| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹12.5 L+₹18,591.77 (1.51%)Rejected-AOC LSGD SECTION MALAYALAPUZHA GRAMA PANCHAYATH | PALAKKAD | KERALA | 678001 | 2 | Rejected-AOC L1 |
| Sl No | Description | Qty | Unit | roshan engineering works L1 | SHYJU T JOHN L2 |
|---|---|---|---|---|---|
| 1.00SIDE PROTECTION WALL | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 16.68 | cum | 359.72 ₹6,000.13 Lowest | 360 ₹6,004.8 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.34 | cum | 7,932.89 ₹26,464.12 Lowest | 8,000 ₹26,688 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.34 | cum | 10,488.77 ₹1,39,962.15 Lowest | 10,500 ₹1,40,112 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.41 | cum | 12,772.18 ₹5,03,313.3 Lowest | 13,000 ₹5,12,291 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,304.72 | kilogram | 112.43 ₹3,71,550.23 Lowest | 115 ₹3,80,043.38 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 54.21 | sqm | 386.16 ₹20,933.73 Lowest | 390 ₹21,141.9 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 175.14 | sqm | 839.6 ₹1,47,047.54 Lowest | 840 ₹1,47,117.6 |
| 1.01 | 50.18.8.9.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC Solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 110 mm pipe 4 kgf/cm2 | 17.6 | metre | 753.62 ₹13,263.71 Lowest | 780 ₹13,728 |
Tender Value
₹12.3 L
EMD Value
₹30,713
Closing Date
20 Oct 2025, 10:00 amClosed
GOUTHAMI R
office of the assistant engineer Ranni angadi gramapanchayth
GENERAL RAGP/225/25-26 Providing Basic Facilities For Construction of New Panchayat Office Building
2025_LSGD_807979_1
04/2025/AE/LID EW/ RAG-IV phase
Open Tender
Civil Works - Buildings
Item Rate
180 days
ranni angadi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹30,713
Yes
5 Jan 2026
13 Oct 2025
21 Oct 2025
13 Oct 2025
20 Oct 2025
13 Oct 2025
Amount
SIDE PROTECTION WALL
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
50.18.8.9.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC Solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 110 mm pipe 4 kgf/cm2
SHYJU T JOHN (BID ID -2398011)
Bidder Name
roshan engineering works
SHYJU T JOHN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347062.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
225sbd.pdf
Tender Documents • 1.94 MB
BOQ_1347062.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .