Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.5 LAccepted-Finance | ₹33.5 L | 1 | Accepted-Finance accepted as L1 bidder |
| 2 | 2₹34.7 L+₹1.2 L (3.63%)Accepted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹34.7 L+₹1.2 L (3.63%) | 2 | Accepted-Finance accepted as L2 bidder |
| 3 | 3₹35.8 L+₹2.3 L (6.82%)Accepted-Finance 13A GOPAL JI SHYAMBIHAR COLONY MANDUADIH VARANASI 221103 MANDUADIH VARANASI UTTAR PRADESH 221103 UDYAM UP 75 0016813 | VARANASI | UTTAR PRADESH | 221103 | ₹35.8 L+₹2.3 L (6.82%) | 3 | Accepted-Finance accepted as L3 bidder |
| 4 | 4₹36.6 L+₹3.1 L (9.17%)Accepted-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹36.6 L+₹3.1 L (9.17%) | 4 | Accepted-Finance accepted as L4 bidder |
| 5 | 5₹36.9 L+₹3.4 L (10.3%)Accepted-Finance | ₹36.9 L+₹3.4 L (10.3%) | 5 | Accepted-Finance accepted as L5 bidder |
| Sl No | Description | Qty | Unit | kuldeep singh L2 | A2Z PLANT NUTRIENT PRIVATE LIMITED L3 | PRAMOD KUMAR L1 | Active Plantation L5 | Sanjeev Kumar L4 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) etc complete in all respect. | 3,797.63 | cum | 110 ₹4,17,739.3 Lowest | 450 ₹17,08,933.5 | 120 ₹4,55,715.6 | 290 ₹11,01,312.7 | 115 ₹4,36,727.45 |
| 1.02 | Supplying and stacking of good earth at site including royalty and carriage upto 15 k m lead complete (earth measured in stacks will be reduced by 20% for payment). | 961.01 | cum | 700 ₹6,72,707 Lowest | 700 ₹6,72,707 Lowest | 800 ₹7,68,808 | 775 ₹7,44,782.75 | 790 ₹7,59,197.9 |
| 1.03 | Supplying and stacking at site Dung manure from approved source, including carriage upto 15 km lead complete (manure measured in stacks will be reduced by 8% for payment) : | 366.49 | cum | 810 ₹2,96,856.9 | 800 ₹2,93,192 | 600 ₹2,19,894 Lowest | 800 ₹2,93,192 | 950 ₹3,48,165.5 |
| 1.04 | Rough dressing the trenched ground including breaking clods etc complete in all respect. | 6,329.38 | M2 | 2 ₹12,658.76 Lowest | 15 ₹94,940.7 | 4 ₹25,317.52 | 12 ₹75,952.56 | 2 ₹12,658.76 Lowest |
| 1.05 | Flooding the ground with water including making kiaries and dismantling the same. etc complete in all respect. | 6,329.38 | M2 | 2 ₹12,658.76 Lowest | 10 ₹63,293.8 | 4 ₹25,317.52 | 3 ₹18,988.14 | 3 ₹18,988.14 |
| 1.06 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. etc complete in all respect. | 6,329.38 | M2 | 6 ₹37,976.28 Lowest | 10 ₹63,293.8 | 6 ₹37,976.28 Lowest | 12 ₹75,952.56 | 7 ₹44,305.66 |
| 1.07 | Fine dressing of the ground. etc complete in all respect. | 6,329.38 | M2 | 5 ₹31,646.9 | 15 ₹94,940.7 | 6 ₹37,976.28 | 3 ₹18,988.14 Lowest | 5 ₹31,646.9 |
| 1.08 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). etc complete in all respect.) | 1,960.43 | cum | 70 ₹1,37,230.1 | 60 ₹1,17,625.8 | 55 ₹1,07,823.65 Lowest | 80 ₹1,56,834.4 | 70 ₹1,37,230.1 |
| 1.09 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge. etc complete in all respect. | 1,960.4 | cum | 50 ₹98,020 | 15 ₹29,406 Lowest | 40 ₹78,416 | 140 ₹2,74,456 | 50 ₹98,020 |
| 1.10 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge. | 6,329.38 | M2 | 210 ₹13,29,169.8 | 20 ₹1,26,587.6 Lowest | 120 ₹7,59,525.6 | 80 ₹5,06,350.4 | 220 ₹13,92,463.6 |
Tender Value
₹39.9 L
EMD Value
₹99,720
Closing Date
2 Mar 2026, 11:00 amClosed
SA, ASI, Rajkot
Office of SA, ASI, Old Collectorate compound, Rajkot
DEVELOPMENT OF GARDEN AT BUDDHIST CAVES, JUNAGADH
2026_ASI_898770_1
20/1(8)/H/RJT/2025-26/C
Open Tender
Civil Works
Works
90 days
Buddhist Caves Junagadh
as per tender document
2 documents required · 2 mandatory
₹0
₹99,720
Yes
10 Apr 2026
16 Feb 2026
3 Mar 2026
16 Feb 2026
2 Mar 2026
16 Feb 2026
16 Feb 2026 - 2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) etc complete in all respect. | 3,797.63 | cum | - | - |
| 1.02 | Supplying and stacking of good earth at site including royalty and carriage upto 15 k m lead complete (earth measured in stacks will be reduced by 20% for payment). | 961.01 | cum | - | - |
| 1.03 | Supplying and stacking at site Dung manure from approved source, including carriage upto 15 km lead complete (manure measured in stacks will be reduced by 8% for payment) : | 366.49 | cum | - | - |
| 1.04 | Rough dressing the trenched ground including breaking clods etc complete in all respect. | 6,329.38 | M2 | - | - |
| 1.05 | Flooding the ground with water including making kiaries and dismantling the same. etc complete in all respect. | 6,329.38 | M2 | - | - |
| 1.06 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. etc complete in all respect. | 6,329.38 | M2 | - | - |
| 1.07 | Fine dressing of the ground. etc complete in all respect. | 6,329.38 | M2 | - | - |
| 1.08 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). etc complete in all respect.) | 1,960.43 | cum | - | - |
| 1.09 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge. etc complete in all respect. | 1,960.4 | cum | - | - |
| 1.1 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge. | 6,329.38 | M2 | - | - |
stage.html
html • 0.05 MB
technical_944716.pdf
techsummary_944716.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.45 MB
completeNIT.pdf
Tender Documents • 18.44 MB
BOQ_944716.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .