Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹12,316
Closing Date
14 Sept 2026, 5:00 pm2d left
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Dismantle,Transportation and Installation of Pony belt driveheads from 380m inside D19 BG,10th DR Jn to 9th DR Jn. Of D20 TG, in XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area
2026_BCCL_364955_1
BCCL/WJA/MND/SUR/2026-27/22
Open Tender
Miscellaneous Works
Percentage
40 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹12,316
4 Sept 2026
4 Sept 2026
16 Sept 2026
4 Sept 2026
14 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantle,Transportation & Installation of Pony belt driveheads from 380m inside D-19 B/G,10th D/R Jn to 9th D/R Jn. Of D-20 T/G, in XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area | |||||
| 1.01 | Dismantalling of Pony drive head at D-19 B/G face at chainage 525m Analysis: Manshift required = 8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 2 | shifts | 11,500.8 | ₹23,001.6 |
| 1.02 | Manual Transportation of jib drum,gear box,motor of pony drivehead from 380m inside D-19 B/G,10 th D/R Jn.to 9th Jn.of D-20 T/G . i.e.Total distance=770m Analysis: Manshift required for manual transportation of one item/60m =10 unskilled manshift/shift Cost/mt/item= 10*1437.60/60 =Rs.239.6/mt/item Total items=3 no.;Therefore cost/mt=(Rs 239.6 *3)=Rs 718.8/mt | 770 | meter | 718.8 | ₹5,53,476 |
| 1.03 | Manual Transportation of jib drum,gear box,motor of pony drivehead from 380m inside D-19 B/G,10 th D/R Jn.to 9th Jn.of D-20 T/G. i.e.(Total Distance=770.0m) Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 7 | shifts | 11,500.8 | ₹80,505.6 |
| 1.04 | Manual Transportation of jib drum,gear box,motor of pony drivehead from 380m inside D-19 B/G,10 th D/R Jn.to 9th Jn.of D-20 T/G. i.e.(Total Distance=770.0m) Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1437.6 =Rs11500.8/shift | 4 | shifts | 11,500.8 | ₹46,003.2 |
| 1.05 | Installation of Pony Drivehead at D-20 B/G,10th D/R jn. Analysis: Unskilled manshift required/shift=8 cost/shift= 8*1437.6 =Rs11500.8/shift | 4 | shift | 11,500.8 | ₹46,003.2 |
| 1.06 | Replacement of 2.5 Km old cables by Transportation from surface,Laying & Hanging of 2.5 km of new Telephone Cables and Withdrawl,Tranportation upto surface of old cables . Analysis: UnSkilled Manshift required for 400m cable = 6unskilled, cost/m=(Rs.1437.60X6)/400=Rs21.56 | 5,000 | Meter | 21.56 | ₹1,07,800 |
| 1.07 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR | 1 | Units | 1,28,518.44 | ₹1,28,518.44 |
| 2CMPF | |||||
| 2.01 | CMPF, Pension and admin. Charge of Employee Un Skilled surface | 596 | hd | 275.26 | ₹1,64,054.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_377872.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .