Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹138Admitted-Finance | ₹138 | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹1.4 L (100120.9%)Admitted-Finance | ₹1.4 L+₹1.4 L (100120.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 L+₹1.4 L (104924.6%)Admitted-Finance | ₹1.4 L+₹1.4 L (104924.6%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 L+₹1.5 L (105395.7%)Admitted-Finance | ₹1.5 L+₹1.5 L (105395.7%) | L4 | Admitted-Finance |
| 5 | L4₹1.5 L+₹1.5 L (105395.7%)Admitted-Finance | ₹1.5 L+₹1.5 L (105395.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Samir Kumar Pattjoshi Prop.of M/s Matru Shakti Electricals L1 | SK Engineers India Pvt Ltd L2 | G-ON ENERGY CONTROLS L3 | THE ORISSA SMALL INDUSTRIES CORPORATION LIMITED L4 | AKHANDALAMANI ELECTRICALS AND CONSTRUCTION L4 | TULSYAN ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of 10 (ten) numbers of LED Street Lights on selected existing LT electric poles within the jurisdiction Districts of Odisha on Turn Key basis including cost of transmission cable, GI brackets, high power 80 watt LED lights, GI fixtures with a boom length of 2.8 meter, photo switch with timer and Energy Meter for each cluster of 10 Street Lights and sign board on each street light pole along with 3 years Guarantee Period & comprehensive AMC period for each cluster of 10 street lights for 5 years after completion of the guarantee period in one village of the Grampanchayat within the jurisdiction of the concerned Districts in Odisha. All materials and installations should be as per the technical specification mentioned in the Section- V of DTCN and complete in all respect as per the direction of the Engineer in charge. | 1 | Nos | - | - | - | - | - | - |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
10 Feb 2020, 5:00 pmClosed
EIC RWSS ODISHA BHUBANESWAR
EIC RWSS ODISHA BHUBANESWAR
Implementation of LED Street Lighting System in one Village of each Gram Panchayat(GP) of BARGARH District in Odisha on Turn-Key basis
2019_RWSS_58273_1
EIC/RWSS/30-2/2019-20
Open Tender
Miscellaneous Goods
Turn-key
180 days
Baragarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
Under Secretary cum DDO PRandDW Department
₹7.4 L
Yes
EIC RWSS ODISHA BHUBANESWAR
2 Jul 2020
28 Dec 2019
14 Feb 2020
28 Dec 2019
10 Feb 2020
28 Dec 2019
28 Dec 2019 - 8 Jan 2020
9 Jan 2020
Amount
SK Engineers India Pvt Ltd
G-ON ENERGY CONTROLS
THE ORISSA SMALL INDUSTRIES CORPORATION LIMITED
AKHANDALAMANI ELECTRICALS AND CONSTRUCTION
TULSYAN ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
RfPBARGARH.pdf
Tender Documents • 1.95 MB
BOQ_306723.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .