Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical GROUND FLOOR ANSHUL BHATTI SAINJ SAINJ KULLU HIMACHAL PRADESH 175134 | KULLU | HIMACHAL PRADESH | 175134 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NIGALPANI DHARCHULA | DHARCHULA | PITHORAGARH | UTTARAKHAND | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical NOT FOUND | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
28 Mar 2025, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Group Senior Manager, PnC
PnC Division,Parbati Complex,Parbati-II H.E.Project, Nagwain, Distt.-Mandi, H.P.-175121
Construction of Pothead Yard-420 KV Bus Reactor at Power House Site of Parbati-H.E. Project (Stage-II) (Package No-C-807)
2025_NHPC_852007_1
NH/PP-II/PnC/Pkg. No. C-807/2025
Open Tender
Civil Works
Works
180 days
Power House of Parbati-II H.E.P., Sainj, H.P.
Please refer tender document
7 documents required · 7 mandatory
₹1,770
NHPC Ltd.
₹9.8 L
Yes
8 Aug 2025
7 Mar 2025
4 Apr 2025
7 Mar 2025
28 Mar 2025
7 Mar 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.. | 88.36 | Cum | 1,636.17 | ₹1,44,571.98 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock | 9,696.39 | Cum | 262.45 | ₹25,44,817.56 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 40 mm nominal size). | 0.6 | Cum | 6,862.85 | ₹4,110.85 |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).All works upto plinth level.. | 0.8 | Cum | 8,081.38 | ₹6,465.1 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing,carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level : Concrete of M20 grade with minimum cement content of 270 kg /cum. | 752.4 | Cum | 9,537.12 | ₹71,75,729.09 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases for columns. | 3,235.44 | Sqm | 241.68 | ₹7,81,941.14 |
| 7 | Supplying and stacking at site. 53 mm to 22.4 mm size stone aggregate. | 233.95 | Cum | 2,140.93 | ₹5,00,870.57 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 4,207.77 | Cum | 307.73 | ₹12,94,857.06 |
| 9 | Providing and Fixing PVC pipe of 100mm dia in Weep Holes @ 1.0m c/c both ways. | 214.5 | Mtr. | 247.68 | ₹53,127.36 |
| 10 | Providing and Fixing PVC pipe of 150mm dia. | 20 | Mtr. | 334.97 | ₹6,699.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.PDF
pdf • 0.46 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_896051.xls
BOQ • 0.30 MB
EtenderC807.pdf
Tender Documents • 4.49 MB
Tenderdocument.pdf
Tender Documents • 4.49 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .