| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-Finance | ₹15.1 L | L1 | Accepted-Finance ok |
| 2 | L2₹17.4 LAccepted-Finance | ₹17.4 L | L2 | Accepted-Finance ok |
| 3 | L3₹17.6 LAccepted-Finance | ₹17.6 L | L3 | Accepted-Finance ok |
Tender Value
₹16.2 L
EMD Value
₹16,192
Closing Date
15 Mar 2026, 5:00 pmClosed
EO
Basudevpur Municipality
Construction of Lift system of Basudevpur Municipality
2026_ORULB_126831_6
BSP_2026-27_05
Open Tender
Civil Works - Others
45 days
Basudevpur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,192
Yes
10 Jun 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
15 Mar 2026
6 Mar 2026
Dismantling brick or stone masonry in lime or cement mortar above 3m. height incl.stacking the useful materials for reuse & removing the debris within 50m. Lead etc. complete.(First Floor Roof Beam )
Second Floor Roof Beam
Mumty Room
Dismantling and removing R.C.C.column,beam slab,staircase,landing,lintel incl.stacking the useful materials for reuse &removing the debris within 50m. lead etc. complete.(Ground Floor Roof Beam)
First Floor Roof Beam
Second Floor Roof Beam
Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect
Supplying filling in foundation and plinth with sand including watering and ramming,poking & compacting and dressed and levelled to proper gradient including cost, conveyance, royalities, taxes of materials and cost of all labour,labour cess,T&P etc required for the workcomplete as directed by the Engineer-in-charge.
Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C.
R.C.C work of M-25 grade having a minimum compressive strength in work test of 250 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordence with IS 456 IS516 using 20 mm down graded size black hard granite stone chips of approved quality from approved quarry including hoisting lowering and laying concrete and compting by using vibrates watering and curing ,finishing the exposed surface smooth,providing grooves and beads where necessary in all heights complete including cost , conveyance, royalityies, taxes of all materials, cost of all labour, labour cess and all T&P etc required for the work complete in all respect but excluding centering ,shuttering and reinforecment as per the direction of the Engineer-in-charge. Raft
Ground Floor Column C1
First Floor Column C1
Second Floor Column C1
Mumty Room Floor Column C1
Grade Beam B3
Ground Floor Beam B1
Ground Floor Beam B2
First Floor Beam B1
First Floor Beam B2
Second Floor Beam B1
Second Floor Beam B2
Mumty Room Beam B2
Mumty Room Slab
Supplying ,Straightening,cutting,bending bent up or coiled rods,including cranking, hooking, welding or jointing the MS rods or tor confirming to IS431(Plain) and 1785(Tor) steel and binding,laying the grills,hoisting,lowering and placing in proper position required for RCC works including cost,conveyance and taxes of specified rods and binding wire of 18 20 gauge confirming to IS 280(galvanised minimum 1mm) and cost of all labour,labour cess with allT&P requird for the work etc complete as directed by the Engineer-in-Charge(Ground Floor R.C.C Qty )
First Floor R.C.C Qty
Second Floor R.C.C Qty
Mumty Room R.C.C Qty
Rigid & smooth centering & shuttering for R.C.C work etc. complete.(R.C.C Raft )
Column C1
Ground Floor
First Floor
Second Floor
Mumty Room
Beam (Ground Floor )
First Floor
Second Floor
Mumty Room
Roof Slab (Slab )
Brick work cement moratr (1:6)with Flyash brick 25cm x 12cm x 8cm having crushing strength not less than 75kg / cm2 with dimentional tolerance +2% in cement mortar including all cost, carriage & royalty of materials etc. complete as per direction of Engineer-in-Charge.(Foundation )
Ground Floor
First Floor
First Floor Balcony Portion
First Floor Balcony Portion
Second Floor
Second Floor Balcony Portion
Second Floor Balcony Portion
Mumty Room
Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge.(External Wall Sub Structure)
Ground Floor
First Floor
First Floor Balcony Portion
First Floor Balcony Portion
Second Floor
Second Floor Balcony Portion
Second Floor Balcony Portion
Mumty Room
Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge.(Internal Wall Sub Structure)
Ground Floor
First Floor
First Floor Balcony Portion
First Floor Balcony Portion
Second Floor
Second Floor Balcony Portion
Second Floor Balcony Portion
Mumty Room
Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge.
2.5cm.th.D.P.C. with C.C (1:2:4) using 12mm.size BHGCB chips etc, complete.
Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint.(Ground Floor )
First Floor Inside Side
First Floor Outer Side
First Floor Balcony Portion
First Floor Balcony Portion
First Floor Inner Side
First Floor Balcony Portion
First Floor Balcony Portion
Second Floor Outer Side
Second Floor Balcony Portion
Second Floor Balcony Portion
Second Floor Inner Side
Second Floor Balcony Portion
Second Floor Balcony Portion
Mumty Room (Inner Side)
Mumty Room (Outer Side)
Priming one coat with any approved wall primer including all labour etc complete . (Ground Floor )
First Floor Outer Side
First Floor Balcony Portion
First Floor Balcony Portion
First Floor Inner Side
First Floor Balcony Portion
First Floor Balcony Portion
Second Floor Outer Side
Second Floor Balcony Portion
Second Floor Balcony Portion
Second Floor Inner Side
Second Floor Balcony Portion
Second Floor Balcony Portion
Mumty Room (Inner Side)
Mumty Room (Outer Side)
Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge.(Ground Floor )
First Floor Outer Side
First Floor Balcony Portion
First Floor Balcony Portion
First Floor Inner Side
First Floor Balcony Portion
First Floor Balcony Portion
Second Floor Outer Side
Second Floor Balcony Portion
Second Floor Balcony Portion
Second Floor Inner Side
Second Floor Balcony Portion
Second Floor Balcony Portion
Mumty Room (Inner Side)
Mumty Room (Outer Side)
6.0 sq mm ISI marked FR PVC insulated (unseathed) single core copper conductor
S.P. 15/1 6 amps, one way modular switch, ISI marked
S.P. 5 /6 amps, two way modular switch, ISI marked
3 pin 5 / 6 amps, modular socket outlet, ISI marked
200mm x 300mm x 100mm deep metal box 18 SWG
Earthwork in all kinds of soil etc complete in all respect. (Quantity has taken on Lumpsum Basis)
25 mmx 5 mm G.l. strip (1.0 kg / Mtr)
25 mmx 5 mm Copper tape (1.15 Kg / Mtr)
6 SWG G.l. wire
8 SWG Copper wire (4.0 mm dia)
Lightning finial, 25 mm dia x 300 mm long copper
Charcoal
Supply And Installation of Passenger Lift 3nos person 200KG Capcity
Stagging and Scafolding work
Display board & photograph
Sub Total
SGST 9% of Sub-Total
CGST 9% of Sub-Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_583708.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_583708.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid