Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹681.87 (0.44%)Admitted-Finance | ₹1.5 L+₹681.87 (0.44%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹7,040.85 (4.57%)Admitted-Finance | ₹1.6 L+₹7,040.85 (4.57%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GHANSHYAM RANA L2 | DALEEP KUMAR L1 | BIRBAL RAM WALIA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work, jumper work, saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15 Cm. layers when required into plinths, side of foundations etc including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil as directed with in all leads and lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 9.69 | Cum | 490 ₹4,748.1 | 440 ₹4,263.6 Lowest | 475 ₹4,602.75 |
| 2.00 | Providing & laying cement concrete 1:4:8 (1 cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in: foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1.44 | Cum | 13,500 ₹19,440 | 9,000 ₹12,960 Lowest | 10,000 ₹14,400 |
| 3.00Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | ||||||
| 3.01 | Foundation & Plinth complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1.44 | Cum | 13,500 ₹19,440 Lowest | 13,500 ₹19,440 Lowest | 15,500 ₹22,320 |
| 3.02 | Walls (any thickness but not less than 0.10 m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.76 | Cum | 15,800 ₹43,608 | 14,500 ₹40,020 Lowest | 15,500 ₹42,780 |
| 4.00Providing and laying Reinforced cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | ||||||
| 4.01 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilever upto floor two level complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.36 | Cum | 14,800 ₹5,328 | 11,500 ₹4,140 Lowest | 16,000 ₹5,760 |
| 5.00Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm, so as to give a fair finish including centring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in:- | ||||||
| 5.01 | Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters, buttress, plinth and string courses and the like with in all leads and lifts as per the direction of Engineer-in-Charge. | 42 | Sqm | 300 ₹12,600 Lowest | 390 ₹16,380 | 440 ₹18,480 |
| 5.02 | Flat surfaces such as soffits of suspended floor, roofs, landing and the like etc. upto 200mm thickness complete in all respects with in all leads and lifts as per the directions and best satisfaction of the Engineer-in-Charge. | 1.62 | Sqm | 680 ₹1,101.6 | 390 ₹631.8 Lowest | 550 ₹891 |
Tender Value
₹1.8 L
EMD Value
₹3,700
Closing Date
9 Sept 2026, 5:00 pmClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_142106_1
EE-JSD-BGI-TA-Tender/2026- 15166-215 dt. 26/8/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NiT
6 documents required · 6 mandatory
₹350
₹3,700
15 Sept 2026
28 Aug 2026
10 Sept 2026
28 Aug 2026
9 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work, jumper work, saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15 Cm. layers when required into plinths, side of foundations etc including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil as directed with in all leads and lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 9.69 | Cum | - | - |
| 2 | Providing & laying cement concrete 1:4:8 (1 cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in: foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1.44 | Cum | - | - |
| 3Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | |||||
| 3.01 | Foundation & Plinth complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1.44 | Cum | - | - |
| 3.02 | Walls (any thickness but not less than 0.10 m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.76 | Cum | - | - |
| 4Providing and laying Reinforced cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | |||||
| 4.01 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilever upto floor two level complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.36 | Cum | - | - |
| 5Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm, so as to give a fair finish including centring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in:- | |||||
| 5.01 | Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters, buttress, plinth and string courses and the like with in all leads and lifts as per the direction of Engineer-in-Charge. | 42 | Sqm | - | - |
| 5.02 | Flat surfaces such as soffits of suspended floor, roofs, landing and the like etc. upto 200mm thickness complete in all respects with in all leads and lifts as per the directions and best satisfaction of the Engineer-in-Charge. | 1.62 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
FORM6_5.pdf
Tender Documents • 0.60 MB
TC.pdf
Tender Documents • 0.15 MB
BOQ_210983.xls
BOQ • 2.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .