Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.1 L+₹18,051.71 (6.22%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-CDR Is Before NIT |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
19 Aug 2026, 5:55 pmClosed
Executive Engineer
Xen
As boq
2026_RDPR_320642_11
63 REW Samba of 2026-27 Dated12-08-2026
Open Tender
Civil Works
Percentage
60 days
Sumb
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹10,000
8 Sept 2026
14 Aug 2026
19 Aug 2026
14 Aug 2026
19 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 24.21 | cum | 479.3 | ₹11,603.85 |
| 2 | Providing in position cement concrete of specified grade excluding the c/o centring and shuttering ( all work upto plinth level ), 1:3:6( 1: cement 3: coarse sand : 6Crushed stone aggregate 20mm nominal size, | 62.12 | cum | 5,733.6 | ₹3,56,171.23 |
| 3 | Providing in position cement concrete of specified grade excluding the c/o centring and shuttering ( all work upto plinth level ), 1:5:10( 1: cement 5: coarse sand : 10Crushed stone aggregate 20mm nominal size, | 2.02 | cum | 4,826.5 | ₹9,749.53 |
| 4 | Earth work in Rough Eavate filling into earth Depression Etc | 91.62 | cum | 256 | ₹23,454.72 |
| 5 | Shuttering Foundation (Walls) | 97.28 | sqm | 628.95 | ₹61,184.26 |
| 6 | Dumping of Stone | 18.93 | cu.m | 700 | ₹13,251 |
| 7 | Sand 5km | 29.31 | cum | 200.74 | ₹5,883.69 |
| 8 | Bajri 5Km | 57.98 | cum | 200.74 | ₹11,638.91 |
| 9 | Stone 5 km | 18.94 | cum | 217 | ₹4,109.98 |
| 10 | Sign Board | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_1067097.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .