 1.00 %
NP BUILDWELL PRIVATE LIMITED (BID ID -5058328)
Jeet Construction (BID ID -5057866)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid