| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.7 L+₹3,937.60 (0.21%)Rejected-Finance VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.7 L+₹5,565 (0.30%)Rejected-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 172111 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S Anil Kumar L1 | Sarwan Singh L3 | AKKA RAM L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and Laying, spreading and compacting stone aggregate of specified sizes 63 to 45 mm (sixty three milimetre to forty five milimetre) WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .Grading -II as per technical specification Clause 405 .The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 244.13 | Per Cubic Metre. | 2,430 ₹5,93,235.9 Lowest | 2,430 ₹5,93,235.9 Lowest | 2,450 ₹5,98,118.5 |
| 2.00 | Providing and applying tack coat with bitumen emulsion (RS-1) on prepared surface of granular base including cleaning of road surface and spraying emulsion at the rate of 0.70-1.00 kg ( Zero point seventy - One Kilogram) per square metre using mechanical means as per MORD 2014 Technical Specification 2014 Clause 502 including carriage of materials within all leads and lifts and other incidentals as per direction of Engineer-in-charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 3,202.5 | Per square metre | 18 ₹57,645 Lowest | 19 ₹60,847.5 | 18 ₹57,645 Lowest |
| 3.00 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 30 mm (Thirty milimetre) compacted thickness with bitumen of grade VG-30 @ 5.5% (five point five percent by weight of total mix) and lime filler @ 3% (Three percent by weight of aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 94.5 | Per cubic metre | 12,850 ₹12,14,325 | 12,875 ₹12,16,687.5 | 12,840 ₹12,13,380 Lowest |
Tender Value
₹17.8 L
EMD Value
₹34,500
Closing Date
7 Feb 2024, 10:30 amClosed
Executive Engineer
HP.PWD Ghumarwin Division
M/T on link road from Chhanjiyara to Berthin via chat km. 0/00 to 2/510 (SH P/L wearing and tarring in km. 0/500 to 1/500)(SCSP)
2024_PWD_84749_1
12377-82 dated 24/01/2024 job2
Open Tender
Civil Works - Roads
Item Rate
90 days
Ghumarwin
please refer tender documents
8 documents required · 8 mandatory
₹500
₹34,500
HP.PWD Ghumarwin Division
10 Jul 2026
31 Jan 2024
7 Feb 2024
31 Jan 2024
7 Feb 2024
31 Jan 2024
6 Feb 2024
Amount
Providing and Laying, spreading and compacting stone aggregate of specified sizes 63 to 45 mm (sixty three milimetre to forty five milimetre) WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .Grading -II as per technical specification Clause 405 .The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying tack coat with bitumen emulsion (RS-1) on prepared surface of granular base including cleaning of road surface and spraying emulsion at the rate of 0.70-1.00 kg ( Zero point seventy - One Kilogram) per square metre using mechanical means as per MORD 2014 Technical Specification 2014 Clause 502 including carriage of materials within all leads and lifts and other incidentals as per direction of Engineer-in-charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 30 mm (Thirty milimetre) compacted thickness with bitumen of grade VG-30 @ 5.5% (five point five percent by weight of total mix) and lime filler @ 3% (Three percent by weight of aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
AKKA RAM
Sarwan Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .