| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹78.5 L+₹3.4 L (4.57%)Rejected-AOC | L2 | Rejected-AOC l2 | |
| 3 | L3₹88.5 L+₹13.5 L (17.9%)Rejected-AOC 25 P NO 310 | L3 | Rejected-AOC L3 | |
| 4 | L4₹91.5 L+₹16.5 L (21.9%)Rejected-AOC ANAS MANZIL KALLELIBHAGOM KARUNAGAPPALLY 690519 KOLLAM DIST KERALA | KOLLAM | KERALA | 690519 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | anees rahim L4 | MADATHIL L2 | MERP CONSTRUCTIONS PRIVATE LIMITED L1 | SHAJI.P L3 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix A | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 94.88 | cum | 380 ₹36,055.16 | 359 ₹34,062.64 | 246 ₹23,340.97 Lowest | 390 ₹37,003.98 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 106.67 | cum | 370 ₹39,467.53 | 318 ₹33,920.74 | 268 ₹28,587.29 Lowest | 345 ₹36,800.81 |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 52.58 | cum | 800 ₹42,066.4 | 729 ₹38,333.01 Lowest | 1,162 ₹61,101.45 | 801 ₹42,118.98 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 24.2 | cum | 9,000 ₹2,17,809 | 7,932 ₹1,91,962.33 Lowest | 7,979.52 ₹1,93,112.36 | 8,700 ₹2,10,548.7 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.7 | cum | 9,200 ₹24,840 | 8,569 ₹23,136.3 Lowest | 9,276 ₹25,045.2 | 9,425 ₹25,447.5 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 114.3 | sqm | 420 ₹48,006 | 386 ₹44,119.8 | 371.78 ₹42,494.45 Lowest | 420 ₹48,006 |
| 1.01 | OD137247/2025-2026:Providing and laying in position machine batched and machine mixed design mix M30 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but
excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per
direction of Engineer - in-charge. Note:- Cement content considered in this item is @
340kg/ cum.<br>All work upto plinth level (As per 5.33.1) | 60.69 | cum | 15,000 ₹9,10,290 | 11,421 ₹6,93,094.81 | 9,600 ₹5,82,585.6 Lowest | 12,550 ₹7,61,609.3 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 10,476.54 | kilogram | 125 ₹13,09,567.5 | 101 ₹10,58,130.54 Lowest | 117.25 ₹12,28,374.32 | 123 ₹12,88,614.42 |
| 1.01 | OD137252/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately. All work above plinth level upto floor V level. | 78.55 | cum | 15,000 ₹11,78,205 | 13,012 ₹10,22,053.56 | 9,840 ₹7,72,902.48 Lowest | 14,300 ₹11,23,222.1 |
Tender Value
₹80.9 L
EMD Value
₹50,000
Closing Date
19 May 2026, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Buildings Division Alappuzha
GENERAL Budget Work 2025 26 Construction of new School Building for Thayyil thekku Govt LPS Construction of new School Building General Civil Work
2026_PWD_850438_1
PWD/BLDG/TR/11004/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Alappuzha
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
4 Jul 2026
13 May 2026
21 May 2026
13 May 2026
19 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.8 | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 0.6 | cum | - | - |
| 1.003 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.007 | OD137247/2025-2026:Providing and laying in position machine batched and machine mixed design mix M30 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but
excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per
direction of Engineer - in-charge. Note:- Cement content considered in this item is @
340kg/ cum.<br>All work upto plinth level (As per 5.33.1) | 1 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.009 | OD137252/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately. All work above plinth level upto floor V level. | 0.8 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1437012.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
PRI.pdf
Other Document • 0.26 MB
epy.pdf
Other Document • 0.07 MB
sbd_compressed.pdf
Tender Documents • 34.13 MB
bis.pdf
Other Document • 0.56 MB
affi.pdf
Other Document • 0.02 MB
BOQ_1437012.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .