| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance REVATHY POTHENCODE THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695001 | ₹2.4 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.4 CrSame as L1Accepted-Finance | ₹2.4 CrSame as L1 | L2 | Accepted-Finance L2 |
| 3 | L3₹2.5 Cr+₹14.1 L (5.88%)Rejected-Finance | ₹2.5 Cr+₹14.1 L (5.88%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 Cr+₹6.4 L (2.66%)Rejected-Finance | ₹2.5 Cr+₹6.4 L (2.66%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.5 Cr+₹6.4 L (2.66%)Rejected-Finance | ₹2.5 Cr+₹6.4 L (2.66%) | L5 | Rejected-Finance L5 |
Tender Value
₹2.8 Cr
EMD Value
₹1 L
Closing Date
15 Sept 2026, 5:00 pmClosed
Superintending Engineer
The Superintending Engineer, O/o the Superintending Engineer, Public Works Department (PWD), Buildings South Circle, Thiruvananthapuram
In this phase, the remaining structural works i.e., column raising for the 2nd floor, 2nd-floor roof slab (General roof slab), and tower room,are included. The finishing works of the GF,FF, and SF, terrace roofing, road formation, and sump tank.
2026_PWD_867121_1
PWD/BLDG/TR/2891/2023_23_2_1/1
Open Tender
Civil Works - Buildings
Percentage
360 days
College of Engineering Trivandrum
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
22 Sept 2026
1 Sept 2026
18 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A- Building proper(Civil work) | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | 18.59 | - |
| 1.002 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | 2,572.86 | - |
| 1.003 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | 563.04 | - |
| 1.004 | OD246978/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Excess/less cement as per design mix shall not be payable/recoverable separately.
All work above plinth level up-to floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum | 0.4 | cum | 13,211.26 | ₹5,284.5 |
| 1.005 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | 114.92 | ₹114.81 |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.6 | sqm | 1,030.96 | ₹618.58 |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | 779.84 | - |
| 1.008 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | - | sqm | 843.14 | - |
| 1.009 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.4 | sqm | 982.6 | ₹393.04 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.13 MB
affidavit.pdf
Tender Documents • 0.19 MB
preliminaryagreement.pdf
Tender Documents • 0.36 MB
epay.pdf
Tender Documents • 0.06 MB
NIT.pdf
Tender Documents • 1.11 MB
IntagrityPact.pdf
Tender Documents • 0.10 MB
formoftender.pdf
Tender Documents • 0.26 MB
BOQ_1468178.xls
BOQ • 0.66 MB
SBDmerged.pdf
Tender Documents • 9.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .