| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance CHULLIYIL HOUSE PERUMBALLOOR P O MUVATTUPUZHA | -25.50% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹4,409.67 (0.81%)Admitted-Finance | -24.90% | ₹5.5 L+₹4,409.67 (0.81%) | L2 | Admitted-Finance |
| 3 | L3₹6.4 L+₹90,912.70 (16.6%)Admitted-Finance | -13.13% | ₹6.4 L+₹90,912.70 (16.6%) | L3 | Admitted-Finance |
Tender Value
₹7.3 L
EMD Value
₹18,400
Closing Date
18 Aug 2026, 3:00 pmClosed
ASSISTANT ENGINEER 66 KV SUBSTATION KOCHUPAMBA
OFFICE OF THE ASSISTANT ENGINEER (ELECTRICAL ), 66 KV SUBSTATION, K.S.E. BOARD LIMITED, KOCHUPAMPA, PAMBA DAM PO VANDIPERIYAR VIA GAVI , KERALA 685533
Capacity enhancement of 66 KV Substation Kochupamba- Replacing 4 MVA 66/11 KV Transformer No.02 with 66/11 KV,10 MVA Transformer.
2026_KSEB_863999_1
TENDER/26-27/3555/2 DTD 3-8-26
Open Tender
Electrical Works
Percentage
60 days
66 KV SUBSTATION KOCHUPAMPA PAMPA DAM PO
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹18,400
21 Aug 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
4 Aug 2026 - 18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Collecting from store or substation wherever available tools and materials such as jacks pulling and lifting machines,rails,sleepers, plies, ropes, empty drums, dummy plates, bolts and nuts gaskets, etc. including loading and unloading in department vehicle and accompanying and returning the same after completing the work as per the direction of departmental officers.( Only if required) | - | SET | 0.6 | - |
| 2 | Dismantling interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. | - | E | 1 | - |
| 3 | Dismantling of 1 No. 11kV LA (Station type) / 11kV Post insulator from the already erected structure of above
1.5m height , leading to storage place carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. | - | E | 0.2 | - |
| 4 | Dismantling the radiator, conservator tank, EHV bushing turret, connecting pipes, cooling fans, meters, breathers, Buchholz relays of a 110/11KV or 66/11KV 12.5
/ 10 MVA transformer after draining the oil to the required level and blocking the bushing turret, radiator pipe etc. wherever necessary as per the direction of the departmental officer, safely
without damaging any equipment and observing all safety precautions. | - | SET | 0.4 | - |
| 5 | Turning the transformer of weight 20T to 30T,up to 90 degree using required tools safely and taking all precautions as per the directions of the departmental officers ( only if it is absolutely necessary and where departmental crane is not available) | - | SET | 0.2 | - |
| 6 | Pulling the power transformers of weight 20T to 30T, on the rail track, travelling for a distance up to 30M, using sleepers, rails, jacking, pulling and keeping ready for placing on the correct plinth as per the direction of departmental officers at site, safely without damaging any equipments and observing all safety precautions. | - | SET | 0.4 | - |
| 7 | Loading of power transformers of weight 20T to 30T, carefully and safely by jacking up inch by inch using rails sleepers etc. and placing on the tractor trailer safely, positioning correctly and fastening with steel ropes tightening using turnbuckles etc. without causing damage to transformer and accessories as per the direction of the departmental officer observing all safety precautions and make it ready for transporting (Distance to be specified). | - | SET | 0.6 | - |
| 8 | Loading to the department lorry the accessories of 110/11kV or 66/11kV 10/12.5MVA transformer such as bushings with proper package, coolers, conservator tank, connecting pipes, bolt and nuts, wheels, rollers, fans, driving mechanism, cooler control box and oil drums etc. safely fastening them properly, accompanying the vehicle with transformer from ...................... to KOCHUPAMBA SUBSTATION and unloading and stacking in convenient place, taking all safety precautions as per the direction of departmental officers. | - | SET | 0.4 | - |
| 9 | Accompanying the tractor trailer with 110/11kV or 66/11kV 10 /12.5MVA transformer from ......................... to KOCHUPAMBA SUBSTATION with sufficient men to give supports for lifting of service wire/ telephone wires, HT/EHT lines etc. wherever necessary using bamboo structures and giving signals to vehicles also removing other obstruction on the way, filling the gutters wherever necessary using earth, metal etc. | - | SET | 0.6 | - |
| 10 | Unloading the power transformers of weight 20T to 30T, carefully and safely inch by inch inserting rails and trawling to the platform made with sleepers and thus lowering very carefully inch by inch for placing on the rail track and hoisting to the plinth without causing damage to transformer and accessories as per the direction of the departmental officer observing all safety precautions. | - | SET | 0.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
TENDERDOCUMENTS.pdf
Tender Documents • 3.63 MB
BOQ_1461721.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .