Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,881
Closing Date
22 Aug 2026, 4:00 pm
Executive Engineer ED Bramulla
Executive Engineer ED Bramulla
Creation of 63kVA Substation at Bandi Kalimundi Garkote Ward no 01 of ESD Mohura Balance Material Phase-II
2026_PDD_318302_1
EMDB/25 OF 2026-2027
Open Tender
Electrical Works
Turn-key
45 days
Creation of 63kVA Substation at Bandi Kalimundi Ga
Please refer to tender documents
5 documents required · 5 mandatory
₹201
Yes
Executive Engineer ED Bramulla
₹5,881
Yes
28 Jul 2026
28 Jul 2026
25 Aug 2026
28 Jul 2026
22 Aug 2026
30 Jul 2026
28 Jul 2026 - 30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, carriage, loading, un-loadign installation, testing, commissioning etc. of Installation of 63 KVA sub Station at Bandi Kalimundi Garkote Ward No 1(Balance material HT/LT)
work Phase 2nd under CDF Grants Uri 2026-27
(Estimate Enclosed) | 1 | Job | 2,94,055.44 | ₹2,94,055.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_1048005.xls
BOQ • 0.27 MB
DrawingsCumSpecification.pdf
Additional Documents • 18.28 MB
Estimate.pdf
Other Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].