| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | L1 | Admitted-Finance | |
| 2 | L2₹5.2 L+₹9,686.70 (1.89%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹5.8 L+₹62,885.15 (12.2%)Admitted-Finance GOVT CONTRACTOR VILL GAHAR P O PANJGAIN TEHSIL SADAR DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Daljeet Singh L1 | Shivansh Sharma L2 | Gaurav Thakur L3 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge Soft rock | 22.08 | cum. | 250 ₹5,520 | 250 ₹5,520 | 200 ₹4,416 Lowest |
| 2.01 | Extra rates for quantities of works, executed in or under water and/or liquid mud, including pumping out water as required. 20% upto….. | 8.96 | cum. | 650 ₹5,824 | 200 ₹1,792 Lowest | 300 ₹2,688 |
| 3.01 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8graded stone aggregate 40mm nominal size) and curing etc. complete. In foundation & Plinth. | 5.04 | Cum. | 4,600 ₹23,184 | 4,800 ₹24,192 | 4,200 ₹21,168 Lowest |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of same form work for wall, R/wall returns/wall of any fillets steps etc. | 144.29 | Sqm. | 280 ₹40,401.2 | 150 ₹21,643.5 Lowest | 185 ₹26,693.65 |
| 5.01 | Providing and laying cement concrete 1:3:6 ( 1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) and curing complete.upto plinth level | 9.9 | cum. | 4,800 ₹47,520 Lowest | 5,500 ₹54,450 | 6,200 ₹61,380 |
| 6.01 | above plinth level | 21.13 | cum. | 4,800 ₹1,01,424 Lowest | 5,500 ₹1,16,215 | 5,500 ₹1,16,215 |
| 7.01 | Providing and laying cement concrete 1:1.5:3 (1 cement 1.5 sand : 3 graded stone aggregate 20 mm nominal size) walls (any thickness) including attached pilastes, columns, piers, abutments, pollars, posts, struts, buttresses, string or lacing courses, parapets, copinged blocks, anchor blcks, plain window sills, fillets, sunken floor etc.m up to floor five level, excluding the cost of centerting , shuttering and finishing | 12.11 | cum. | 5,800 ₹70,238 Lowest | 7,100 ₹85,981 | 7,500 ₹90,825 |
| 8.01 | Providing mild/ for steel reinforcurment tor reinforced cement concrete work i/c bending, binding and placing in position complete i/c the cost of binding wire etc. | 1,089.9 | kgs | 75 ₹81,742.5 Lowest | 75 ₹81,742.5 Lowest | 78 ₹85,012.2 |
| 9.01 | Smooth finishing of the exposed surface of RCC work with 6 mm thick cement mortar 1:3 (1cement:3 fine sand) | 93.68 | Sqm. | 280 ₹26,230.4 | 200 ₹18,736 | 85 ₹7,962.8 Lowest |
| 10.01 | White washing with lime to give an even shade | 93.68 | Sqm. | 10 ₹936.8 | 20 ₹1,873.6 | 5 ₹468.4 Lowest |
Tender Value
₹9.7 L
EMD Value
₹15,000
Closing Date
11 Sept 2025, 5:00 pmClosed
DISTT. PROJECT OFFICER, IDP, BILASPUR
DISTT. PROJECT OFFICER, IDP, BILASPUR
PR-131/2025-26 Construction of Sub Surface Dykes( Makowal ) at place Lag nalla vill Lag in GP Kalol under APO Berthin
2025_CPD1_113519_1
506159-CW-RFQ
Open Tender
Civil Works
Item Wise
45 days
DISTT. PROJECT OFFICER, IDP
Total Monetaryvalue and list of works of last three years, financial statement, Certificate of movable and fixed assets valuation, Copy of PAN, Bank Account Copy of GST,GST Clearance Copy of SignedscannedLetterofQuotationforTechnical andfinancial par
7 documents required · 7 mandatory
₹500
DISTT. PROJECT OFFICER, IDP, BILASPUR
₹15,000
12 Sept 2025
1 Sept 2025
12 Sept 2025
1 Sept 2025
11 Sept 2025
1 Sept 2025
1 Sept 2025 - 11 Sept 2025
Amount
Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge Soft rock
Extra rates for quantities of works, executed in or under water and/or liquid mud, including pumping out water as required. 20% upto…..
Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8graded stone aggregate 40mm nominal size) and curing etc. complete. In foundation & Plinth.
Centering and shuttering including strutting, propping etc. and removal of same form work for wall, R/wall returns/wall of any fillets steps etc.
Providing and laying cement concrete 1:3:6 ( 1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) and curing complete.upto plinth level
above plinth level
Providing and laying cement concrete 1:1.5:3 (1 cement 1.5 sand : 3 graded stone aggregate 20 mm nominal size) walls (any thickness) including attached pilastes, columns, piers, abutments, pollars, posts, struts, buttresses, string or lacing courses, parapets, copinged blocks, anchor blcks, plain window sills, fillets, sunken floor etc.m up to floor five level, excluding the cost of centerting , shuttering and finishing
Providing mild/ for steel reinforcurment tor reinforced cement concrete work i/c bending, binding and placing in position complete i/c the cost of binding wire etc.
Smooth finishing of the exposed surface of RCC work with 6 mm thick cement mortar 1:3 (1cement:3 fine sand)
White washing with lime to give an even shade
Supplying and stacking at site 63 mm to 45 mm size stone aggregate & 53 mm to 22.4 mm size stone aggregate
Providing and fixing of GI Pipe 25 mm dia
Providing and fixing GM gate valve 25mm size
50 mm size
Providing and fixing HDPE pipe 40 mm & for weep holes
Providing and fixing plastic net/jali
Providing and fixing HDPE pipe32mm
Providing and writting.name plate
Shivansh Sharma (BID ID -554659)
Gaurav Thakur (BID ID -554631)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .