| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAdmitted-Finance | ₹34.9 L | L1 | Admitted-Finance |
| 2 | L2₹35.8 LAdmitted-Finance | ₹35.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VGM CONSTRUCTIONS L2 | VG CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Providing CC Road at North Street in Solamadevi Panchayat.Earth work Excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation. | 52.32 | cum | 269.31 ₹14,090.30 | 263 ₹13,760.16 |
| 2.00 | Collection and supply of M.sand and filling in to the basement including cost and all labour charge site and all labour charges as per standard specifications | 65.4 | cum | 2,109.44 ₹1.4 L | 2,060 ₹1.3 L |
| 3.00 | Cement concerete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labours charges etc., complete. | 78.48 | cum | 6,011.9 ₹4.7 L | 5,871 ₹4.6 L |
| 4.00 | Centering & shuttering including cost and conveyance of all materials to site and all labour charges etc | 501.4 | sqm | 560.13 ₹2.8 L | 547 ₹2.7 L |
| 5.00 | cement concrete1:2:4 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum | 62.68 | cum | 7,344.13 ₹4.6 L | 7,172 ₹4.5 L |
| 6.00 | cement concrete1:1.5:3 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum | 49.05 | cum | 7,902.21 ₹3.9 L | 7,717 ₹3.8 L |
| 7.00 | Extra for laying and finishing the concrete pavement with surface vibrators, side centering with MS channel, dewatering equipments, mechanical trowel finisher to have smooth finish as per the directions of the department officer - Rate per 1 M2 | 654 | sqm | 70.66 ₹46,211.64 | 69 ₹45,126 |
| 8.00 | Providing CC Road at Mariyammankovil in Solamadevi Panchayat.Earth work Excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation. | 26.28 | cum | 269.31 ₹7,077.47 | 263 ₹6,911.64 |
| 9.00 | Collection and supply of M.sand and filling in to the basement including cost and all labour charge site and all labour charges as per standard specifications | 32.85 | cum | 2,108.42 ₹69,261.60 | 2,059 ₹67,638.15 |
| 10.00 | Cement concerete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labours charges etc., complete. | 39.42 | cum | 6,010.88 ₹2.4 L | 5,870 ₹2.3 L |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
27 Feb 2026, 3:00 pmClosed
BDO VP
BDO Thiruverumbur
Providing CC Road 3 numberin Solamadevi in Panchayat
2026_RDTN_665616_1
B2/0591/2026
Open Tender
Civil Works
180 days
BDO Thiruverumbur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,000
Yes
5 Mar 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
Providing CC Road at North Street in Solamadevi Panchayat.Earth work Excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of M.sand and filling in to the basement including cost and all labour charge site and all labour charges as per standard specifications
Cement concerete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labours charges etc., complete.
Centering & shuttering including cost and conveyance of all materials to site and all labour charges etc
cement concrete1:2:4 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
cement concrete1:1.5:3 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
Extra for laying and finishing the concrete pavement with surface vibrators, side centering with MS channel, dewatering equipments, mechanical trowel finisher to have smooth finish as per the directions of the department officer - Rate per 1 M2
Providing CC Road at Mariyammankovil in Solamadevi Panchayat.Earth work Excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of M.sand and filling in to the basement including cost and all labour charge site and all labour charges as per standard specifications
Cement concerete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labours charges etc., complete.
Centering & shuttering including cost and conveyance of all materials to site and all labour charges etc
cement concrete1:2:4 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
cement concrete1:1.5:3 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
Extra for laying and finishing the concrete pavement with surface vibrators, side centering with MS channel, dewatering equipments, mechanical trowel finisher to have smooth finish as per the directions of the department officer - Rate per 1 M2
Earth work Excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Centering & shuttering including cost and conveyance of all materials to site and all labour charges etc
cement concrete1:2:4 mix using20 mm ISS HBG metal cost and conveyance of all materials to site and all labour charges etc
cement concrete1:1.5:3 mix using20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
Extra for laying and finishing the concrete pavement with surface vibrators, side centering with MS channel, dewatering equipments, mechanical trowel finisher to have smooth finish as per the directions of the department officer - Rate per 1 M2
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_799457.pdf
techsummary_799457.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
pricebidSola.pdf
Tender Documents • 0.29 MB
BOQ_799457.xls
BOQ • 0.37 MB
techbidSola.pdf
Additional Documents • 0.43 MB
Download all tender documents and submit your bid