Tender Value
₹46.0 L
EMD Value
₹46,010
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer, panchayat, R & B Division, Surat.
PROPOSED CONSTRUCTION OF SCHOOL ROOMS AT KARAN VILLAGE ,TA : PALSANA ,DIST.SURAT
308528
03 0F 2026-27
Open
Civil Works - Others
Surat
5 documents required · 5 mandatory
₹1,500
Executive Engineer, panchayat R & B Division, surat
₹46,010
26 May 2026
26 May 2026
26 May 2026
15 Jun 2026
26 May 2026
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Excavation for foundation upto 1.5 m depth including sorting
1 out and stacking of useful materials and disposing off the 175.00 CMT. 122.93
excavated stuff upto 50 Meter lead. (A) Loose or soft soil
Excavation for foundation upto 1.5 m to 3.0 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead. (A) Loose or soft soil
Filling available excavated earth (Including rock in trenches
plinth, sides of foundations etc. in layers not exceeding 20 cm. in
depth consolidating each deposited layer by ramming and watering)
Providing & filling in plinth with murrum or yellow soil or
ramming & consolidation etc. complete.
Filling in plinth with sand under floors including watering
ramming, consolidating and dressing complete
Providing and laying cement concrete 1:2:4 (1-Cement : 2- coarse
sand : 4- hand Machine crushed stone aggregates 40 mmnominal
size) and curing complete including cost of formwork in (A) PCC
Providing and laying controlled cement concrete M.250 and
curing complete inculding the cost of formwork but Excluding the
7 cost of reinforcement for reinforced concrete work in foundation, 34.00 CMT. 4494.50
footings base of column and mass concrete. (A) Footing
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing and laying controlled cement concrete M.250 and
curing complete inculding the cost of formwork but Excluding the
8 cost of reinforcement for reinforced concrete work in All Types of 6.00 CMT. 8226.45
Column D) Column, Pillers, posts and struts , upto Plinth
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
9 cost of reinforcement for reinforced concrete work in All Types of 7.50 CMT. 8191.10
Column D) Column, Pillers, posts and struts, upto Ground Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
10 cost of reinforcement for reinforced concrete work in All Types of 7.50 CMT. 8232.05
Column D) Column, Pillers, posts and struts, upto First Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
11 cost of reinforcement for reinforced concrete work in All Types of 4.00 CMT. 8273.01
Column D) Column, Pillers, posts and struts, upto Second Floor
Providing and laying controlled cement concrete M.250 and
curing complete inculding the cost of formwork but Excluding the
cost of the cost of reinforcement for reinforced concrete work in
Beams. (E) Beam, upto Plinth
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
Beams,(E) Beam, Ground Floor
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
Beams,(E) Beam, First Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
Beams,(E) Beam, Second Floor
Providing and laying controlled cement concrete M.200 and
16 curing complete inculding the cost of formwork but Excluding the 14.00 CMT. 6351.89
cost of reinforcement for reinforced concrete work in All Types of
Slab,All Thickness (C) Slab upto Plinth and Ground Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
17 Slab,All Thickness (C) Slab upto First Floor 14.00 CMT. 6392.84
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
Slab,All Thickness (C) Slab upto Second Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
Stair Case,All Thickness (C) Staircase Ground Floor
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All Types of
Stair Case,All Thickness (C) Staircase First Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All
Thickness in Walls PARDI Ground Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in All
Thickness in Walls PARDI First Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in Lintel upto
Ground Floor
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in Lintel. upto
First Floor
Providing and laying controlled cement concrete M.200 and
25 curing complete inculding the cost of formwork but Excluding the 0.50 CMT. 6031.82
cost of reinforcement for reinforced concrete work in Lintel. upto
ProvidingFloor
and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in Chajja. Upto
Ground Floor
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in Chajja. First
Providing and laying controlled cement concrete M.200 and
curing complete inculding the cost of formwork but Excluding the
cost of reinforcement for reinforced concrete work in Chajja.
Second Floor
Providing and fixing TMT bars Fe-500D steel reinforcement for
R.C.C. work including binding, bending and placing in position
complete upto floor two level ,Ground Floor, First Floor , Second
Floor, Third Floor, Terrace Floor (all floor).
Applying general insecticide pest control treatment to floors,
cupboards etc including labour material etc. complete. Using
30 Heptachloride 20 EC. As Per 6113_pests Consentration Weight 128.00 SMT. 91.62
0.50 percent is recommended one litre chemical emulsion dillute
Brick work using common brunt clay building bricks having
crushing strength not less than 35 kg/sqcm. in foundation and
plinth in cement mortar 1:6 (1 cement :6 fine sand) etc.comp. (B)
Conventional Ground floor upto Plinth
Brick work using common brunt clay building bricks having
crushing strength not less than 35 kg/sqcm. in superstructure
above plinth level upto floor two level in cement mortar 1:6 (1
cement :6 fine sand) etc.comp. (B) Conventional Ground Floor
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Brick work using common brunt clay building bricks having
crushing strength not less than 35 kg/sqcm. in superstructure
33 above plinth level upto floor two level in cement mortar 1:6 (1 38.00 CMT. 4545.16
cement :6 fine sand) etc.comp. (B) Conventional First Floor
Brick work using common brunt clay building bricks having
crushing strength not less than 35 kg/sqcm. in superstructure
above plinth level upto floor two level in cement mortar 1:6 (1
cement :6 fine sand) etc.comp. (B) Conventional Second Floor
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or Full/half brick walls for interior
plastering upto floor two level and finished even and smooth in (ii) 243.50 SMT. 161.19
Cement mortar 1:4 (1-cement :4-sand) Ground Floor
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or Full/half brick walls for interior
36 plastering upto floor two level and finished even and smooth in (ii) 243.50 SMT. 185.75
Cement mortar 1:4 (1-cement :4-sand) First Floor
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or Full/half brick walls for interior
plastering upto floor two level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand) Second Floor
Providing & laying10 mm. thick cement plaster in single coat on
fair side of ceilings for interior plastering upto floor two level and
finishing with smooth mala plaster.(i) Cement mortar 1:4 (1
cement : 4 sand) Ground Floor
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing & laying10 mm. thick cement plaster in single coat on
fair side of ceilings for interior plastering upto floor two level and
39 finishing with smooth mala plaster.(i) Cement mortar 1:4 (1 118.50 SMT. 170.71
cement : 4 sand) First Floor
Providing & laying10 mm. thick cement plaster in single coat on
fair side of ceilings for interior plastering upto floor two level and
40 finishing with smooth mala plaster.(i) Cement mortar 1:4 (1 19.00 SMT. 193.10
cement : 4 sand) Second Floor
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
20mm thick sand faced cement plaster on walls upto height
metres above ground level consisting of 12mm thick backing coat
of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of
41 C.M. 1:1 (1-cement : 1-sand) etc. complete. Upto Ground Floor to 450.00 SMT. 315.68
Providing throating or plaster drip and moulding to R.C.C.
42 Chhajja. 58.00 RMT. 44.27
Providing 20 mm deep finished groove in plaster in line and level
etc. Comp. For all Floor
Providing and laying polished Granite Slab 18mm thick in
Flooring laid 20mm thick Cement Mortar 1:4 (1-Cement : 4-
44 Coarse Sand) and jointed with Grey Cement Slurry including full 28.50 SMT. 2377.54
molded round front edges , rubbing and polishing etc. complete.
Providing and laying polished Granite Slab 18mm thick in Risers
of steps Dedo, window sill, jembs and pillars laid 10 mm thick
45 Cement Mortar 1:4 (1-Cement : 4-Coarse Sand) and jointed with 87.00 SMT. 2408.85
Grey Cement Slurry including full molded round edges , rubbing
Providing and laying Double Charge Vitrified tiles 8 to 10 mm
thick , 24'' x 24'' in flooring treads of steps and landing laid on a
46 bed of 12mm thick cement mortar 1:3 (1-cement : 3-coarse sand ) 199.00 SMT. 1322.96
finishing with flush pointing in white cement. add rs 200 for
double charge tiles
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing and laying Double Charge Vitrified tiles 8 to 10 mm
thick , 24'' x 24'' in skrting risers of steps and dedo on 10mm thick
cement plaster 1:3 (1-cement : 3-coarse sand) and jointed with
white cement slurry add rs 200 for double charge tiles
Providing and fixing 37 mm thick flush door both sides laminated
andshutter fabricated from 35 mm thick solid core malemine faced
48 three layered pre laminated flat pressed wood based exterior grade 15.00 SMT. 3767.30
bonded BWP/BWR synthetic resin having stamped IS 12823 gra
Providing and fixing window having extruded aluminum Colour
anodized section frame main outer size 95mm x 24mm x 1.17mm
@ wt.of 0.738 Kg/mt , horizontal Three track member size 92mm
x 31.75mm x 1.30mm,@ Wt.1.07 Kg/mt , vertical member of size
92mm x 31.75mm x 1.50mm @ Wt. 1.06 Kg/mt with sliding
49 shutters of horizontal member size 40 mmx18mm x1.29mm @ 32.55 SMT. 1583.95
wt.of 0.456 Kg/mt, vertical member of size 40mm x 18mm x
mm @ wt.of 0.456Kg/mt/ with 5 mm thick transparent bronze
colour tinted float glass with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass fixing to frame as per
details etc
Providing and fixing M.S. grill of required pattern of windows etc.
with M.S.. flats at required spacing and frame alround square or
50 round headed bolts and nuts or by screws.including applying a 970.50 Kg. 117.16
priming coat of red lead paint and two coats of oil painting
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Applying two coats of Birla (white cement based) or
(acrylic lapy- putty) or equivalent & two coats of primer
of approved brand and manufacture on new wall
surface,Ceiling surface to give an even shade including
thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered
Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
surface,Ceiling surface to give an even shade including
throughly brushing the surface free from mortar
droppings and other foreign matter and sand papered
Providing & applying single coat of textured at external
surface at all floor levels with three coats of weather
proof cement exterior paint of approved standard brands
make at outer side of the building on RCC or Masonary
walls. Rate to include for all labour, materials, staging,
scaffolding, cleaing, curing etc. application of texture
after throughly brushing th`e surface to give an even
shade free from mortar dropping/other foreign matter
etc. complete. application of textures & paints must be
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Applying priming coat over new steel and other metel surface after
and including preparing the surface by throughly cleaning,
oil,grease, dirt and other foreign matter and scoured with brushes
fine steel wood, scrapers and sand paper with ready mixed priming
54 paint brushing red lead. and Painting two coats (excluding priming 17.50 SMT. 128.62
coat) on new steel and other metal surface with enamel paint,
brushing, interior to give an even shade including cleaning the
surface an even shade including cleanicn the surface of all dirt,
dust and other foreign matter.
Steel work welded in built up sections, framed work including
cutting, hoisting, fixing in position and applying a priming coat of
55 red lead paint :- 1.52 Quintal 9108.48
(A) In beams and joints channels angles, column, tees, flats with
connecting plates or angle cleats as in
Providing and fixing in position callapsible steel shutters with
vertical channels 20 x 10 x 2 mm braced with flat iron diagonals
20 x 5 mm size with top and bottom rails of T_rin 40x 40 x 6 mm
with 38mm dia, steel pulleys complete with bolts, nuts, locki
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing and laying integral cement based water proofing
treatment including preparation of surface as required for
treatment of roofs, balconies, terraces etc. consisting of following
operations.
(a) Applying and grouting a slurry coat of neat cement using
kg/sqm of cement admixed with proprietary water proofing
compound comforming to IS:2645 over the R.C.C. slab including
cleaning the surface before tratment.
(b) Laying cement concrete using broken bricks/brick bats 25 mm
to 100 mm size with 50% of cement mortar 1:5 (1 Cement :
57 Coarse sand) admixed with proprietary water proofing compound 118.50 SMT. 880.72
conforming to IS:2645
,brick bats is finally covered by jointless cement plaster 20mm th.
in C.M. 1:4 added with special water proofing compound
confirming to IS:2645 & top smooth finished with trowel with
false chequered marking of 300 mm.size.The treatment is carried
along the vertical surface of the parapet & other adjoining wall
up to height of about 300 mm in a shape of quarter round vata Incl.
curing etc. Comp. With average thickness of 120 mm and
minimum thickness at khurra as 65 mm.
Providing and laying broken chine mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed tiles to be
58 laid over cement mortar 1:3 to plain or slope and to be tempered 118.50 SMT. 779.69
to bring mortar creme out upto surface using
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
Providing, laying and jointing in true line and level 110 diametre
U.P.V.C (Type B) conforming to IS 13592-1992 with one end
plain and other end socketed with rubber ring, & fittings
conforming to ISI 14735-1999 of approved make for drainage
system pipe line, pipe shall be jointed with each other with rubber
59 lubricant, pipe shall be fixed on wall using of PVC clamp of the 22.00 RMT. 878.56
size 110 mm diametre x 149 mm length x 145 mm heigh at every
2000 mm center to center or shall be concealed in walls as directed
including necessary fittings such as bends, shoes etc. including
testing of pipes and joints and jointed with adhesive solvent
cement including cost of all materials.
I we am / are willing to carry out the work at …................................ % above/ Below percent ( Should Be writen in figures And words)
of the estimated rate mentioned above. Amount of my / our tender works out as under.
Estimated Amount Put to tender. 46,00,649.56 Estimated Amount Put to tender.
Deduct…........ % Below Deduct…........ % Below
In Words In Words
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
SHEDULE B Page
Description of Item (With brif Specification And Reference to
Item No. Quantity Unit Rate in Figures Amount
Book of Specifications)
(4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Bidder
Deputy Executive Engineer, Executive Engineer
Panchayat ( R&B) Sub Division, Panchayat ( R&B) Division
Palsana Surat
SHEDULE B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
6.GST GR.pdf
7.Steel Lap.pdf
11. Other GR.pdf
8.Clause 47 48.pdf
14 Building Booklet civil.pdf
Cement consumption gr.pdf
GST GR 1.pdf
Inspection 1.pdf
Laboratory GR 1.pdf
Steel Lap 1.pdf
5.GR.pdf
4.0 tender booklet.pdf
GR.pdf
CamScanner 04-09-2025 15.03.58.pdf
GRs - SBD with Index_11zon (1).pdf
DMO_2876_01-May-2025_273.pdf
SBD સાથે જરૂરી દસ્તાવેજો For VC AND SC.pdf
GRs - SBD with Index_11zon (2).pdf
01 karan drg AND ele g1.pdf
2.0 SBD 60 L KARAN PALSANA.pdf
3.0 Specification 60 L KARAN PALSANA.pdf
BOQ KARAN PALSANA.pdf
Download all tender documents and submit your bid