Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹6,354
Closing Date
5 Sept 2026, 6:55 pm
ASSISTANT ENGINEER
MALAPPURAM MUNICIPALITY
Annual Plan-Malappuram Municipality 2026-27 P No 141Kothengal Road Retarting - Ward 36-General Civil Work
2026_LSGD_866568_12
AE/LID-EW/MLPM/01B/2026-27
Open Tender
Civil Works - Roads
Item Rate
MALAPPURAM MUNICIPALITY
Please refer Tender documents.
10 documents required · 10 mandatory
₹560
Yes
₹6,354
Yes
24 Aug 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
5 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Retarring | |||||
| 1.001 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | - | sqm | - | - |
| 1.002 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.003 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | - | sqm | - | - |
| 1.004 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | - | sqm | - | - |
| 1.005 | OD11064/2026-2027:(OD MORD 4.1.A.1)Granular Sub-base with Well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with plate vibrator to achieve the desired density, complete as per Technical Specification Clause 401.
(i) For Grading I Material | - | cum | - | - |
| 1.006 | OD11065/2026-2027:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4
course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required
including compaction, finishing and tamping etc .complete. Max. size of course
aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per
specification
(i) Nominal mix (1:2:4) | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1466835.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.65 MB
viewnit.pdf
Additional Documents • 0.03 MB
generalestpdfview.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].