Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.9 L+₹18,505.71 (4.96%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | K S SWAROOP KRISHNAN L1 | RAJESH.P.L L2 |
|---|---|---|---|---|---|
| 1.00RC works | |||||
| 1.00 | OD112802/2026-2027:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | 158 | each | 424.64 ₹67,093.12 Lowest | 445 ₹70,310 |
| 1.00 | OD112803/2026-2027:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | 65 | each | 760.1 ₹49,406.5 Lowest | 795 ₹51,675 |
| 1.00 | OD112804/2026-2027:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | 35 | each | 1,033.47 ₹36,171.45 Lowest | 1,080 ₹37,800 |
| 1.00 | OD112805/2026-2027:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | 25 | each | 1,398.52 ₹34,963 Lowest | 1,465 ₹36,625 |
| 1.00 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | 2 | each | 25,661.33 ₹51,322.66 Lowest | 26,827 ₹53,654 |
| 1.01 | OD25553/2026-2027:clearing the blocked up sweage line using sewage cleaning road and put up the same working in order etc. complete as per the direction of site engineer in charge | 490 | metre | 127.69 ₹62,568.1 Lowest | 133 ₹65,170 |
| 1.01 | OD25554/2026-2027:Cleaning the blocked up and not working sewer manhole of size 60x60cm having height up to 150cm or nearest including disposal of black earth | 51 | each | 608.43 ₹31,029.93 Lowest | 636 ₹32,436 |
| 1.01 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | 4,000 | Litre | 0.57 ₹2,280 Lowest | 1 ₹4,000 |
| 1.01 | 50.9.14.1:Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. | 0.09 | cum | 1,17,498.35 ₹11,044.84 Lowest | 1,22,839 ₹11,546.87 |
Tender Value
₹3.4 L
EMD Value
₹8,474
Closing Date
14 Aug 2026, 11:00 amClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram.
GENERAL-GMHC and SAP- Routine Maintenance Contract works-Running Contract works -MHC and SAP- First Phase for the year 2026-27-General Civil Work
2026_PWD_864731_1
PWD/BLDG/TR/7612/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
Yes
₹8,474
Yes
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RC works | |||||
| 1.001 | OD112802/2026-2027:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | - | each | - | - |
| 1.002 | OD112803/2026-2027:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | - | each | - | - |
| 1.003 | OD112804/2026-2027:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | - | each | - | - |
| 1.004 | OD112805/2026-2027:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (Minimum length of wooden log 120 cm) | - | each | - | - |
| 1.005 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | - | each | - | - |
| 1.006 | OD25553/2026-2027:clearing the blocked up sweage line using sewage cleaning road and put up the same working in order etc. complete as per the direction of site engineer in charge | - | metre | - | - |
| 1.007 | OD25554/2026-2027:Cleaning the blocked up and not working sewer manhole of size 60x60cm having height up to 150cm or nearest including disposal of black earth | - | each | - | - |
| 1.008 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | - | Litre | - | - |
| 1.009 | 50.9.14.1:Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. | 1 | cum | - | - |
stage.html
html • 0.02 MB
finance_1463105.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1463105.xls
BOQ • 0.31 MB
epayment.pdf
Tender Documents • 0.05 MB
SBD.pdf
Tender Documents • 1.64 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
declaration.pdf
Tender Documents • 0.00 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .