Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹1 L
Closing Date
7 Aug 2026, 6:00 pm6d left
Superintending Engineer
O/o Superintending Engineer, Public Works Department (PWD), Buildings South Circle, Thiruvananthapuram
General - Budget 2022-23 - Construction of New Building for Family Health Centre, Neduvathoor - Composite Work
2026_PWD_863267_1
PWD/BLDG/TR/6584/2022_23_2_1/1
Open Tender
Civil Works - Buildings
Percentage
450 days
Kollam
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
₹1 L
Yes
30 Jul 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX A : Building Proper(Civil work) | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | 9.27 | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.8 | cum | 257.63 | ₹205.85 |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1 | cum | 131.02 | ₹130.89 |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 7,932.89 | - |
| 1.005 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 8,364.57 | ₹8,356.21 |
| 1.006 | OD18429/2026-2027:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Excess/less cost of cement as per mix design is not payable or not recoverable.
All work upto plinth level Concrete of M30 grade with minimum cement content of 340 kg /cum. (Data created from DSR Item no. 5.33.1.1) | - | cum | 10,978.33 | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | 112.43 | - |
| 1.008 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 0.8 | cum | 318.47 | ₹254.46 |
| 1.009 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | - | cum | 729.39 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
biddwg.pdf
Tender Documents • 3.30 MB
epayment.pdf
Other Document • 0.05 MB
integritypact.pdf
Other Document • 0.01 MB
BOQ_1460219.xls
BOQ • 0.47 MB
formoftender.pdf
Additional Documents • 0.26 MB
preliminaryagreement.pdf
Additional Documents • 0.21 MB
affidavit.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].