Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹8,100
Closing Date
1 Jul 2026, 4:30 pm
EE OFFICE - PARVATHIPURAM
Parvathipuram
Maintenance of Corenet Roads in (R&B) Section, Veeraghattam for the year 2026 - 2027 in Parvathipuram Manyam District.
947227
NIT No 10/EE/R&B/PVP/2026-27 Dated: 05-06-2026
OPEN - NCB
Road Work
PARVATHIPURAM MANYAM
8 documents required · 8 mandatory
₹285
₹8,100
13 Jun 2026
13 Jun 2026
13 Jun 2026
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Providing BT Patch work for Pot holes of depth ranging from 70mm and above using 40mm HBG metal with arequired quantity of 10/12 mm HBG M/C key chips and 80/100 Grade Bitumen at 42 Kgs per 1Cum of work for filling the pot holes and ceiling the filled up pot hole with 15c thick layer using 10-12mm HBG chips and 80100 grade Bitumen at 72kg 1cu including reoval of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole ccopacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Providing BT Patch work for Pot holes of depth ranging from 70mm and above using 40mm HBG metal with arequired quantity of 10/12 mm HBG M/C key chips and 80/100 Grade Bitumen at 42 Kgs per 1Cum of work for filling the pot holes and ceiling the filled up pot hole with 15c thick layer using 10-12mm HBG chips and 80100 grade Bitumen at 72kg 1cu including reoval of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole ccopacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
Providing BT Patch work for Pot holes of depth ranging from 70mm and above using 40mm HBG metal with arequired quantity of 10/12 mm HBG M/C key chips and 80/100 Grade Bitumen at 42 Kgs per 1Cum of work for filling the pot holes and ceiling the filled up pot hole with 15c thick layer using 10-12mm HBG chips and 80100 grade Bitumen at 72kg 1cu including reoval of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole ccopacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
Providing BT Patch work for Pot holes of depth ranging from 70mm and above using 40mm HBG metal with arequired quantity of 10/12 mm HBG M/C key chips and 80/100 Grade Bitumen at 42 Kgs per 1Cum of work for filling the pot holes and ceiling the filled up pot hole with 15c thick layer using 10-12mm HBG chips and 80100 grade Bitumen at 72kg 1cu including reoval of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole ccopacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Providing BT Patch work for Pot holes of depth ranging from 70mm and above using 40mm HBG metal with arequired quantity of 10/12 mm HBG M/C key chips and 80/100 Grade Bitumen at 42 Kgs per 1Cum of work for filling the pot holes and ceiling the filled up pot hole with 15c thick layer using 10-12mm HBG chips and 80100 grade Bitumen at 72kg 1cu including reoval of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole ccopacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Towards hire charges of JCB including all operational, machinery and al labour charges for all operations and all transportational charges etc., complete as directed by the Departmental officers. for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Towards hire charges of JCB including all operational, machinery and al labour charges for all operations and all transportational charges etc., complete as directed by the Departmental officers. for Veeraghattam - Narasipuram Road from Km. 0/0 to 8/900
Towards hire charges of JCB including all operational, machinery and al labour charges for all operations and all transportational charges etc., complete as directed by the Departmental officers. for Donubhai - Neelakantapuram Road from Km. 0/0 to 5/0
Towards hire charges of JCB including all operational, machinery and al labour charges for all operations and all transportational charges etc., complete as directed by the Departmental officers. for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Towards hire charges of JCB including all operational, machinery and al labour charges for all operations and all transportational charges etc., complete as directed by the Departmental officers. for CSP Road ( at Nadukuru) to J.K Gumada from Km. 0/0 to 4/200
Provision for engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Provision for engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Provision for engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Provision for engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Provision for engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work for Calingapatnam - Srikakulam - Parvathipuram Road from Km. 80/0 to 90/0
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQItemswb NIT 10.xlsx
TENDER_DOCUMENT • 0.63 MB
NIT No.10 Sch-A.xlsm
TENDER_DOCUMENT • 0.04 MB
NIT No 10 Particulars.xls
TENDER_DOCUMENT • 0.04 MB
NIT 10 Bid.doc
TENDER_DOCUMENT • 1.20 MB
Download all tender documents and submit your bid