Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC Work awarded to L1 |
| Sl No | Description | Qty | Unit | SURVEXINFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Investigation work | ||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.5 | Hectare | 45,000 ₹22,545 |
| 1.00 | OD93831/2025-2026:Total station surveying and preparation of site plan and open area without hindrance to line of sight with 1m contour intervals,with 5m x 5m interval | 0.5 | Hectare | 15,000 ₹7,515 |
| 1.00 | OD93896/2025-2026:Preparing alignment for proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the engineering aesthetic and economic requirement, designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment, plan and profile drawings and also preparing the LS and CS at interval of 50m C/C including junction designing (wherever required) and preparation of Junction drawings. | 0.83 | km | 15,000 ₹12,525 |
| 1.00 | OD100661/2025-2026:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete | 0.83 | km | 30,000 ₹25,050 |
| 1.00 | 8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting . | 58 | no | 1,060 ₹61,480 |
| 1.01 | OD93895/2025-2026:Mobilization including transportation of all necessary plant and equipments and materials of boring,field testing and sampling and demobilization after completing the work - for machine boring | 1 | set | 16,000 ₹16,000 |
| 1.01 | OD93894/2025-2026:Providing access to the site clearing and making good to errecting and conducting soil testing transfers within the site and for any other temporary arrangments to be errected within the area in connection with conducting soil testing(Modified DAR 56.17.1) | 300 | sqm | 27 ₹8,100 |
| 1.01 | OD93893/2025-2026:Setting up boring at each bore hole locations including carrying all necessary plant,equipment and materials of boring and field and field tests and collection of samples at each bore hole location-For machine boring | 3 | no | 3,000 ₹9,000 |
| 1.01 | OD97331/2025-2026:Boring with rotary power drilling equipments in - all types of soil having N value less than 50 excluding hard rock,soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals-for ordinary soil(Modified DAR 56.3.a.1) | 30 | metre | 950 ₹28,500 |
Tender Value
₹3.0 L
EMD Value
₹7,524
Closing Date
29 Oct 2025, 3:00 pmClosed
Assistant executive engineer
Office of the Assistant Executive Engineer Roads Subdivision Koyilandy
the investigation work comprises Clearing and Grubbing the site, conducting a Total Station Survey, and preparing the Road Alignment Design and Drawings. This includes Alignment Superimposition on the Field Measurement Book for land acquisition plan
2025_PWD_806582_2
D2/TN/09/2025-2026
Open Tender
Civil Works - Roads
60 days
Koyilandy
Contractor should have a valid registration certificat
14 documents required · 14 mandatory
₹665
Yes
₹7,524
13 Jan 2026
21 Oct 2025
31 Oct 2025
21 Oct 2025
29 Oct 2025
21 Oct 2025
Amount
Investigation work
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
OD93831/2025-2026:Total station surveying and preparation of site plan and open area without hindrance to line of sight with 1m contour intervals,with 5m x 5m interval
OD93896/2025-2026:Preparing alignment for proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the engineering aesthetic and economic requirement, designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment, plan and profile drawings and also preparing the LS and CS at interval of 50m C/C including junction designing (wherever required) and preparation of Junction drawings.
OD100661/2025-2026:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
OD93895/2025-2026:Mobilization including transportation of all necessary plant and equipments and materials of boring,field testing and sampling and demobilization after completing the work - for machine boring
OD93894/2025-2026:Providing access to the site clearing and making good to errecting and conducting soil testing transfers within the site and for any other temporary arrangments to be errected within the area in connection with conducting soil testing(Modified DAR 56.17.1)
OD93893/2025-2026:Setting up boring at each bore hole locations including carrying all necessary plant,equipment and materials of boring and field and field tests and collection of samples at each bore hole location-For machine boring
OD97331/2025-2026:Boring with rotary power drilling equipments in - all types of soil having N value less than 50 excluding hard rock,soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals-for ordinary soil(Modified DAR 56.3.a.1)
OD101235/2025-2026:Conducting subsoil investigation test at suitable intervals including taking samples, grain size analysis, temperature measurement, Atterberg limit, Proctor compaction, Soaked CBR value, Soil bulk & dry densities, Shear strength parameters, Consolidation parameters etc. submitting compiles report as per the IRC guide lines and direction of departmental officers
OD93890/2025-2026:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test(report in triplicate)- Machine boring for 5 bore holes
OD93888/2025-2026:Preparation of quantities of earth work cutting and filling pavement design from test result level calculations and drawing etc. in each consultation with the Engineer in charge.
Bidder Name
SURVEXINFRA PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1358261.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 1.63 MB
nit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid