| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAdmitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹6.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 Cr+₹85.2 L (13.8%)Admitted-Finance 11 B EAST VEERAPANDIYAN STREET VIRUDHACHALAM 606001 | VIRUDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | ₹7.0 Cr+₹85.2 L (13.8%) | L2 | Admitted-Finance |
| 3 | L3₹7.1 Cr+₹93.2 L (15.1%)Admitted-Finance D NO 271D3 5 ANDAL NAGAR K R NAGAR NALATINPUTHUR KOVILPATTI TK 628 716 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628716 | ₹7.1 Cr+₹93.2 L (15.1%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 Cr+₹1.0 Cr (16.8%)Admitted-Finance | ₹7.2 Cr+₹1.0 Cr (16.8%) | L4 | Admitted-Finance |
| 5 | L5₹7.6 Cr+₹1.5 Cr (23.5%)Admitted-Finance | ₹7.6 Cr+₹1.5 Cr (23.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GUHANSANJEEVI ENTERPRISES L9 | Samsudeen L2 | H.Venkateswaran L4 | AYYAPPAN AND CO L6 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L1 | S CHELLADURAI CONTRACTOR L3 | HARISH CONSTRUCTION L5 | JD ENTERPRISES L8 | C.GOVINDAN L10 | SS BUILDERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Schedule I (Civil and erection works) | 1 | No | 1,07,28,116 ₹1,07,28,116 | 94,58,023 ₹94,58,023 | 94,01,920 ₹94,01,920 | 1,02,08,770 ₹1,02,08,770 | 1,09,77,000 ₹1,09,77,000 | 95,89,271 ₹95,89,271 | 86,09,558 ₹86,09,558 Lowest | 96,91,079 ₹96,91,079 | 1,52,28,430 ₹1,52,28,430 | 1,05,81,550 ₹1,05,81,550 |
| 2.00 | Schedule II (Supply of Materilas) | 1 | No | 2,74,82,400 ₹2,74,82,400 | 2,27,99,371 ₹2,27,99,371 | 2,37,14,400 ₹2,37,14,400 | 2,52,14,705 ₹2,52,14,705 | 1,73,73,100 ₹1,73,73,100 Lowest | 2,30,38,130 ₹2,30,38,130 | 2,63,94,950 ₹2,63,94,950 | 2,78,62,600 ₹2,78,62,600 | 2,96,90,600 ₹2,96,90,600 | 2,63,23,900 ₹2,63,23,900 |
| 3.00 | Applicable GST Amount (Total GST Amount @18%) | 1 | No | 68,77,892.88 ₹68,77,892.88 | 58,06,330.92 ₹58,06,330.92 | 59,60,937.6 ₹59,60,937.6 | 63,76,225.5 ₹63,76,225.5 | 51,03,018 ₹51,03,018 Lowest | 58,72,932.18 ₹58,72,932.18 | 63,00,811.44 ₹63,00,811.44 | 67,59,662.22 ₹67,59,662.22 | 80,85,425.4 ₹80,85,425.4 | 66,42,981 ₹66,42,981 |
| 4.00 | Schedule III (Cost towards Retrieved materials) | 1 | No | -1,68,000 ₹-1,68,000 | -27,720 ₹-27,720 | -70,000 ₹-70,000 | -84,000 ₹-84,000 | -42,000 ₹-42,000 | -70,000 ₹-70,000 | -89,600 ₹-89,600 | -70,000 ₹-70,000 | -70,000 ₹-70,000 | -70,000 ₹-70,000 |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
29 Oct 2024, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Making LILO of the existing 110 KV Pugalur - Renganathapuram 110 KV at Pavithram 110 KV SSin Karur EDC.
2024_EB_493333_1
CE/TP-II/TRY/C-05/24-25
Open Tender
Civil Works
Works
180 days
PAVITHRAM
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹3.6 L
Yes
3 Mar 2025
14 Oct 2024
30 Oct 2024
14 Oct 2024
29 Oct 2024
14 Oct 2024
Amount
Schedule I (Civil and erection works)
Schedule II (Supply of Materilas)
Applicable GST Amount (Total GST Amount @18%)
Schedule III (Cost towards Retrieved materials)
Description of Work / Item(s)
Amount
Civil and Erection works
Clearing juliflora jungle with uprooting including cost of clearing away the site with all labour, lead, lift , T&P etc complete.
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation .
Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil .
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in MR and DMR not requiring blasting.
Earthwork excavation in MR and DMR requiring blasting.
Setting of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete.
KCR wet
HCR wet
GCR wet
PCC1:3:6 using 20mm metal for foundation for tower concrete with out form work including cost of all materials, lead, lift , etc complete .
PCC 1:2:4 using 20mm metal for foundation, Chimney tower concrete with steel frustum box and chimney box work including cost of all materials, lead, lift , etc complete .
RCC 1:1.5:3 grade using 20mm (machine crushed) metal for foundation using mixture machine with steel frustum box including cost of all materials, labour lead, litf, etc., complete. But excliding cost for steel reinforcement .
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Providing pipe type earthing for each tower location including extra excavation in foundation pits of towers for fixing 3m long 25mm dia GI "B" class earthpipe and GI wire 2.40m long with legs on both terminals for connecting the GI pipe with tower leg ,refilling with excavated earth mixed with solt and charcoal as per standard specification including all cost of 25 mm GI B class pipe as per IS fabrication of legs for connection arrangement materials,transport, all labours, leads, lifts etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges,labour, fuel, oil, transport etc complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Erection of GI tower/tower extension parts ,square cross arm , DP structures with bolt & nuts including sorting out of tower parts as per the specification and punching of bolt & nuts, final checking and all other incidental charges for erection,including cost of all T&P,labour, lead, lift etc complete. as per approved drawing , BOM and specification. The rectification of defects found by operation staff during handing over of line to be done at free of cost...
Labour charges for hoisting of 7 units of 90 KN single suspension ordinary Disc insulators with necessary hardware fittings for panther including all cost of labour,lead, lift, T & P etc complete.Insulator will be supplied by department.
Labour charges for hoisting of 8 units of 120 KN single Tension ordinary Disc insulators with necessary hardware fittings for panther including all cost of labour,lead, lift, T & P etc complete.Insulator will be supplied by department.
Labour charges for stringing of 6 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects .
Single Span with LC
Single Span without LC
Continuous span without LC
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares(ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete.
Single Span with LC
Single Span without LC
Continuous span without LC
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete.
Labour charges for fixing of number plates, danger board,phase plate , Anti climbing device including all cost of labour transport,lead, lift,etc complete.
Labour charges for fixing of name board including cost of labour transport,lead, lift,etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
Providing temporary guys wherever necessary including excavation, burying out of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials,lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Labour charges for removal of Large trees.
Labour charges for removal of Small trees.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Providing trussels for major and minor road crossing including cost of all materials, labour, lead lift etc. Complete.
Providing earthing arrangements for terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete.
Transport and fixing of PG clamp for panther with jumper provisions for loop arrangements as per the instructions of site engineer including all cost of labour,lead, lift, T & P etc complete if necessary.
Labour charges for releasing , lowering and restringing of existing 3 Nos panther conductor and devoluted to store including all cost of tools and plants, lead and lift etc., complete. (Under LC condition)
Labour charges for releasing , lowering and restringing of existing 1 No GI Earthwire and devoluted to storeincluding all cost of tools and plants, lead and lift etc., complete. (Under LC condition)
Releasing , lowering and rehoisting the existing 7 units of 90 KN insulators in suspension fittings complete including all labour, T & P etc., complete. (Under LC condition)
Releasing, lowering and rehoisting the existing 8 units of 120 KN insulators in tension fittings completeincluding all labour, T & P etc., complete. (Under LC condition)
Description of Work / Item(s)
Amount
Supply of Materials
Supply of GI tower/extension parts/DP structures/X arm including stub & cleat in accordance with boards design as per approved drawing and BOM as detailed in this specification including cost of all materials ,labour, transport,lead, lift etc complete .MS Tower parts.
Supplying of hot dip Galvanising & bolt & nuts,stepbolt with various sizes of required length,Spring Washers as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
ACSR Panther conductor as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
GI Earth wire 7/3.55mm as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
90 KN Disc Insulator as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
120 KN Disc Insulator as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete suitable for panther conductor, as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
Single Suspension fitting for panther
Single Tension fitting for Panther
SB damber for panther
PA rod for Panther
MSJ for panther
D Shackle 16 mm dia
U Bolt 16 mm dia
Repair sleeve for panther
PG clamp for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete suitable for 7/3.55mm GI earth wire as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
Single Suspension fitting
Single Tension fitting
Supply of tower accessories as per standard Specification including cost of Transport charges and all lead,lift,etc, complete .
Number Plate
Phase plate ( Set of Three )
DANGER BOARD
Name board
Description of Work / Item(s)
Amount
Cost towards Retrieved materials
Dismantling and disposing of the existing towers by "As is where is condition".
Samsudeen (BID ID -1173441)
S CHELLADURAI CONTRACTOR (BID ID -1174942)
H.Venkateswaran (BID ID -1173449)
HARISH CONSTRUCTION (BID ID -1174998)
AYYAPPAN AND CO (BID ID -1173517)
SS BUILDERS (BID ID -1175612)
JD ENTERPRISES (BID ID -1175215)
GUHANSANJEEVI ENTERPRISES (BID ID -1172540)
C.GOVINDAN (BID ID -1175759)
H.Venkateswaran (BID ID -1173449)
Samsudeen (BID ID -1173441)
S CHELLADURAI CONTRACTOR (BID ID -1174942)
JD ENTERPRISES (BID ID -1175215)
AYYAPPAN AND CO (BID ID -1173517)
SS BUILDERS (BID ID -1175612)
GUHANSANJEEVI ENTERPRISES (BID ID -1172540)
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED (BID ID -1174838)
C.GOVINDAN (BID ID -1175759)
Samsudeen (BID ID -1173441)
S CHELLADURAI CONTRACTOR (BID ID -1174942)
H.Venkateswaran (BID ID -1173449)
AYYAPPAN AND CO (BID ID -1173517)
SS BUILDERS (BID ID -1175612)
HARISH CONSTRUCTION (BID ID -1174998)
GUHANSANJEEVI ENTERPRISES (BID ID -1172540)
JD ENTERPRISES (BID ID -1175215)
C.GOVINDAN (BID ID -1175759)
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED (BID ID -1174838)
C.GOVINDAN (BID ID -1175759)
H.Venkateswaran (BID ID -1173449)
S CHELLADURAI CONTRACTOR (BID ID -1174942)
JD ENTERPRISES (BID ID -1175215)
SS BUILDERS (BID ID -1175612)
AYYAPPAN AND CO (BID ID -1173517)
HARISH CONSTRUCTION (BID ID -1174998)
GUHANSANJEEVI ENTERPRISES (BID ID -1172540)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .