Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-Finance | ₹35.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹40.1 LAccepted-Finance | ₹40.1 L | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | BHARAT SINGH ADHIKARI L2 | PRAKASH BISHT L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 1.44 | Cum | 2,500 ₹3,600 | 1,770.5 ₹2,549.52 |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | 1.43 | Cum | 3,700 ₹5,291 | 2,583 ₹3,693.69 |
| 3.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar | 4.87 | Cum | 2,100 ₹10,227 | 1,498.84 ₹7,299.35 |
| 4.00 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : 1 Of sectional area 40 square centimetres and above | 1.32 | Cum | 4,600 ₹6,072 | 3,243.36 ₹4,281.24 |
| 5.00 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet | 335.21 | Sqm | 130 ₹43,577.30 | 119.98 ₹40,218.50 |
| 6.00 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 5,987.57 | Sqm | 21 ₹1.3 L | 18.29 ₹1.1 L |
| 7.00 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 105 | Sqm | 320 ₹33,600 | 246 ₹25,830 |
| 8.00 | Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. | 64.8 | Sqm | 3.5 ₹226.80 | 2.5 ₹162 |
| 9.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 51.34 | Cum | 250 ₹12,835 | 189.33 ₹9,720.20 |
| 10.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 0.59 | cum | 200 ₹118 | 142.56 ₹84.11 |
Tender Value
₹52.4 L
EMD Value
₹1.0 L
Closing Date
30 Mar 2026, 3:00 pmClosed
EE RWD ALMORA
office of EE RWD Almora
different repairing and construction work to make GIC Almora a model school
2026_RES_93497_1
1823 Dated 07-03-2026
Open Tender
Civil Works - Buildings
365 days
Almora
different repairing and construction work to make GIC Almora a model school
3 documents required · 3 mandatory
₹5,310
EE RWD ALMORA
₹1.0 L
2 Apr 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | |||||
| 2Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | |||||
| 3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar | |||||
| 4Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : 1 Of sectional area 40 square centimetres and above | |||||
| 5Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet | |||||
| 6Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | |||||
| 7Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | |||||
| 8Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. | |||||
| 9Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | |||||
| 10Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_110673.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.18 MB
Tendernotice_2.pdf
PDF • 3.86 MB
BOQ_110673.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid