| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 Cr+₹3.2 L (0.73%)Rejected-AOC | ₹4.4 Cr+₹3.2 L (0.73%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.5 Cr+₹14.0 L (3.20%)Rejected-Finance | ₹4.5 Cr+₹14.0 L (3.20%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.5 Cr+₹16.4 L (3.76%)Rejected-Finance | ₹4.5 Cr+₹16.4 L (3.76%) | L4 | Rejected-Finance L4 |
| 5 | L5₹4.5 Cr+₹17.2 L (3.93%)Rejected-Finance | ₹4.5 Cr+₹17.2 L (3.93%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | JAIN AUGUSTINE L5 | NAZEER P MUHAMMED L2 | K I P CONSTRUCTION COMPANY L3 | RAJESH MATHEW AND COMPANY L1 | SAJEEV MATHEW AND COMPANY L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Resurfacing | ||||||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.5 | Hectare | 50,501 ₹25,250.5 | 50,501 ₹25,250.5 | 45,000 ₹22,500 | 15,000 ₹7,500 Lowest | 15,050 ₹7,525 |
| 1.00 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | 700 | sqm | 7 ₹4,900 | 6.6 ₹4,620 Lowest | 10 ₹7,000 | 50 ₹35,000 | 60 ₹42,000 |
| 1.00 | 4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method | 105 | cum | 3,850 ₹4,04,250 | 3,900 ₹4,09,500 | 3,500 ₹3,67,500 | 3,000 ₹3,15,000 Lowest | 3,100 ₹3,25,500 |
| 1.00 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 105 | cum | 3,850 ₹4,04,250 | 3,900 ₹4,09,500 | 3,750 ₹3,93,750 | 3,200 ₹3,36,000 Lowest | 3,250 ₹3,41,250 |
| 1.00 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | 700 | sqm | 63.15 ₹44,205 | 63 ₹44,100 | 70 ₹49,000 | 60 ₹42,000 Lowest | 65 ₹45,500 |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 66,895 | sqm | 20 ₹13,37,900 | 12 ₹8,02,740 Lowest | 20 ₹13,37,900 | 15 ₹10,03,425 | 20 ₹13,37,900 |
| 1.01 | 5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size) | 1,115 | cum | 11,200 ₹1,24,88,000 | 10,000 ₹1,11,50,000 Lowest | 10,000 ₹1,11,50,000 Lowest | 10,000 ₹1,11,50,000 Lowest | 10,100 ₹1,12,61,500 |
| 1.01 | 5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size) | 669 | cum | 14,300 ₹95,66,700 | 15,100 ₹1,01,01,900 | 15,000 ₹1,00,35,000 | 14,200 ₹94,99,800 Lowest | 14,300 ₹95,66,700 |
| 1.01 | 55.24:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 percent of mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause NO. 507 complete in all respects (using 7% shredded plastic) Grading - II (13.2 mm nominal size) | 891.8 | cum | 13,900 ₹1,23,96,020 Lowest | 15,000 ₹1,33,77,000 | 14,500 ₹1,29,31,100 | 14,000 ₹1,24,85,200 | 14,100 ₹1,25,74,380 |
Tender Value
₹4.2 Cr
EMD Value
₹1 L
Closing Date
14 Oct 2025, 4:00 pmClosed
Superintending Engineer
O/o Superintending Engineer PWD Roads Central Circle Aluva
Estimate for budget work is prepared for providing BC Overlay and includes provisions for BM patch BC Overlay Culvert Reconstruction drainage facilities and traffic safety furnitures
2025_PWD_803362_1
PWD/RB/TR/7219/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Thodupuzha Piravom Road
Please refer Tender documents.
10 documents required · 10 mandatory
₹9,759
Yes
₹1 L
Yes
10 Nov 2025
27 Sept 2025
17 Oct 2025
27 Sept 2025
14 Oct 2025
27 Sept 2025
27 Sept 2025 - 14 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .