| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC 9 463 SANA MANZIL PUNNAPRA PO ALAPPUZHA 688004 | ALAPPUZHA | ALAPPUZHA | KERALA | 688004 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.0 L+₹1,543 (0.78%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹2.0 L
EMD Value
₹4,921
Closing Date
26 Sept 2023, 5:00 pmClosed
Assistant Executive Engineer
PWD Buildings Sub division Alappuzha
GENERAL Telecommunication office Reconstruction of compound wall for Telecommunication office Alappuzha General Civil Work
2023_PWD_604008_1
PWD/BLDG/TR/13983/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
210 days
Alappuzha
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹4,921
Yes
1 Nov 2023
18 Sept 2023
29 Sept 2023
18 Sept 2023
26 Sept 2023
18 Sept 2023
18 Sept 2023 - 26 Sept 2023
Amount
Detailed estimate
15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
50.5.5:Reinforced cement concrete work in arches, archribs, domes, vaults, shells, folded plate and roof having slope more than 15 degree up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size).
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.37.1:White washing with lime to give an even shade:New work (three or more coats)
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
HARIS KA
Bidder Name
HARIFUDEEN
HARIS KA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_899689.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .