| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-AOC VILL P O BANGALJHORA PS BIJNI DIST CHIRANG ASSAM PIN 783390 | BIJNI | CHIRANG | ASSAM | 783390 | ₹44.8 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹44.8 LRejected-Finance C O HARU CH DEY KACHUGAON P O P S KACHUGAON DIST KOKRAJHAR BTC ASSAM PIN 783370 | KACHUGAON | KOKRAJHAR | ASSAM | 783370 | ₹44.8 L | L2 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | SRI BIBEKANANDA DEY L2 | SANTOSH CHANDRA ROY L1 |
|---|---|---|---|---|---|
| 1.00Gabion Check Dam | |||||
| 1.01 | Clearing and grubbing road land including uprooting rank, vegetation, grass, shrubs, bushes, saplings & trees girth upto 300mm, removal of stumps of trees cut earlier & disposable of unservicable materials and sauctioned upto lead of 1000m including removal. | 0.02 | Hect. | 55,808.98 ₹1,116.18 | 55,808.98 ₹1,116.18 |
| 1.02 | Excavation for structures: E/w in excavation of foundation of structures as per drawings & technical specifications including setting out, construction of shoring & bracing, removal of stumps and other deleterious matter, dressing of sides and bottom & backfilling with approved material. | 400 | Cum | 159.46 ₹63,784 | 159.46 ₹63,784 |
| 1.03 | Providing & laying of boulder apron laid in wire crates with 4mm dia GI wire conforming to IS:280 and IS:4826 in 100mm X 100mm mesh (woven diagonally) including 10% extra for laps & joints with stone boulders weighing not less than 25kg each as per drawing and Technical Specification Clause 1301. | 143 | Cum | 2,928.23 ₹4.2 L | 2,928.23 ₹4.2 L |
| 1.04 | Cost.of Haulage and loading and unloading of man size boulder in project site. (Enclosed rate analysis) | 143 | Cum | 1,061 ₹1.5 L | 1,061 ₹1.5 L |
| 1.05 | Providing & laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing & technical specification & as directed by the Engineer in charge complete. | 90 | Cum | 217 ₹19,530 | 215.03 ₹19,352.70 |
| 1.06 | Providing and laying RCC signboard incluyding writing in engrave lettering. | 1 | No. | 12,285 ₹12,285 | 12,285 ₹12,285 |
| 2.00BrickChannel | |||||
| 2.01 | Preparation of site including removal of mud & cleaning the jungle etc. complete as directed.. | 0.07 | Hect. | 55,808.98 ₹3,962.44 | 55,808.98 ₹3,962.44 |
| 2.02 | Earth work in excavation of foundation of trenches including filling up to trenchers & removal of surplus spoil etc. Manual Means (upto 3 m depth)(Without dewatering) Above G.B.L. (Slope1:2) | 1,232.14 | Cum | 145.18 ₹1.8 L | 145.18 ₹1.8 L |
Tender Value
₹44.8 L
EMD Value
₹89,573
Closing Date
9 Feb 2026, 2:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Gully Control Project at Sonapur village under Titaguri Blocl, Kokrajhar under RIDF-XXXI
2026_SCD_50305_4
Tender/NIT/Pt-I/2025-26/7296
Open Tender
Civil Works
120 days
Kokrajhar Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹900
₹89,573
Yes
O/o The DSC, Assam
14 Mar 2026
17 Jan 2026
9 Feb 2026
20 Jan 2026
9 Feb 2026
22 Jan 2026
22 Jan 2026
Gabion Check Dam
Clearing and grubbing road land including uprooting rank, vegetation, grass, shrubs, bushes, saplings & trees girth upto 300mm, removal of stumps of trees cut earlier & disposable of unservicable materials and sauctioned upto lead of 1000m including removal.
Excavation for structures: E/w in excavation of foundation of structures as per drawings & technical specifications including setting out, construction of shoring & bracing, removal of stumps and other deleterious matter, dressing of sides and bottom & backfilling with approved material.
Providing & laying of boulder apron laid in wire crates with 4mm dia GI wire conforming to IS:280 and IS:4826 in 100mm X 100mm mesh (woven diagonally) including 10% extra for laps & joints with stone boulders weighing not less than 25kg each as per drawing and Technical Specification Clause 1301.
Cost.of Haulage and loading and unloading of man size boulder in project site. (Enclosed rate analysis)
Providing & laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing & technical specification & as directed by the Engineer in charge complete.
Providing and laying RCC signboard incluyding writing in engrave lettering.
BrickChannel
Preparation of site including removal of mud & cleaning the jungle etc. complete as directed..
Earth work in excavation of foundation of trenches including filling up to trenchers & removal of surplus spoil etc. Manual Means (upto 3 m depth)(Without dewatering) Above G.B.L. (Slope1:2)
Providing soling in foundation and under floor with stone/best jhama brick,sand packed after preparing the subgrade.
Providing PCC work in foundation with 13 mm to 38 mm size down graded gravel including curing bailing out water shoring where necessary finishing etc. complete as directed (in prop 1:3:6)
Providing RCC work with prop. 1:2:4 in foundation, abutment of wing wall with proper reinforcement as per design and specification as directed. Cost of reinforcement will be paid seperately)
Supplying of reinforcement (TMT) in position to reinforced cement concrete work with two piles 0.9mm (20 S.W.G) annealed wire as per specification etc. complete as directed
Brick masonry work in 1:4 in substructure complete excepting pointing and plastering, as per drawing and technical specification.
Cement plastering 12mm, thick in prop 1:3 including cleaning the surface & curing etc. complete as directed
Providing & Laying hand tube well
Providing RCC sign board including painting & writing in engrave lettering etc.
Culvert
Preparation of site including removal of mud & cleaning the jungle etc. complete as directed..
Earth work in excavation of foundation of trenches including filling up to trenchers & removal of surplus spoil etc. Manual Means (upto 3 m depth)(Without dewatering) Above G.B.L. (Slope1:2)
Providing soling in foundation and under floor with stone/best jhama brick,sand packed after preparing the subgrade.
Providing PCC work in foundation with 13 mm to 38 mm size down graded gravel including curing bailing out water shoring where necessary finishing etc. complete as directed (in prop 1:3:6)
Providing RCC work with prop. 1:2:4 in foundation, abutment of wing wall with proper reinforcement as per design and specification as directed. Cost of reinforcement will be paid seperately)
Supplying of reinforcement (TMT) in position to reinforced cement concrete work with two piles 0.9mm (20 S.W.G) annealed wire as per specification etc. complete as directed
Cement plastering 12mm, thick in prop 1:3 including cleaning the surface & curing etc. complete as directed
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
KokrajharSonapurTitatugi.pdf
Tender Documents • 0.97 MB
BOQ_80146.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid