Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC RIYAS MANZIL VELICHIKALA PO KOLLAM | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L3 | |
| 3 | Rejected-Technical HIMAHIRANS POCHAKONAM EZHUKONE PO KOLLAM | - | Rejected-Technical L2 | |
| 4 | Rejected-Technical | - | Rejected-Technical L4 |
Tender Value
₹7.7 L
EMD Value
₹11,600
Closing Date
30 Sept 2021, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
KIPLB SUBDIVISION 19 KOTTIYAM
SDRF KIP LB Sub Division no 19 Kottiyam Rectification works in the Adichanalloor distributary in between CH 10000 to 10350m
2021_Irrig_441001_1
12/AEE/KIP/LB/SDN19/2021-22
Open Tender
Civil Works - Canal
Item Rate
180 days
Near Vishnu service station
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,850
₹11,600
1 Jan 2022
22 Sept 2021
6 Oct 2021
22 Sept 2021
30 Sept 2021
22 Sept 2021
Amount
scheme 1 - rectification work in between ch 10000 to 10080
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od4183/2021_2022/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compaction,curing, watering etc complete with all leads and lift as per specification as directed by the engineer in charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
scheme 2 - rectification work in between ch 10080 to 10142
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od4183/2021_2022/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compaction,curing, watering etc complete with all leads and lift as per specification as directed by the engineer in charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
scheme 3 - rectification work in between ch 10142 to 10204
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od4183/2021_2022/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compaction,curing, watering etc complete with all leads and lift as per specification as directed by the engineer in charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
scheme 4 - rectification work in between ch 10204 to 10266
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od4183/2021_2022/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compaction,curing, watering etc complete with all leads and lift as per specification as directed by the engineer in charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
scheme 5 - rectification work in between ch 10266 to 10328
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od4183/2021_2022/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compaction,curing, watering etc complete with all leads and lift as per specification as directed by the engineer in charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
scheme 6 - rectification work in between ch 10328 to 10350
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od4183/2021_2022/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compaction,curing, watering etc complete with all leads and lift as per specification as directed by the engineer in charge
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Hiran mohan
H ANZAR
T M BUILDERS
Bidder Name
RIYAS H
H ANZAR
T M BUILDERS
Hiran mohan
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_627344.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .