Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | -35.77% | ₹1.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹8,335.79 (6.49%)Admitted-Fee/PreQual/Technical/Finance | -31.60% | ₹1.4 L+₹8,335.79 (6.49%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.6 L+₹29,265.22 (22.8%)Admitted-Fee/PreQual/Technical/Finance | -21.13% | ₹1.6 L+₹29,265.22 (22.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.8 L+₹51,513.99 (40.1%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.8 L+₹51,513.99 (40.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Construction of Chain Link Fencing at Anderwan Station of SBF Goabal
2026_PWDJK_322901_1
NIT No.59-2026-27
Open Tender
Civil Works
Percentage
20 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Ganderbal
₹4,000
17 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge All kinds of soil : | 3.39 | Cum | 479.3 | ₹1,624.83 |
| 2 | P/L, of dry stone soling duly hand packed for foundation and backfilling with ramming, dressing, and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete. | 1.12 | Cum | 900 | ₹1,008 |
| 3 | PProviding and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) incl. carriage, Head load all complete. | 6.37 | Cum | 6,591.25 | ₹41,986.26 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. | 13.94 | Sqm | 286.35 | ₹3,991.72 |
| 5 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded ncl. carriage, Head load all complete. | 755 | Kgs | 138.2 | ₹1,04,341 |
| 6 | Fixing of Chain link Fencing b.w.o engagement of Skilled Labours, incl. welding charges and other required accessories (Chain link availabe at site) all complete. | 1,080 | sft. | 9 | ₹9,720 |
| 7 | Painting with synthetic enamel paint on steel work of approved brand and manufacture to give an even shade Two or more coats incl. priming coat. | 200.74 | Sqm | 185.45 | ₹37,227.23 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1085309.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .