Tender Value
₹21.8 L
EMD Value
₹43,560
Closing Date
17 Jul 2026, 6:00 pm
Executive Engineer REW Samba
Office of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_314673_5
16 REW Samba of 2026-27, Date 04.07.2026
Open Tender
Civil Works
30 days
Nud
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹43,560
4 Jul 2026
4 Jul 2026
18 Jul 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed within a lead of 50 m. | 31.44 | cum | 479.3 | ₹15,069.19 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 12.7 | cum | 4,826.5 | ₹61,296.55 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 16.99 | cum | 5,733.6 | ₹97,413.86 |
| 4 | filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 25.15 | cum | 218.4 | ₹5,492.76 |
| 5 | Providing and laying in position specified grade of reinforced cementconcrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level ::1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate | 10.18 | cum | 7,788.4 | ₹79,285.91 |
| 6 | Reinforced cement concrete work in columns ,attached pillarspillets, shear walls up to floorfive level, excluding the cost of centering, shuttering, finishing andreinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stoneaggregate 20 mm nominal size). | 2.05 | cum | 9,395.7 | ₹19,261.19 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases up to floor with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stoneaggregate 20 mm nominal size). | 19.2 | cum | 9,821.85 | ₹1,88,579.52 |
| 8 | centering & Shuttering incl. propping and removal of same in columns, pillars, piers abutments,posts | 32.46 | sqm | 628.95 | ₹20,415.72 |
| 9 | sides and soffits of lintel and beams | 40 | sqm | 577.55 | ₹23,102 |
| 10 | Foundation and footings bases of columns, | 60 | sqm | 286.35 | ₹17,181 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_1019015.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid