| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC Work awarded to L1 |
| Sl No | Description | Qty | Unit | SURVEXINFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Investigation work | ||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.5 | Hectare | 45,000 ₹22,545 Lowest |
| 1.00 | OD93831/2025-2026:Total station surveying and preparation of site plan and open area without hindrance to line of sight with 1m contour intervals,with 5m x 5m interval | 0.5 | Hectare | 15,000 ₹7,515 Lowest |
| 1.00 | OD93896/2025-2026:Preparing alignment for proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the engineering aesthetic and economic requirement, designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment, plan and profile drawings and also preparing the LS and CS at interval of 50m C/C including junction designing (wherever required) and preparation of Junction drawings. | 0.83 | km | 15,000 ₹12,525 Lowest |
| 1.00 | OD100661/2025-2026:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete | 0.83 | km | 30,000 ₹25,050 Lowest |
| 1.00 | 8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting . | 58 | no | 1,060 ₹61,480 Lowest |
| 1.01 | OD93895/2025-2026:Mobilization including transportation of all necessary plant and equipments and materials of boring,field testing and sampling and demobilization after completing the work - for machine boring | 1 | set | 16,000 ₹16,000 Lowest |
| 1.01 | OD93894/2025-2026:Providing access to the site clearing and making good to errecting and conducting soil testing transfers within the site and for any other temporary arrangments to be errected within the area in connection with conducting soil testing(Modified DAR 56.17.1) | 300 | sqm | 27 ₹8,100 Lowest |
| 1.01 | OD93893/2025-2026:Setting up boring at each bore hole locations including carrying all necessary plant,equipment and materials of boring and field and field tests and collection of samples at each bore hole location-For machine boring | 3 | no | 3,000 ₹9,000 Lowest |
| 1.01 | OD97331/2025-2026:Boring with rotary power drilling equipments in - all types of soil having N value less than 50 excluding hard rock,soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals-for ordinary soil(Modified DAR 56.3.a.1) | 30 | metre | 950 ₹28,500 Lowest |
Tender Value
₹3.0 L
EMD Value
₹7,524
Closing Date
29 Oct 2025, 3:00 pmClosed
Assistant executive engineer
Office of the Assistant Executive Engineer Roads Subdivision Koyilandy
the investigation work comprises Clearing and Grubbing the site, conducting a Total Station Survey, and preparing the Road Alignment Design and Drawings. This includes Alignment Superimposition on the Field Measurement Book for land acquisition plan
2025_PWD_806582_2
D2/TN/09/2025-2026
Open Tender
Civil Works - Roads
Item Rate
60 days
Koyilandy
Contractor should have a valid registration certificat
14 documents required · 14 mandatory
₹665
Yes
₹7,524
13 Jan 2026
21 Oct 2025
31 Oct 2025
21 Oct 2025
29 Oct 2025
21 Oct 2025
Amount
Investigation work
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
OD93831/2025-2026:Total station surveying and preparation of site plan and open area without hindrance to line of sight with 1m contour intervals,with 5m x 5m interval
OD93896/2025-2026:Preparing alignment for proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the engineering aesthetic and economic requirement, designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment, plan and profile drawings and also preparing the LS and CS at interval of 50m C/C including junction designing (wherever required) and preparation of Junction drawings.
OD100661/2025-2026:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
OD93895/2025-2026:Mobilization including transportation of all necessary plant and equipments and materials of boring,field testing and sampling and demobilization after completing the work - for machine boring
OD93894/2025-2026:Providing access to the site clearing and making good to errecting and conducting soil testing transfers within the site and for any other temporary arrangments to be errected within the area in connection with conducting soil testing(Modified DAR 56.17.1)
OD93893/2025-2026:Setting up boring at each bore hole locations including carrying all necessary plant,equipment and materials of boring and field and field tests and collection of samples at each bore hole location-For machine boring
OD97331/2025-2026:Boring with rotary power drilling equipments in - all types of soil having N value less than 50 excluding hard rock,soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals-for ordinary soil(Modified DAR 56.3.a.1)
OD101235/2025-2026:Conducting subsoil investigation test at suitable intervals including taking samples, grain size analysis, temperature measurement, Atterberg limit, Proctor compaction, Soaked CBR value, Soil bulk & dry densities, Shear strength parameters, Consolidation parameters etc. submitting compiles report as per the IRC guide lines and direction of departmental officers
OD93890/2025-2026:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test(report in triplicate)- Machine boring for 5 bore holes
OD93888/2025-2026:Preparation of quantities of earth work cutting and filling pavement design from test result level calculations and drawing etc. in each consultation with the Engineer in charge.
Bidder Name
SURVEXINFRA PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1358261.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 1.63 MB
nit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .