Chief General Manager (Thermal)
Renovation of (A) Attached Toilets of Guest House Rooms in VIP Block at Tapi Guest House and (B) Wash Basin Area including Ladies and Gents Toilets at Narmada Guest House, SLPP Colony
355407
SLPP/Civil/Colony/ Toilet Renovation/2026.
Open
Civil Works
Fixed-rate
Surat
₹2,950
Gujarat Industries Power Company Limited.
₹22,300
16 Oct 2026
16 Oct 2026
16 Oct 2026
5 Nov 2026
16 Oct 2026
against item descriptions in SoR (Schedule of Rate) cum
BOQ (Section-E).
Contract period 04 months from the date of issue of LOI/WO, with a
mobilization period of 10 days and as per subsequent
clause no. 16 (Section-A) & 3 (Section-D).
EMD Rs. 22,300/- (Rupees Twenty-Two thousand Three
hundred only) by Demand Draft payable at Mosali-
Surat/Nani Naroli/Surat or irrevocable Bank Guarantee in favor of
GIPCL from approved Banks mentioned in this tender or
through RTGS/NEFT or through online payment gateway
of company’s website: www.gipcl.com (online Payment
Form) as per details mentioned herein under clause no.
07 of Instructions to Bidders.
Cost of tender document / tender Rs.2,950/- (Rupees Two Thousand Nine Hundred fifty
fee only) Non refundable, inclusive of applicable GST through
RTGS or through online payment gateway from website:
www.gipcl.com as per details mentioned herein under
clause no. 07 of Instructions to Bidders.
Site visit Site visit before submission of bid as per clause no.
(Section-A: Instructions to Bidders) at GIPCL (Surat
Lignite Power Plant) Colony, Village: Nani Naroli, Ta.
Mangrol, Dist. Surat.
Availability of online e-Tender On website: https://tender.nprocure.com or
document https://gipcltender.nprocure.com.
Last date of online submission of Through website: https://tender.nprocure.com or
offer https://gipcltender.nprocure.com up to 05.11.2026, 17:30
Submission of EMD either in On or before 05.11.2026, 17:30 hrs. during working days
physical form by way of DD/BG or at office of Surat Lignite Power Plant, Nani Naroli, Dist.
payment receipts of online EMD Surat, PIN: 394110 (Gujarat)
payment and online Tender fee Bidder can submit EMD through RTGS or through online
payment along with supporting payment gateway of company’s website:www.gipcl.com
documents for techno-commercial (online Payment form)
bid in physical form.
E-Reverse Auction E-Reverse Auction will be executed through website:
https://e-auction.nprocure.com (Schedule will be
intimated later on to eligible bidders).
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
1. Amendment / corrigendum of the tender document, forms, schedules, etc... may be
done any time by the GIPCL during the period of publication of tender in the website.
The Bidders are required to visit the website regularly till the last date & time of Bid
2. GIPCL reserves the right to reject any or all the tenders without assigning any reason
3. The Bidders are required to quote the rate strictly as per the terms and conditions
mentioned in the tender document, adhering to technical specifications as well.
4. The Bidders are required to submit their Bids online only through the website
https://tender.nprocure.com or https://gipcltender.nprocure.com. (E-Tender No.:
5. EMD either in physical form by way of DD/BG or copies of payment receipts of EMD
and Tender fee paid through RTGS/online along with other supporting documents
are to be submitted in physical form in sealed cover/envelop at the following address
on or before date & time mentioned above in NIT. At the top of envelop, tender notice
no should be mentioned.
6. Bidders are advised to upload the tender well in advance to avoid delay in submission
of tenders due to n-procure site related issues. In case of any issues /difficulties
cropping up during on line uploading / submission of documents, bidders are
requested to inform these well in advance (at least two days before closing of tender)
to (n) Code Solutions as mentioned in Section-B of tender and as well as to GIPCL
mail to [email protected]
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited
Surat Lignite Power Plant
At Village: Nani Naroli,
Taluka: Mangrol,
Dist.:Surat-394 110, Gujarat.
Phone: (02629) 261063-65. Mo- 9099006550 E-Mail: [email protected]
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named
Company/GIPCL), is a Premier Power Utility in the State of Gujarat with an installed capacity
of 1859.40 MW comprising of various conventional and renewable projects.
GIPCL commissioned its first power project; a 145 MW gas based combined cycle power
plant in year 1992 at Vadodara. It expanded its capacity 165 MW Naptha & gas based
Combined Cycle Power Plant at Vadodara in year 1997. GIPCL has commissioned 1MWp
Distributed Solar Power Projects at two locations in Gujarat viz. at Village: Amrol, Dist.:
Anand and at Village: Vastan, Taluka Mangrol, Dist.: Surat.
Surat Lignite Power Plant (SLPP) with four units of 125 MW installed capacity each is located
at Village: Nani Naroli, Taluka: Mangrol, District: Surat in Gujarat. GIPCL has also operating
its own captive Lignite and Lime Stone Mines close to the Power Plant. The Power Plant is
based on Circulating Fluidized Bed Combustion (CFBC) technology for the Boilers, where
Lignite is burnt along with Lime Stone in the Combustor of the Boiler. It also commissioned
5 MW solar power station at SLPP in year
GIPCL has successfully commissioned 937 MW Solar Generating Capacity spread across
various locations in Gujarat and 112.40 MW Wind Generating Capacity in the Saurashtra
& Kutch region of Gujarat
Surat Lignite Power Plant (SLPP) is accessible by road from Kim and Kosamba, which are
on Mumbai-Ahmadabad highway. From Kosamba, SLPP is around 32 KM, out of which
KM is part of the National & State Highway and balance 5 KM is District Road. From Kim,
SLPP is around 18 KM, out of which 13 KM is the State Highway and balance 5 KM is District
Road. The nearest Broad-Gauge Railway Line is at Kim, which is around 21 KM from the
SLPP. Surat is approximately 50 KM from the SLPP. Location Map for SLPP is as under.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
The Company intends to award Contract for Civil works for “Renovation of
Attached Toilets of Guest House Rooms in VIP Block at Tapi Guest House and Wash
Basin Area including Ladies’ and Gents’ Toilets at Narmada Guest House, SLPP
Colony” and therefore inviting open online (through https://tender.nprocure.com) from
experienced & resourceful contractors.
2. SCOPE OF WORK
Scope of work includes Civil works for Renovation work of civil, plumbing, sanitary
and finishing works for renovation of the attached toilets of 08 Ground Floor Guest
Rooms and 01 First Floor Suite Room in the VIP Block of Tapi Guest House and the
Wash Basin Area including Ladies’ and Gents’ Toilets at Narmada Guest House. For
detail scope of work, refer clause 1 of special conditions of contract (Section-D).
3. GENERAL INSTRUCTIONS
3.1 The Bidders who are interested in participating in the tender must read and
comply with the instructions and the Terms & Conditions contained in the tender
3.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately. Any
alteration, erasures or overwriting shall be liable to make the tender invalid
unless the same is neatly carried out and attested over the full signature of
Bidder. The decision of the Company to interpret the information and rates filled
in by the Bidder shall be final and binding on the Bidder.
3.3 The Bidders are requested to make themselves fully conversant with the
General Conditions of Contract, Special Conditions of Contract, Technical
Specifications, Site conditions, Safety & Health Aspects and Norms to be
observed etc. before submitting their bids so that no ambiguity arises in these
respects subsequent to submission of the Bids.
3.4 Before quoting bid, the Bidder must visit site and should go through the
specifications, scope of work etc. and get himself fully conversant with them.
The Bid should include cost of mobilization and cost to adhere to all Safety
Norms as described in the tender. No relaxation or request for revision of
quoted/accepted rates shall be entertained subsequent to the opening of Bid
on account of mobilization or Safety costs
3.5 Bidder has to submit all the information as per required Bid document. Failure
to furnish all the information as per required Bid documents or submission of a
Bid containing deviations from the contractual terms and conditions,
specifications and requirements, shall be rejected.
3.6 The Bids shall be submitted within the time frames set out in the Notice Inviting
Tender (‘NIT’) and Bids submitted thereafter shall not be accepted and
3.7 The tender documents shall not be transferable.
3.8 The Bidders are expected to examine all instructions, forms, terms &
specifications in the Bid documents and to get fully acquainted themselves with
all the conditions and matters which may affect the subject matter of the
work/tender or the cost thereof. If any Bidder finds any discrepancies or
omissions in the specifications and documents or any doubt in true meaning or
interpretation of any part, he shall seek necessary clarifications in writing or
during site visit if required.
3.9 Conditional offers shall not be considered and liable to be rejected.
3.10 The Company reserves the right to extend the deadlines for submission of the
Bids by giving amendments.
3.11 During evaluation of Bids the Company may, at its discretion ask the Bidder (s)
for clarification of their Bid. The request for clarification and the response shall
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
be in writing and no change in prices or substance of the Bid shall be sought,
offered or permitted.
3.12 The Company reserves the right to amend/ modify the Bidding documents at
any time prior to the deadline for submission of Bids, either at its own discretion
or in response to the clarification requested by a prospective Bidder. In such
case, the Company may in its discretion extend the deadline for submission of
Bids in order to facilitate the prospective Bidders for incorporating the effect of
the amendment in their Bids.
3.13 The Bidders shall bear all costs and expenses associated with the preparation
and submission of their respective Bids, to attend meetings or conferences, if
any, including any pre award discussion with the successful Bidder, technical
and other presentations etc. and the Company shall not be liable for any
expense thereof.
3.14 If the successful Bidder is consortium/joint deed of undertaking of company, the
Consortium leader/Bidder shall accept joint and several responsibilities and
liabilities for all obligations under the Contract.
3.15 Timely and satisfactory completion of the work and strict adherence to the
allotted time frames for jobs shall be the essence of the contract.
3.16 The Company reserves the right to qualify/disqualify any applicant without
assigning any reason.
3.17 The Bidder shall be disqualified if any untrue statement or misrepresentation is
made in the Bid forms, attachments and other supporting documents submitted
It is 1 and necessary for all interested bidders to visit the Surat Lignite Power Plant –
Colony (SLPP-Colony) after downloading the tender copy from website:
https://tender.nprocure.com or https://gipcltender.nprocure.com. or www.gipcl.com to
understand the actual working conditions, compliance related to labour, safety etc…
before submitting their offer. Failing which, any consequential liabilities arising will be
to bidder’s account.
The Bidders shall examine the site of works and its surroundings at his/her own
responsibility. The bidders shall collect information that may be necessary for
preparing the Bid and entering into a contract. All costs and liabilities arising out of
the site visit shall be at Bidder’s account.
The Bidder is deemed to have examined and understood the tender document,
obtained his/her own information in all matters whatsoever that might affect the
carrying out the works expressly mentioned or works which may have to be carried
out to fulfill his/her contractual obligation within the scheduled rates and to have
satisfied himself/herself to the sufficiency for his/her offer.
The submission of tender by a contractor implies that he has read these instructions,
conditions of the contract etc. and has himself aware of the scope, nature of works &
specifications of the works to be done. GIPCL will not, therefore after acceptance of
contractor’s rate, pay any extra charges for any other reason in case the contractor
is found later on to have misjudged the site conditions.
Any error in description or quantity or omission in the contract document shall not
vitiate the contract or release the contractor from executing the work comprised in
the contract according to scope of works, magnitude of the works, requirement of
materials, equipment, tools & tackles, safety PPEs, making site safety arrangements,
manpower, supervisors, labour, etc. Contractor has to complete the work in
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
accordance with the contract documents irrespective of any defects, omissions or
errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as access to site, communication, transport, working
condition including constraint of work place due to residential colony, misc. nature of
works at various locations in Guest House & infrastructure facilities, confined area,
importance of work, round the clock working conditions, safety requirements, the type
and number of equipment and facilities required for the satisfactory completion of
work, the quantity of various items of the work, the availability of local labour,
carpenter, plumber, masons, availability and rates of materials, local working
conditions, uncertainties of weather, obstructions and hindrances that may arise, etc,
which may affect the work or cost thereof, before submission of his Bid. Ignorance
of site conditions shall not be accepted by the GIPCL as basis for any claim for
compensation. The submission of a Bid by the BIDDER will be construed as evidence
that such an examination was made. Any later claims / disputes in regard to rates
quoted shall not be entertained or considered by the GIPCL.
The rates quoted by BIDDER shall be based on his own knowledge and judgment of
the conditions and hazards involved and shall not be based on any representations
of the Engineer.
5. ELIGIBILITY CRITERIA (PHYSICAL COPIES OF SUPPORTING
DOCUMENTS MUST BE SUBMITTED FOR EACH OF FOLLOWING
ELIGIBILITY CRITERIA)
The following criteria shall be adopted for qualifying the Bidders for consideration of
the Bid for the further proceeding.
5.1 Bidder should possess minimum Three years of work experience during last five
years in similar nature in civil construction/ maintenance works of buildings &
infrastructure facilities in Power Plant, Process Industries, Residential Colony,
Corporations, Corporate, Institutes and should enclose proof of the same. Bidder
shall submit necessary evidence for the same like attested copies of work orders
along with work completion certificates from clients. The work completion certificate
shall comprise of order value and executed value. Bidders should have executed the
work directly. The work executed as a sub-contractor or subletting agency shall not
be taken in to consideration.
5.2 Bidder should produce evidence of having experience of successfully completed similar
works (as per above clause no. 5.1) as defined hereunder during last five years
ending last day of the month previous to the one in which tender is invited, satisfactory
progress of ongoing works etc. secured from clients along with self attested copies
of documentary evidence preferably photo copies of work experience. The
experience should be either of the following:
a. One similar completed/executed work each costing not less than the amount equal
to Rs. 21.00 lakhs.
b. Two similar completed/executed work each costing not less than the amount equal
to Rs. 13.12 lakhs.
c. Three similar completed/executed work each costing not less than the amount
equal to Rs. 10.50 lakhs.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Bidder should specifically mention fulfilling of above criteria in his offer along with
details of work orders & work completion certificates issued by clients.
5.3 Tender fee: The tender fee of Rs. 2,950/- (Rupees Two Thousand Nine Hundred and
Fifty only), including applicable GST (nonrefundable) shall be submitted through
RTGS or through online payment as per details provided in clause no. 07 herein
5.4 EMD: The EMD of 22,300/- (Rupees Twenty-Two thousand Three hundred only),
shall be accompanied in the form of DD/RTGS/online or irrevocable Bank Guarantee
given by Bank as described in subsequent clause no.
5.5 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner.
5.6 Attested copies of relevant documents duly signed & seal on each & every page shall
be submitted. The above documents will be analyzed and after satisfaction, the Price
Bid will be open. GIPCL may verify the documents, experience certificates issued by
concern authority. After opening of technical Bid, if any required attested documents
found missing in the Technical Bid submitted by the Bidder, the tender inviting
authority may inform to that Bidder only once by E-mail to submit the missing required
documents within stipulated time limit. If Bidder/Bidders fail to submit within stipulated
time, their Bid will be declared technically disqualified and no further correspondence
will be entertained.
5.7 Bidder should have minimum average annual turnover of Rs.7.90 Lakhs for last three
financial years (2023-24, 2024-25 & 2025-26). Bidder shall furnish annual audited
financial statement duly certified by Chartered Accountant for the last three financial
years to demonstrate the financial healthiness of the company. The balance Sheet
must be in the name of the company. Any type of MOU for this purpose will not be
Note: In case, the annual turnover is less than the statutory guideline which does not
require audit, the bidder shall submit the turnover certificate from Chartered
5.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN) & GST
registration number. Copies of the same shall be submitted.
5.9 The net worth of the bidder should be positive as evidenced from audited accounts
of last financial year (2025-26), audited (or where, as per extant laws of the land,
audit is not applicable, certified) by a qualified Chartered Accountant who should be
a member of the Institute of Chartered Accountants of India.
5.10 In case Bidder is Consortium/Joint deed of under taking of company, the above
requirements/credential of consortium leader/bidder shall be considered unless
otherwise specifically mentioned in the tender.
5.11 If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered /
Stopped or banned from dealing in the past by any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations, Bid of that party may be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regards as final and binding on the
Bidder without any demur and that no further correspondence shall be done in this
regard at any stage. Bidder shall have to submit “Declaration for Contractual
Litigations” as amended in Annexure / Form attached.
5.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” as amended in Annexure / Form attached.
• If any Major Violation of any safety law(s) / Rule(s) is / are found during the
preceding Three (3) years, Bid of that party will be liable to be rejected. Bidder
agrees and undertakes to accept decision of GIPCL in this regards as final
and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
• If any of the details submitted in the prescribed Annexure / Form to the Bid
is/are found to be false, incorrect at any time in future, then the Contract
awarded to that Bidder / Contractor shall be liable to be terminated forthwith
without any notice / correspondence and Bidder agrees and undertakes to
accept decision of GIPCL in this regards as final and binding on the Bidder
without any demur and that no further correspondence shall be done in this
regard at any stage. Further, Performance / Security Deposit will also be
liable to be forfeited. Any dues to GIPCL from the Bidder / Contractor shall be
recovered from the pending bills or any other dues payable to the Bidder /
Contractor, if any or otherwise through any other recourse available under
The Bidder shall submit all the evidences, documents, attested copies of work
orders & work completion certificates etc… as a proof with EMD &Tender Fee
and also provide the requisite details online for meeting the prequalification
requirements. GIPCL will verify the experience, performance, capability &
strength of Bidders, independently for executing the job. GIPCL may visit the site
& consult the owner of the industry/property where similar job is executed by the
Bidder. GIPCL reserves the right to accept/cancel/reject any/all Bids without
assigning any reason thereof. The tenders of qualified Bidder/Bidders shall only
be considered for further evaluation.
Site Visit is mandatory prior to submission of bid to understand the scope of work,
working conditions, site conditions, equipments, tools & tackles, labor
deployment, associated risk, surrounding etc.
6. LANGUAGE OF BID
The Bid prepared by the Bidder and all correspondence & documents relating to the
Bid exchanged by the Bidder & the Company, shall be written in the English
language. Any printed literature furnished by the Bidder, written in another language
shall be accompanied by an English translation for the purpose of interpretation of
7. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
7.1 An EMD of Rs. 22,300/- (Rupees Twenty-Two thousand Three hundred only
and Non-refundable Tender fee Rs.2,950/- (Rupees Two Thousand Nine
Hundred fifty only) shall accompany with Bid. Tender fee shall be submitted
through RTGS / online mode of payment only.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in
favor of Gujarat Industries Power Company Limited from any Schedule Public
Sector Bank or Private Sector Bank as per Performa of BG enclosed with this
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively, The EMD & Tender Fee may also be submitted through
RTGS/NEFT/online mode of payment by the bidders as per the details given
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
RTGS detail for Tender fee:
1. BANK NAME:- State Bank of India
2. BRANCH:- Nani Naroli
3. IFSC CODE:- SBIN0013423
4. BENEFICIARY NAME: Gujarat Industries Power Company Limited
EMD & Tender fee may also be submitted through online payment
gateway of company’s website:www.gipcl.com (online payment form)
as per detail provided in ANNEXURE- G of Section-F herein under.
7.3 In case EMD is paid in the form of BG, the same shall be valid for a period of
180 days after the due date for submission of the bid
7.4 The EMD of the successful bidder will be returned after payment of Security
Deposit by successful bidder and after award of LOI/Work Order. Alternatively
EMD will be converted in SD and successful bidder shall submit SD or
performance bank guarantee for balance amount.
7.5 The earnest money deposit paid in the form of demand draft will be refunded
to the unsuccessful BIDDER as soon as the tender is finalized and awarded
of LOI/Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Detail of
Tender fee & EMD paid by RTGS/online payment should be submitted as per.
Clause 7.9.EMD in physical form, to be submitted directly to GIPCL as per
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after
acceptance or (ii) withdraws his tender before the validity date of the tender.
7.9 SCHEDULE OF EMD & TENDER FEES AND OTHER SUPPORTING
Details/receipts of EMD & Tender Address for Submission:
fee paid by RTGS/online or EMD in Chief General Manager (Thermal)
physical form by way of DD/BG (as GUJARAT INDUSTRIES POWER CO. LTD.,
applicable) with other documents (Surat Lignite Power Plant)
duly signed to be submitted in Village: Nani Naroli, Taluka: Mangrol,
physical form in sealed cover as per District: Surat. PIN: 394110, Gujarat. Phone
details mentioned in NIT. Bid No. : 02629-261063
shall be mentioned at the top of EMAIL: [email protected].
cover/envelope.
8. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
The bids shall be submitted online at the https://tender.nprocure.com or
https://gipcltender.nprocure.com within the dates specified in the NIT along with the
details of tender fees, EMD in two parts as under:
(a) Pre-qualification and Techno-commercial Bid without price.
Note: Tender fee RTGS details and EMD shall be submitted in physical
form as per NIT.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
(a) Pre-qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with techno-
commercial deviations, if any, shall accompany the bid. The following Information
shall be provided in the techno commercial bid:
1. Qualification and experience of site in charge.
2. Schedule of deviation (Annexure-E in Section-F) Technical as well as
commercial, if any.
The following supporting documents shall also be submitted along with EMD &
Tender Fee in physical form:
1. The tender documents duly signed in all pages without price bid along with
techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria as mentioned in
tender document
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three years, audited annual accounts/financial statements
i.e. profit and loss account and balance sheet duly certified by a practicing CA
will be required as specified in clause nos. 5.7 & 5.9 above.
7. P.F. Number and Allotment Letter.
9. GST registration number/certificate copy.
10. Declaration-cum-Undertaking for Compliance of Safety Laws & Regulations
and Contractual Disputes / Litigations as per Performa Annexure-F under
11. E-Reverse Auction User ID on website: https://e-auction.nprocure.com
1. Percentage Rate Price Bid shall be submitted only in soft form through e- portal
Note: Offered percentage rate (service charge) on total estimated SoR
value (including @ 18%GST) includes cost of all approved make & quality
materials (except flush cement, and as specifically mentioned in item
nomenclature), manpower, supervisors, insurance, safety PPEs, staging,
shuttering & scaffolding, survey works, transportation, mobilization-
demobilization cost, loading-unloading & proper storage, security &
safety, equipment, machinery, vehicles, consumables all the required
tools & tackles, accommodations etc…, safety equipments & PPEs,
Royalties, Rents, legal & statutory compliance, all taxes & duties
(including GST).
Total Estimated SoR Amount is including GST by considering present GST
2. Bidder’s % offer will be on Total Estimated Amount (including GST) and in
Invoice/Bill, GST shall be mentioned separately as per extant GST Laws at
actual as per prevailing rates as declared by Central Government on
submission of documentary evidence.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
3. Bidder shall have to quote the rates in the form of %age. i.e. “At Estimated
Value OR _____%age below the estimated value OR______% age above
the estimated value”.
4. The quantities shown in the SoR (Section-E) are approximate for the contract
period and may vary as per job requirement.
5. The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
6. Rates will remain firm throughout the contract period and any extension thereof.
There will not be any escalation/compensation to the contractor against any
revision and/or change in rate of materials, fuels, MWR (Minimum Wage Rates),
etc… whatsoever.
(B) METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence & place of
business of the person/persons submitting the Bid and must be signed & sealed
by Bidder with his usual signature. The name of all persons signing the
documents shall also be typed or printed below the signature on each page.
(ii) Bid by a consortium/joint deed of undertaking of company/partnership firm must
be furnished with full names of all partners and be signed with the partnership
name, followed by the signature and designation of one of the authorized
partners or other authorized representative(s). A certified copy of the power of
attorney authorizing such partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e. by the President/Managing Director/Secretary or
other person or persons authorized to Bid on behalf of such
Corporation/Company. A certified copy of the board resolution/power of attorney
authorizing such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the
(v) Erasures or other changes in the Bid Documents shall be initialed by the person
signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
9. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission of
Bids and the expiration of the period of bid validity.
10. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the
bid and till official intimation of award/rejection made by the Company to the
b. While the Bids are under consideration, Bidders and / or their representative or
other interested parties are advised to refrain from contacting by any means, the
Company. The Engineer, if necessary, will obtain clarifications on the Bids by
requesting for such information from any or all the Bidders, in writing as may be
necessary. The Bidder will not be permitted to change the price or substance of
the Bid after the Bid has been opened.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
11. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always
be at liberty to reject or accept any Bid or Bids at his sole discretion and any
action will not be called into question and the Bidder shall have no claim in that
regard against the GIPCL.
12. OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure
has been specified. Otherwise the tender will be opened by the authorized
officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors, for sureties
furnished by bidder, for authentication of documents submitted and
completeness of the Bids.
12.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that is
obtained by multiplying the unit price and quantity, the unit price shall
prevail and the total price will be corrected & will be binding to the bidders.
(b) If there is a discrepancy between the Total Bid Amount and the sum of
total prices, the sum of total prices shall prevail and the Total Bid Amount
will be corrected & will be binding to the bidders.
13. EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the
lowest evaluated Bid in conformity with the specifications of the tender
13.2 The Technical Bids will be examined for minor matters regarding qualification
of bids. Subsequent to correspondence with the respective bidders, the
decision of Tender Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or before
the given date requested by the Company. If the Technical clarifications sought
by the Company do not reach the Company on or before due date, the Bid will
13.4 The comparison of all the Bids shall be carried out with reference to the scope
of work as per the technical specification. Any deviation/omission shall be
evaluated at highest quoted price of the deviation/omission quoted by any of
the Bidder. In case a separate price (for omission) is not given by any other
Bidder, a reasonable price of the same shall be taken & the same shall be
binding to the Bidders.
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par.
The loading shall be carried out at an interest rate of 2% above PLR of SBI.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
13.6 A Bid to be substantially responsive shall be one which on evaluation confirms
to all the terms, conditions and specifications of the Bid documents without any
material deviation or reservation.
13.7 For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of
the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with the
Bid documents, GIPCL’s right or the Bidder’s obligations, under the
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the
Bidding process and reject all Bids at any time prior to award of contract,
without thereby incurring any liability to the affected Bidder or Bidders or any
obligation to inform the affected Bidder or Bidders regarding the same.
14.2 Any Tender without EMD and Tender fee will be treated as non responsive and
shall be rejected at the outset & no further correspondence shall be entertained
regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids
if such Bidder has quoted an abnormally low rate in the Bid document/price
15. AWARD OF CONTRACT
15.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest
quotation in conformity with the requirements of the specifications and
documents contained herein, provided further that the bidder is determined and
evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful bidder shall be intimated of his selection through the Letter of
Intent or Letter of Award/ Work Order which shall be sent to him through e-mail,
courier, fax or registered mail.
15.3 GIPCL reserves the right to cancel/short close the contract during the contract
period without assigning any reason.
15.4 GIPCL reserves the right to split the contract quantity between vendors.
16. CONTRACT PERIOD
16.1 The contract will be for a period of 04 (Four) months from the date of issue
of LOI/WO, with a mobilization period of 10 days.
16.2 GIPCL reserve the right to extend the contract period up to 3 months on the
same rates and terms and conditions without any price escalation and without
entering into any new contract.
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
18. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for timely &
satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled manpower
separately to properly complete the job in given/scheduled time.
(iii) The Contractor shall depute its own workmen/labor with proper identification to enter
the plant premises after ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the
applicable labor laws/Acts norms including but not restricted to the age of the workers,
women workers and shall also ensure that a police verification and security check for
all the workmen/labor engaged at the GIPCL site is done and necessary documents
regarding the same shall be submitted to the GIPCL’s authorized
representative/officer-in-charge. Any default in complying with the same or any
misrepresentation regarding compliance of the same shall compel GIPCL to initiate
appropriate civil or criminal proceedings regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide his
workmen/labor with safety equipment like helmets, masks, gum boots, and other
necessary PPEs for properly undertaking the operations involved under this contract.
Following are also to be issued by contractor :
a) Safety shoes
b) Goggles / face shield.
c) Ear plug / Ear muff.
d) Hand gloves like electrical hand gloves / cotton hand gloves / Chemical hand
(vi) Contractor shall nominate /authorize senior experienced person in writing as site in
charge to co-ordinate with GIPCL engineer and who shall bear overall responsibility for
performance of the contract. Such person shall remain always available at site or site
office allotted to the contractor at SLPP site. Contractor has to submit the authority
letter and documentary proof for the same.
(vii) The Contractor shall appoint a supervisor who shall co-ordinate with GIPCL’s Engineer
In - Charge for daily entrusted job. They have to maintain daily records dully signed for
the works carried out and duly certified by Engineer-In-Charge. The Contractor in co-
ordination with the Engineer-In-Charge shall ensure the availability of adequate
manpower to carry out the job satisfactorily on a daily basis. As per the instruction of
Engineer-In-Charge they have to allot the work and execute the same in specified time
(viii) During execution of the works, one or more jobs may be required to be done
simultaneously and the Contractor shall mobilize additional resources accordingly.
(ix) During emergency or similar situations the Contractor shall be required to mobilize
resources as per need within the period of 24 hours as directed by GIPCL. If the
contractor fails to mobilize sufficient manpower to complete the job in time, GIPCL will
execute the job through other agency at the risk and cost of the contractor with 10%
supervision charges& the same will be recovered from the Contractor’s bill.
(x) During working in high risk area the workman must wear a suitable safety apron, safety
belt, safety hand gloves and goggles. It is the contractor’s/contractor’s supervisor’s
responsibility to ensure it without fail.
(xi) During emergency for work, the contractor has to enhance the site manpower as per
the requirement to ensure the timely completion of work. For this, enhanced work shall
be completed by deploying additional manpower with separate supervisor. Payment
will be made on item rate basis only. The work during the emergency period is to be
carried out round the clock. Contractor should mobilize sufficient number of manpower
and execute the work in all shifts with independent manpower. Contractor should not
continue the same manpower for more than 12 hours.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
B: TOOLS & TACKLES:
(i) All equipments and tools & tackles required to execute the contract are in the
scope of the contractor. The contractor should ensure that equipments and tools
& tackles are in healthy & working condition. All consumable items would be in
the scope of the contractor.
Note: If work is suffered due to want of sufficient manpower,
equipments, tools & tackles, vehicles and/or required consumables
then 25% of the total job cost including applicable GST will be levied
as a penalty for each and every instance.
(ii) For proper execution of the work as per the scope, the contractor is required to
maintain/arrange timely sufficient quantity of equipments and tools & tackles like
but not limited to breaker machine, plumbing kit, carpentry kit, staging, shuttering
& scaffolding materials, survey work equipments, transportation vehicles,
Concrete Mixer machine, Concrete vibrators, water tanker, all consumables like
but not limited to petrol, diesel, oil, gas, etc…, power cables, power supply
extension boards, sockets, flash back arrestor, industrial gas, welding rods, gas
cutting set, gas cylinders, welding set, hand gloves, welding helmets, tractors
with standard hydraulic trolleys etc… in good working condition at site as per day
to day work requirements and emergency situations to complete the work in
stipulated time.
(iii) In case of breakdown of equipment, the contractor should work round the clock
for putting back the area in service immediately within minimum time. In case of
any emergency arising during night hours the contractor should be in a position
to mobilize the manpower immediately within minimum time.
(iv) Arrangement for lighting at the work spot has to be made by the contractor. He
has to arrange all lighting equipment such as power cable, hand lamps. The
contractor has to take prior approval for taking electrical power supply. The
contractor should keep hand lamps of 24Volt for confined space and sufficient
quantity of 240 Volt and halogen lamp for other area ensuring safety at work
(v) Pin sockets of IS standards should be used for all connections. For any accident
take place & any damage to the equipment and/or injury to human due to
carelessness in loose connection, contractors will be held responsible & liable
for any recovery/actions.
19. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company before one week of last date of submission of
online Bid, in writing or by E-mail at the GIPCL's mailing address [email protected]
as indicated in the 'Invitation to Bids'. The GIPCL's response (including an
explanation of the query) will be sent in writing or by E-mail to all prospective Bidders
who have received the Bidding Documents.
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
21. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND
The Bidder is required to carefully examine the specifications and documents, all the
conditions and matters work wise & cost wise. If any Bidder finds any discrepancies
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
or omissions in the specifications and documents or is in doubt for any meaning of
any part, he shall request in writing for an interpretation/ clarification to the GIPCL or
during site visit.
All such interpretations and clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable
through RTGS (online payment) system only based on submission of required
documents like bank mandate form with cancelled cheque
23. POINTS TO BE CONSIDERED FOR QUOTING ONLINE PRICE BID
a The schedule of rates shall be read in conjunction with Instructions to Bidders,
General conditions of contract, Special conditions of contract and Technical
specifications and also considering free issue cement, and as specifically
mentioned in item nomenclature.
b The quantities given in the schedule of rates are estimated and payment will be
made as per actual works carried out at respective item rates of work order.
c The method of measurement of completed work for payment shall be in
accordance with the method of measurement specified in the tender.
d No separate amount shall be payable for use of auxiliary equipment incidental
to or in day to day operation in the course of fulfillment of contractual obligation
of the supplier.
Note: It is desirable from interested bidders to submit the online tender
offer at least two days in advance from the due date set for online
submission of bid in order to avoid non-participation of e-tender due to
probable technical problem in e-tender system/server
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract period
based on site requirement. Contractor shall not be entitled for any compensation on
ground of such alteration in scope of work. GIPCL reserves the right to operate or
increase/decrease quantities in each item or omit any item included in Schedule of
Quantity at his discretion. Quantity of individual item of SoR may vary to any extent.
However, contract value will be remained firm. Contractor shall have no claim,
whatsoever, on grounds of loss of anticipated profit etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require to be
carried out the whole/part of the work as specified in the tender, the ENGINEER-in-
charge shall inform the fact for thereof to the CONTRACTOR and contractor shall
have no claim for any payment or compensation whatsoever on account of any profit
or advantage which he might have derived from the execution of the work in full but
which he did not derive in consequence of the full amount of the work not having
been carried out nor shall he have any claim for compensation by reason of any
change having been made in the original specifications and instructions which shall
involve any curtailment of the work as originally contemplated.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING & E-
REVERSE AUCTION
SR. DESCRIPTION
1. Tender documents are available only in electronic format and same can be
downloaded from the website: https://tender.nprocure.com or
https://gipcltender.nprocure.com and It can also be viewed from Company’s
website www.gipcl.com
2. Price bid should be submitted online through the website
https://gipcltender.nprocure.com only. No physical submission of price bid
will be entertained as it should be furnished on-line only
3. Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidders can
procure the same from any of the license certifying Authority of India or can
contact (n)code solutions- a division of GNFC Limited, who are licensed
Certifying Authority by Government of India
4. All bids should be digitally signed. The bidders are required to contact at the
below mentioned address for detailed training on on-line tendering and also
for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Info tower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India).
E-mail: [email protected], website: https://tender.nprocure.com
Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for online submission of bid in order to avoid non-
participation in case of any technical issues (website and/or network) at last moments.
E-REVERSE AUCTION:
i. GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
ii. E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b) Minimum
three (03) lowest bidders, whichever is higher, shall be invited for participation in e-
Reverse Auction through n-procure platform.
iii. Opening Price (including GST), Decrement value and duration for the e-Reverse Auction
shall be informed to the qualified bidders before start of e-Reverse Auction.
iv. After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract
Price (including GST).
v. To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
website: https://e-auction.nprocure.com that the bidder shall be allowed to participate
the e-Reverse Auction.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
vi. In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required for
participating in online e-reverse bidding, then the Bidder can contact the following office
for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://tender.nprocure.com for information regarding e-tendering
registration process.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security, the successful Bidder, to whom the work is awarded, shall be
required to furnish a Performance Bank Guarantee (PBG)/Contract security deposit
in favour of Gujarat Industries Power Company Limited for guarantee amount at ten
percent (10%) of the “Contract Price” (excluding GST) from any Nationalized Bank
including Public Sector bank-IDBI Ltd or AXIS Bank, HDFC Bank, ICICI Bank or
Kotak Mahindra bank, IndusInd Bank or Federal Bank, Karur Vysya Bank or Bandhan
Bank in the format attached in SECTION-F, and it shall guarantee the faithful
performance of the 'Contract' in accordance with the terms and conditions specified
in these documents and specifications. Contract security deposit shall be submitted
strictly within twenty-one days from the date of LoI or work order, whichever is earlier.
The guarantee shall be valid up to guarantee period of twelve months from the
contract completion date. The Guarantee amount shall be payable to the Company
in Bidder's home currency without any condition whatsoever
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract
security deposit.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the ‘Guarantee Period' after
completion of contract and on fulfilling contractual obligations throughout the
retention period. However, any delay in submission of initial SD will result in
equivalent late release of entire SD after guarantee period.
Bid security/EMD should be refunded to the successful bidder on receipt of
Performance Security
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of
contractor or any other reasons attributed to contractor the decision of
Engineer-in-charge regarding the amount of recovery shall be final and
binding subject to a maximum of 10% of contract value (inclusive of GST).
Recovery will be affected from the monthly bills and/or retention
money/security deposit.
(ii) If the contractor fails to execute the work as per directions of Engineer (I/c)
within the time frame given in work order and as per day to day instructions
by Engineer-in-charge, GIPCL shall get the work done by third party at the
risk & cost of the contractor with 10% additional overhead charges of GIPCL.
3. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL. The contractor shall
pay all such claims within 15 days of claim, failing which the same shall be deducted
from the bills of contractor.
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule.
Contractor shall mobilize required resources within 04 hrs to meet the emergency
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
requirements and in case contractor fails to complete the emergency jobs related to
Guest House renovation work, GIPCL will engage third party and will recover
expenses from contractor’s R.A. bills, Security Deposit and / or whatsoever for
expenses incurred to complete the job along with additional 10% overhead charges,
plus applicable GST as per extant GST Laws.
In case if contractor’s services are not found satisfactory with respect to timely
mobilization to meet emergency requirements, time bound activities, workmanship &
safety (OHSAS policy of GIPCL) then GIPCL has right to terminate the contract at
any time by giving 15 days advance notice without assigning any reason and will
make the alternate arrangement at the risk & cost of contractor. GIPCL may terminate
the contract after due recoveries of pending jobs/damages after giving 15 days
advance notice to the contractor if any of the following events occur –
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per
requirements of the contract.
iv. Contractor has neglected or failed persistently to observe or perform any of
the acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality
viii. GIPCL reserves the right to terminate the contract without giving any reason
whatsoever and forfeit the PBG.
5. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/ ENGINEER
requiring compliance, with such further drawings and / or the GIPCL /ENGINEER
instructions fails within seven days to comply with the same, the GIPCL /ENGINEER
may employ and pay other agencies to execute any such work whatsoever as may
be necessary to give effect thereto and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL on a certificate by the
GIPCL/ENGINEER as a debt or may be deducted by him from any money due or to
become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and
equipments as per directions of GIPCL / ENGINEER within the time frame given
and/or violating the GIPCL’s safety rules & regulations, ENGINEER/ GIPCL shall get
the work done by third party at the risk & cost of the CONTRACTOR with additional
10% overhead charges of GIPCL and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL /ENGINEER as a debt or may
be deducted by him from any money due or to become due to the CONTRACTOR.
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract
to the extent possible shall be settled amicably between the parties. If amicable
settlement cannot be reached all the disputed issues shall be resolved through
arbitration before a Sole Arbitrator appointed by Managing Director, GIPCL
according to the provisions of The Arbitration & Conciliation Act-1996, as
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
amended from time to time. The place of arbitration shall be at Vadodara/ Surat
or any other place within state of Gujarat.
b. Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless the
decision of the Arbitration proceedings is obtained.
7. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification,
the decision of Chief General Manager (Thermal) - GIPCL will be final and binding
on the contractor.
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees,
staff applicable under the Employee Compensation Act 1923 or any amendment
thereof as also insurance cover for third party liability. The contractor shall keep the
GIPCL indemnified from all liabilities arising out of his action in pursuance of this
contract. The E. C. Policy should be obtained from Surat Jurisdiction and shall be
assigned to GIPCL. EC policy should cover the specified contract period.
Contractor shall also obtain additional off-duty coverage insurance policy for all his
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labor laws, rules,
orders and notifications whether central or state or local as applicable to him or to
this contract from time to time. These Acts/Rules include without limitation of the
1. Contractor shall be solely responsible and shall fully comply with all the provisions of
all the labor laws applicable such as but not limited to the Minimum Wages Act,
Contract Labor (Regulation & Abolition) Act 1970, Factories Act, 1948, Industrial
Dispute Act 1947, Workmen Compensation Act 1923, Interstate Migrant Workmen
Act 1979, Equal Remuneration Act with Rules, Order and Notifications issued/made
there under from time to time.
2 All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future applicable
to the contractor from time to time for performing the contract job.
2.1 The Contractor shall provide and be responsible for payment of Wages,
Salaries, Bonus, Social charges, Insurance, Food, Accommodation,
Transport, Medical and Canteen facilities and other statutory privileges and
facilities to his personnel as per law/rules/regulations and orders of the
Central Government, State Government, Local Authorities or other authorities
as are in force from time to time. All employees of the Contractor shall be
employee of the Contractor.
2.2 The contractor shall have a valid license obtained from Licensing Authority
under the Contract Labor (Regulation & Abolition) Act-1970 at the time of
execution of the contract covering all his employees working at Colony/SLPP
site and furnish the same failing which GIPCL may terminate the contract at
its sole discretion.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
2.3 The Contractor shall at the time of execution of the contract have a EPF Code
Number obtained from the Authorities concerned under the Employees
Provident & Miscellaneous Provisions Act, 1972 and remit contributions in
respect of the employees employed by him at Colony/SLPP Site to the P.F
office concerned every month failing which GIPCL will recover from the
outstanding payment to the contractor from GIPCL.PF code of Gujarat region
should be taken.
2.4. The Contractor shall maintain all records/registers required to be maintained
by him under various labor laws mentioned above and produce the same
before the Statutory Authorities whenever required.
2.5 The Contractor shall also submit periodical reports / returns to the various
statutory authorities such as the Contract Labour (Regulation & Abolition) Act-
1970, Employees Provident Fund Act etc. Under intimation to HR& Admn.
2.6 The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
2.7. The Contractor shall be responsible for payment of overtime wages to his
workmen, if any, in case they are required to work beyond the prescribed
hours under law as per applicable rates.
2.8 The contractor shall take Workmen Compensation Insurance Policy for all
his employees working at Colony/SLPP. The contractor shall indemnify the
company against any liability due to any work injury or accident to any of its
2.9 The Contractor shall in the event any of his workmen / employee sustains any
injury or disablement due to an accident arising out of and in the course of his
employment, provide necessary medical treatment and pay compensation as
applicable, required under the Workmen’s Compensation Act,
2.10 If any of the persons engaged by the Contractor misbehave with any of the
officials or the Company or commit any misconduct with regard to the property
of the Company or suffer from any serious communicable disease, the
Contractor shall replace them immediately.
2.11 The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
2.12 GIPCL will have right to deduct and disburse the claims of the individual /
parties being a principal employer on any account whatsoever in relation to
their employment with the contractor. The Security deposit will be released
to the contractor at the end of the contractual tenure subject to an undertaking
by the contractor that in the event any of his workmen or the heirs of workmen
puts up a claim for recovery of money due to him from the contractor before
the appropriate authority under the I.D.Act 1947 or under any other labor laws
or for compensation under the Workmen’s Compensation Act, 1923 and the
appropriate authority has given a direction for making payment the contractor
will meet the same or indemnify GIPCL if in the event GIPCL pays it as
Principal Employer.
2.13 The contractor shall make payment of wages to his employees on fixed date
within the period specified under the applicable Law, in presence of
representative of the company. He will submit a true copy of wage sheet,
attendance register and P.F. remitted challans on monthly basis to HR&A
dept. for verification and record.
2.14 The Contractor shall provide Safety items / kits to his employees such as
safety shoes, goggles, ear plugs, hand gloves, safety belts etc., if any,
required under the law.
2.15 The contractor shall conduct pre-induction and periodic medical checkup of
his workmen as per applicable laws.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
2.16 The contractor shall be solely responsible for any accident caused to his
workers and should adhere to all rules / regulations as per labor laws of
Government and other statutory laws as applicable.
2.17 The contractor should register himself under the Contract Labor Act,
Employee Compensation Act and PF Act (Code no. to be mentioned) and
submit the copy of registration certificate and should possess the same from
the date of commencement of work, failing which the contract is liable to be
cancelled. The E.C. Policy copy should be submitted to the GIPCL before
commencement of the work and Labor License should be obtained within one
week from the date of issue of form-V. Contractor should apply for Form-V
immediately after receipt of LOI. A copy of Labour License shall be submitted
to GIPCL, HR & A Department.
2.18 Contractor shall have to insure his workmen /supervisors etc. under Group
Insurance scheme.
2.19 The Contractor shall be responsible for compliance of all statutory rules,
regulation, act enforced from time framed by the government such as Factory
Act, Employee Compensation Act, payment of ‘Wages Act’, Minimum Wages
Act’, Provident Fund Act, All Labor Laws Act in respect of employees engaged
by him for the work and shall have to maintain necessary records. In case
any amount becomes due to be payable by him to his employees or to the
Government under the above rules, regulation, Acts, GIPCL reserves the right
to recover the same from the running bill of the contract.
2.20 Documentary evidence of deposit of PF paid shall have to be produced by the
contractor along with the next bill.
2.21 Records as per the provisions of various statutory Acts will have to be
maintained by the contractor and submitted as and when required.
2.22 All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any
such person who does not comply with it.
2.23 The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new
statute shall automatically and immediately become applicable.
2.24 Annual Health Check Up: - As per statutory requirement, Contractor has to
inform workmen deployed at site for annual health check up as per schedule
prepared by HR&A department
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the provisions
of Contract Labour Act, 1970 and maintain necessary records and registers under
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act within one week time,
from the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within
the premises of the GIPCL and carry match box / lighter or any other explosive and
/or inflammable material inside the plant.
5. Contractor shall abide by all the statutory rules and regulations like Labour Laws etc.
6. Contractor shall issue an appointment order to each casual labourer stating therein
the nature of job to be performed by him and fix time for which the concerned
labourers are likely to be deployed. Contractor shall also issue a temporary identity
card specifying the period for which the labourer has been deployed.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
7. Contractor is fully liable for the persons engaged by him for above work; however,
GIPCL reserves the right to deduct any amount legally justified towards any liability
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment
of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame, GIPCL
shall get the work done by third party at the risk and cost of contractor.
10. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, etc in respect of
employees engaged by him for the work and shall have to maintain necessary
records. In case any amount becomes due to be payable by him to his employees or
to the Government under the above rules, regulation, Acts.
In case any amount becomes due to be payable by him/her to his employees or to
the Government under the above rules, regulation, Acts, GIPCL reserves the right to
recover the same from the running bill of the contract.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third party
workmen due to any act omission / indiscretion on your part while undertaking the
work and contractor shall fully abide by the statutory requirements of the employee's
compensation act. GIPCL shall not be liable for any compensation due to accident,
death or injury to any of contractor’s workmen or any third party due to negligence,
act or omission on your part.
Necessary illumination at works area will be provided by GIPCL.
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the GIPCL
which are at present in force and which may come into force during the pendency of
the contract. Any violation of any rules and regulations will entail immediate
termination of the contract.
When contractor moves his lifting tools and tackles to the plant area, required test
certificates as per the Factory Act 1948 and the state factories rules has to be
submitted to safety Deptt. Safety Deptt. will check the certificates and if found okay,
then only materials will be allowed to enter inside the plant. Material inward gate pass
will be made only after certification from Safety Deptt. Security Deptt. will inform to
Safety Deptt., as & when such tools and tackles brought at the gate for making entry
in the maintenance site.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
The contractor has to submit the list of required safety gears along with safety
equipments available with him to safety Deptt. Safety Deptt will check for quantity
and quality of the safety gears and then allowed permission of work. Poor quality
material will not be allowed to take inside the Plant. If quantity of required safety
equipments is not satisfactory, contractor will not be allowed to carry out the work
using such safety gears inside the Plant for the work.
15 GENERAL SAFETY CLAUSES
1 The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that
his workmen wears the protective equipments at all times during the work operation.
Following brand of the safety shoes and helmet shall be issued to contract workmen.
Contractor shall issue safety shoes every year.
Sr.No Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
02. V-Gard MSA IS : 2925 – 1984, ANSI / ISEA
03. PN 521 - Shelmet Karam
SR. No. Name of Manufacturer Model
1 Acme Fabrik Plast Co. SSTEELE (Strom) – Double Density
2 Acme Fabrik Plast Co. TRIMAX(Adjacent) – Double Density
3 Favourite Safety Products. Waves Nile D/D
4 Favourite Safety Products. FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots,
full body safety uniform and belts, safety net etc. shall be issued and used as per the
job requirements. Safety helmet shall be of YELLOW COLOUR ONLY. Contractor
will procure safety shoes & safety helmet from a reputed company with at least
months’ guarantee and shall produce the guarantee certificate and IS standard
certificate to the safety department. Contractor should purchase safety shoes of
reputed brands. Safety shoes will be issued every year. IS certificate and guarantee
certificate must be obtained from the vendor and submitted to the Safety department.
Safety shoes should be heat, water, oil and chemical resistant, having an anti-
slippery sole of 15298- 2002 make.
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as
per work requirement. Contractor should ensure that their workers are wearing Safety
helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when they are at
work throughout the contract period. The contractor has to maintain the PPE issue
registers with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help
and treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of required
quality, GIPCL will issue the required PPEs to contract workers and back charge the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
same with 25% overhead charges of GIPCL, plus applicable GST as per extant GST
9. All lifting tools and tackles shall be duly certified by competent person in conformity
with the statutory requirements and certificate in form no. 10 as per rule 60 of Gujarat
Factories Rules, 1963 and section 29 of the Factories Act, 1948 shall be submitted
every year before using such tools and tackles. In case of purchase of new lifting
tools and tackles, form no. 10 as per the said rules shall be submitted before they are
taken into use. All lifting tools and tackles shall be of reputed make having
International manufacturing standard and shall be maintained in proper and workable
10. The Contractor shall nominate one Safety Officer with required qualification for
supervising the daily job/ shutdown jobs for observing and maintaining the safety
aspects at site. He is solely responsible for any safety measures during maintenance
work. He has to ensure that all the workmen working at site are equipped with
essential PPE’s and proper safety arrangement is made at the SLPP site.
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks,
D-shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered
for inspection with all above statutory test certificate before using at site for any work.
They should use all tools and tackles only after certification by GIPCL
representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile materials, full
body harness safety belt, ladders and crawling boards, fall arrester, etc. shall be used
to prevent accident. Further, during working on height, contractor should arrange
proper scaffolding of still pipes, safety net, full body safety belt, fall arrestor system
etc. Advice and instructions of engineer in charge/ safety in charge shall be strictly
complied with in this regard. All necessary safety precautions shall be taken by the
contractor to prevent accident and personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting torch,
on DA cylinders and on O2 cylinder. Cylinder caps also required for handling the
cylinders at the work at height area. Gas cylinders shall be transferred through gas
cylinder trolley only with cylinder cap and stored up right (vertical) position only. All
gas cylinders shall be hydro tested / certified as per gas cylinder rules 2004. Gas
cylinders shall be stored, handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested
as per Government approved RTO guidelines. All Vehicles must be parked in Parking
space designated by GIPCL. If any vehicle is found inside the plant premises other
than the parking area such vehicles shall be handed over to Security dept. and their
entry shall be cancelled for movement inside the plant premises with immediate
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools & equipments i.e. welding machine, grinding and drill machine etc. may be
checked by the electrical engineer of the contractors regularly, every six month at
least and report to be submitted to concerned HOD and safety depts.
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets
to prevent falling and spreading of sparks and hot material on and around the work
area. Contractor will procure and use such items. ELCB / RCCB shall be provided
with rating of 9-30 milli amperes on welding machine and all portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation form
(S-II) and near miss report within time limit as specified in forms, if any accident,
Incident, near miss occurred while working at SLPP site.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract jobs
and he will in close co ordination with safety officer of SLPP and attend all safety
related meeting such as safety committee, on job safety training etc. Where the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
contractual man power is less than 50, the site in charge of the contractor will act as
a safety officer and he will perform all the duties of safety officer as mentioned above.
19. No loose connection / joints allowed in electrical cables during performance of any
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A dept.
23. The Contractor shall comply all the new requirements related with safety as informed
by the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to explain the
principles behind safety practice. If the contract workmen fail to comply with safety
standards as per category A, B & C below, penalty shall be levied on the contractor
as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Working without helmet, Rs.100 /- per instant.
Related shoes, safety belt, gloves etc.
B WI Related Failure to adhere to HSE
guidelines/plans, careless • Rs.500 /- per
attitude in material instant.
Machine being used with
damaged machine guard, • After three
unsafe electrical work - incidence,
workout plug top/improper Per incidence
electrical joints/cables lying Rs.2500/-
on ground, electrical
equipment working without
proper earthing, machine • Continuous
being used without unsafe acts
machine guard, Welding will disqualify
machine without ELCB / the contractor
RCCB of proper rating, Gas from further
cylinder without test participation
certificate, Cylinder cap, in tender of
NRV / Flash back arrester, GIPCL-SLPP.
Cylinder trolley etc.
Unsafe working practices at
height more than 3 meters
Working without permit or
non-compliance with permit
conditions like hot work,
height work etc. as
applicable, lifting tools and
tackles being used without
third party inspection
certificates in form no. 9/10
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
as per Factory Act –
C Unsafe Breach of safe practices by Suspend the entry
Practices a particular person gate pass for one
repeatedly for three times. week.
After two suspensions
his gate pass will be
Penalty so levied against the contractors and company employees will be used during the
observation of National Safety Day.
The contractor, workmen following good safety practices in their work area
continuously will be rewarded / honored on National safety day.
15.1 GENERAL ELECTRICAL SAFETY RULES & REGULATIONS
Electrical safety
a. All the electrical apparatus including welding machine (either 3-phase or single
phase) should be provided with Earth Leakage Circuit Breaker (ELCB/RCCB/RCBO)
of 30mA rating.
b. Bidder/Contractor should ensure periodic checking of ELCB provided in their
electrical apparatus.
c. Bidder/Contractor should ensure that there should not be any joint in the power
supply cable of any machine. All cables should be in good condition with no bare
insulation or frayed wires
d. Any power supply switchboard/extension boards brought by Bidder/Contractor
should have ELCB of 30mA rating and it should have sockets along with 3-pin plug.
e. Any type of cable brought by Bidder/Contractor should not have any joint and should
be of sufficient capacity for the respective job.
f. Bidder/Contractor to bring their own 24V rating portable hand lamps along with cable
of (apparatus should be having 230V / 24V transformer) for the temporary lighting
arrangement required at site for the respective jobs.
g. Bidder/Contractor should bring sufficient quantity no. of temporary light fixtures (230V
or 24 V as per requirement of job/contract), extension boards, cables to draw supply
from nearest power point.
h. Hand-held and portable machines shall be equipped with a built-in switch to switch
off power in case of emergency
i. Bidder/Contractor to ensure healthiness of their electrical equipment whenever
brought to GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
j. Bidder/Contractor to ensure - All portable electric apparatus shall be regularly
examined, tested and maintained to ensure that the apparatus and leads are in good
k. Only three-core cable shall be used for single phase operated tools with the third core
connected to earth.
l. Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible.
Also, the metal work of the apparatus is effectively earthed.
m. All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
n. The earthing arrangements should be properly made with earthing clamps or a bolted
terminal while using any welding machine
o. Electric holders when not in use, should be placed on an insulated hook or the holders
should be fully insulated while using any welding machine
p. Whenever the welder stops or leaves work for any appreciable time, the power supply
to welding machine shall be effectively disconnected while using any welding
q. GIPCL will provide either single phase OR 3-phase 3 wire power supply from the
nearby point at job site. Bidder/Contractor to supply the required cable between
GIPCL power supply point to equipment brought by Bidder/Contractor for the
specified job. Further, if Bidder’s/Contractor’s equipment requires 3-ph 4 wire supply
then they should derive 3-ph 4 wire supply from GIPCL 3-ph 3 wire supply system by
incorporating sufficient capacity transformer. Like for hydro jet cleaning system, mixer
machine, induction heating machine, SR machine etc., GIPCL will provide 3-ph 3 wire
r. Cable between welding machine to GIPCL power supply point should have cable
TOP plug towards GIPCL power supply point of Make BALS having rating as 63 Amp.
Contractors not following above electrical safety points at any point of time are liable to
penalty and their machine/ apparatus shall be seized by GIPCL.
16. REJECTION OF WORK
If, as a result of inspection, examination or testing, the GIPCL’s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the GIPCL/Engineer/
GIPCL’s Representative may reject such plant, materials, work or workmanship and
shall notify the CONTRACTOR promptly, stating his reasons. The CONTRACTOR
shall then promptly make good the defect and ensure that the rejected item complies
with the Contract. If Contractor failed to rectify the rejected work or workmanship,
GIPCL/Engineer reserves the right to deduct or withhold amount against rejected
work or Workmanship. CONTRACTOR shall not entitle for any claim or release of
hold payment until rectify the defect up to satisfactory of GIPCL. If Contractor failed
to rectify any such defective work or workmanship, GIPCL reserve the right to rectify
at risk and cost of the CONTRACTOR and deducted by the GIPCL from any amount
due, or to become due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms and
conditions. If such rejection and retesting cause the GIPCL additional costs for the
traveling and lodging costs of GIPCL/Engineer’s personal for attending the retest,
such costs shall be recoverable from the CONTRACTOR by the GIPCL and may be
deducted by the GIPCL from any amount due, or to become due, to the
17. GENERAL TERMS AND CONDITIONS:
a. All tools & tackles, labours, equipments, materials (except free issue cement, and
as specifically mentioned in item nomenclature) as per contractor’s scope, etc…
to execute the contract are in the scope of the contractor. The contractor should
ensure that tools & equipments are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the contractor
for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take
suitable action.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
d. Contractor shall depute full time site experienced supervisor They shall co-
ordinate with GIPCL engineer and shall bear overall responsibility of contract
including joint measurement, billing etc. Such person shall function from site office
of contractor at SLPP.
e. Contractor shall also nominate one safety supervisor at site and shall submit
nomination of safety supervisor in writing before commencement of contract.
Safety supervisor shall arrange small safety talk on every day morning or
whenever required with all workers working under this contract. He shall
coordinate with concern department’s Engineer-in-charge on daily basis and
report daily observations, tool-box talk records etc. The work shall not be allowed
without deploying safety supervisor and a penalty equal to Rs. 1,000/- per day
absent of safety supervisor shall be levied from Contractor.
f. Contractor shall strictly follow the existing work permit system of the GIPCL as
applicable and any future revisions.
g. The contractor has to take EC insurance policy for their workmen. The contractor
has to submit labour license and PF account number to the Engineer-in-charge
before start the work.
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In
case of delay of work without any valid reason, the GIPCL reserves the rights to
carry out the work by deploying other agencies at the risk & cost of contractor
with additional 10% overhead charges.
i. Contractor shall mobilize the resources as per need within the period of four
hours. If the contractor fails to mobilize sufficient resources to complete the job in
time, GIPCL will execute the job through other agency at the risk and cost of the
contractor with additional 10% overhead charges.
j. Contractor should mobilize all resources for efficient & smooth execution of
contract within seven days from the date of issue of Letter of Intent/Work Order.
k. The prices / item rates quoted shall remain firm till completion of the contract and
any agreed extensions thereafter and shall not be subject to any escalation, idle
charges for labour, machinery, overhead expenses etc… due to any reason
whatsoever. No price escalation / idle charges shall be entertained due to delay
in work on unavailability of work front, non-issue of work permit, holding of work
permit for any reason, unavailability of contractor’s supervisor, unavailability of
contractor’s safety supervisor, violation of safety rules, unsafe act by any of
contractor’s worker, negligence & ignorance of safety & quality instructions of
GIPCL Engineer-in-charge or any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to
avoid hazards. Contractor shall arrange all standard adequate healthy safety
PPEs like but not limited to approved quality safety shoes & safety helmets,
standard dust masks, safety goggles, etc… as required and shall use exclusively
under this contract for all the time during working at specified locations failing
which, the Engineer-in-charge may hold the work and will take necessary action
including penalty as decided. If the contractor repeatedly violates safety
rules/regulations (more than three successive incidents), Engineer-in-charge may
take necessary action against the contractor, including appropriate financial
penalty (Maximum of Rs. 1,000/- per incident per man-day and as per clause no.
15) and/or termination of contract.
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activities and complete the jobs as per
the time given by and under the supervision of the Engineer-In-charge and shall
ensure that sufficient manpower is deployed for the same.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer In Charge for PTW (Permit to
work), work instruction, Return of permit whichever is required as applicable.
p. The contractor has to submit daily reports showing work carried out with details
of available manpower, tractors etc.
q. Any job other than the listed jobs in work order shall be executed by the contractor
on instruction from GIPCL and payment shall be made to the contractor on
respective item rate only.
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2, 2006. The Bidder shall confirm whether your organization is registered under
the Micro, Small and Medium Enterprises Development Act, 2006. If your
organization is registered under the Act, please specify the category i.e., Micro
Enterprise, Small Enterprise or Medium Enterprise under which it is registered
and kindly attach a copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc
of the respective State Government. It is to be noted that large scale industries
and trading firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001:2011 (EnMS)
certified company, and GIPCL gives extreme importance to maintain these global
standards. Contractor shall be required to observe these standards while working
with GIPCL. Contractor should ensure that his workmen/labour work in
accordance with them.
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a qualified
experienced site-in-charge of the works with adequate experience in handing of jobs
of this nature and with the prior approval of the GIPCL / ENGINEER. Such in-charge
shall be constantly in attendance at the site during working hours. During
CONTRACTOR’S supervisory engineer absence during working hours, if
unavoidable, and also beyond working hours, when it may be necessary to give
directions, orders may be given by the ENGINEER / GIPCL and shall be received
and obeyed by the CONTRACTOR’S superintendent or Foreman who may have
charge of the particular part of the work in reference to which orders are given. If
requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any
directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be
deemed to have been given to the CONTRACTOR. The representative of the
CONTRACTOR shall have all necessary powers to receive materials from the
GIPCL, issue valid receipts for the same, engage labour or purchase materials and
proceed with the work as required for speedy execution.
None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour
should be withdrawn from the work without due notice being given to the GIPCL /
ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL
/ ENGINEER such withdrawals will jeopardize the required pace of progress /
successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such persons
as area careful, skilled and experienced in their respective trades, and the GIPCL
shall be at liberty to object to and require the CONTRACTOR to remove any person
employed by the CONTRACTOR in or about execution of works who in the opinion
of the ENGINEER misconducts himself or is incompetent or negligent in the proper
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
performance of his duties and all such persons shall not again be employed upon the
works without the prior permission of the GIPCL.
Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or
employ any employee of the other party except by mutual consent.
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND
All loose materials, wastage, packing materials, cut pieces or other matter of an
offensive nature shall not be deposited on the surface, but shall at once be carted
away by the CONTRACTOR to some pit or place provided by him away from the site
of work and approved by local authorities.
As a part of the work included in this contract, the CONTRACTOR shall completely
remove and satisfactorily dispose of all temporary works to the extent directed. He
shall tear down and dispose of all temporary works, shall remove or grade, to the
extent directed, all plant and equipment, shall satisfactorily dispose off all rubbish
resulting from the operations under this contract and shall do all work necessary to
restore the territory embraced within the site of his operations to at least as good
order and conditions as at the beginning of the work under this contract.
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the site:
a. Electricity & water at nearest available one point. Further distribution to
be done by contractor at their cost.
b. Quarter(s) for supervisor/ engineers on chargeable basis in GIPCL’s
township at discretion of GIPCL if available.
c. Workshop facility as available at Plant premises only. However
contractor may visit the workshop to ensure the existing facility. For the
facilities other than available, contractor has to carry out the job outside
at their own cost.
d. First aid facilities as available on chargeable basis.
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen
regarding the safety norms and measures to be observed during work
operations at the colony/plant site.
21. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be
fully conversant with modern practices and should be able to carry out works
independently of work. The contractor shall therefore be required to engage
effective personnel to undertake the work as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records
and maintain the data.
c. All the work measurements shall be jointly recorded in a measurement
sheet/register/relevant documents by the contractor / authorized representative
of the contractor and the Engineer-in-charge. The measurements shall be clearly
written indicating date of measurement, location, reference to drawings, if any,
and jointly signed.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
d. The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis, the bill payment shall
be released based on the certified reports of the works.
e. Inspection of work will be done by Engineer-in-Charge or his authorized
representative. If the work is not found satisfactory Engineer-in-charge reserves
the right to take suitable action and shall be binding to the contractor.
22. BENEFIT PAYABLE IN CASE OF ACCIDENT OCCURRING OUTSIDE PREMISES
OR BEYOND THE COURSE OF EMPLOYMENT
The Contractor shall provide an insurance coverage (Medical + Death Benefit) for
sum of Rs. 01/-Lakh to all his workmen/labour deployed at GIPCL-SLPP site for the
accident taking place anywhere outside the Company premises or at any place when
the workman is not in course of his employment.
23. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the other
Party in writing of such conditions and the performance shall be suspended as per
mutual agreement.
For the purposes of this clause, ‘Force Majeure’ means an event beyond the control
of the Party and not foreseeable by the Party and shall include events of floods,
explosions, riots, wars, hurricane, epidemics, any other Act of God, quarantine
restrictions, terrorism, government actions and provided always that such acts result
in the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may sustain,
pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any
direction or order is issued by court at any point of time the contractor shall comply
with and implement such direction or order whether passed at the time of award of
contract or during the pendency of contract. Further, the Contractor shall indemnify
the GIPCL against all consequences arising and affecting GIPCL owing to the
compliance of the orders by the Contractor.
25. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the
Courts at Surat shall have jurisdiction regarding the same.
26. Where any portion of the General Condition of Contract is repugnant to or at variance
with any provisions of the Special Condition of Contract, then unless a different
intention appears, the provision of the Special Conditions of Contract shall prevail to
the extent of such repugnancy of variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
SPECIAL CONDITIONS OF CONTRACT
1. DETAIL SCOPE OF WORK
Civil, plumbing, sanitary and finishing works for renovation of the attached
toilets of 08 Ground Floor Guest Rooms and 01 First Floor Suite Room in the
VIP Block of Tapi Guest House and the Wash Basin Area including Ladies’
and Gents’ Toilets at Narmada Guest House.
The scope of work covered by this specification, in general, comprises.
1) Removing safely & stacking of C.P Fittings & Sanitaryware like EWC, Shower
Enclosure, wash basin, urinal, electrical fittings & fixture, Gyser etc as instructed
by Engineer in charge within colony premises.
2) Dismantling work for floor tiles, wall tiles, granite platform, Mirror, items using
labour / skilled worker or using breaker machine at all heights and depth including
storing and stacking the serviceable/ usable material and disposing of the derbies
and unwanted materials to outside colony or scrap yard in plant as directed by
engineer. Dismantling work execute in such a way using skilled person that
minimum damage to adjacent wall/structure.
3) Providing & laying 115 mm thick brick masonry walls in cement mortar 1:5 as
per the site requirement and using approved quality locally available red bricks,
including scaffolding wherever necessary, curing, raking joints, etc. complete
4) Plumbing work: Providing & fixing Plumbing work like fixing of CPVC pipe line
C.P Fittings & Fixture (like bib cock, Angle cock, pillar cock, hand faucet,
spreader etc), EWC with flush fixing, urinal fixing, shower & other accessories
fixing and as directed by Engineer in charge. The rate shall include all required
materials like various CPVC Fittings (brass/ ordinary) like elbow, tee, extension
nipple etc of required diameter, Teflon tape, water leakage testing, tools & tackles
etc.... The materials specifically CPVC Pipe. Fittings, Waste pipe & connector
pipe shall be as per make and specification given in SOR.
5) Providing, laying & fixing first quality floor/wall tiles in proper line & level at all
level in dado with base cement plaster 1:4 (1 cement : 4 fine sand) and necessary
approved quality chemical for fixing of tiles and including providing tiles joints
filling using approved shade & quality material etc.. all complete including cost of
labour, supervision, curing, all required materials (except cement), equipment’s,
tools and tackles etc., all complete as directed by Engineer-in-charge.
Note: only required cement shall be free issue from GIPCL store. All other
required materials like sand for plastering of base, white cement, chemical for
fixing tiles on wall, GIPCL approved quality joint filling material, etc. shall be in
contractor scope.
6) Providing waterproofing treatment to floors, walls and other wet areas using
approved waterproofing systems to prevent seepage and leakage.
7) Providing & laying granite in Window/Ventilation border area. The rate shall
include cutting, placing in line and level as per GIPCL approved quality and shed
including chemical for fixing, moulding, chamfer, polishing, cleaning, finishing of
granite in all respect etc. complete as directed by Engr. in charge.
Note: only required cement shall be free issue from GIPCL store. All other
required materials like white cement, chemical for fixing etc. shall be in contractor
8) Providing & laying granite of sandwich platform of black granite stone (Top granite
counter & resting on kota stone) as per details. The rate shall be including cutting,
placing in line and level, GIPCL approved quality chemical for fixing, moulding,
chamfer, polishing, cleaning, making grove on wall, also including fixing of wash
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
basin & making necessary opening for fixing basin & tap, jarries, cutting of stones,
testing of water seepage/leakage etc. complete as directed by Engr. in charge
Note: only required cement shall be free issue from GIPCL store. All other
required materials like white cement, chemical for fixing etc. shall be in contractor
9) Providing & fixing of 5 mm thick mirror as per approved make & size. The rate
shall be including wastage, necessary transportation, providing & fixing material
like adhesive, rivets etc as per direction of engineer in charge .
10) Providing and fixing WC, Washbasin, Plumbing fitting such like Bib Cock, Pillar
Cock, Stop Cock, Hand Faucet etc.. As per details specification given in SOR as
per approved quality and colour shed.
11) Rerouting of supply line network including cost of all civil & pluming work like
excavation, backfilling, providing & fixing required size UPVC/CPVC Pipes &
fittings, construction Brick chambers of require size, plastering & providing &
fixing covers over chamber etc. complete as per instruction of engineer in-charge.
12) Rerouting of drainage network including cost of all civil & pluming work like
excavation, backfilling, providing & fixing required size UPVC/CPVC Pipes &
fittings, construction Brick chambers of require size, plastering & providing &
fixing covers over chamber etc. complete as per instruction of engineer in-charge.
13) Providing and fixing in position Colour Anodized aluminum windows/ventilation
having sections As per details specification given in SOR as per approved quality
and colour shed.
14) Supply of Mason, carpenter, Labour with tools & Tackles.
It is not the intent to specify herein all the works in the scope of this contract. The
scope also includes all works necessary, which are not specifically mentioned here
but required, for completion of entire scope of work in all respect within time bound
period and are deemed to be included in the scope of the CONTRACTOR. All works
shall conform to the specification. The works shall conform to high standards of
quality and workmanship.
1.1 SPECIFIC REQUIREMENTS:
The scope of work includes; Civil, plumbing, sanitary and finishing works for
renovation of the attached toilets of 08 Ground Floor Guest Rooms and 01 First
Floor Suite Room in the VIP Block of Tapi Guest House and the Wash Basin Area
including Ladies’ and Gents’ Toilets at Narmada Guest House The work shall be
carried out as per requirement of company in presence of GIPCL representative
and as per instruction of Engineer-in-charge.
1) The work shall be complete in all respect to the satisfaction by GIPCL.
2) The contractor will have to assume full responsibility against any accident/injury/to or
death of their personnel while working at GIPCL site. GIPCL will not be responsible
for any such accident/injury/death either in terms of compensation or any other form
of liability. The contractor shall indemnify every member, officer and employees of
GIPCL. Also, the officer in charge and his staff against all actions, proceedings,
claims, demands, costs and expenses which may be made against the company due
to any failure by the contractor in the performance of his obligation under contract
3) Contractor will have to strictly follow all the safety rules and regulations of GIPCL
while working . All necessary safety equipment such as helmet, safety belt, hand
gloves, safety goggles, ear muff, mask on mouth etc. shall have to be arranged by
the contractor.
4) The contractor shall be responsible for making good to the satisfaction of GIPCL. Any
loss and damage to existing structure and properties belonging to the company, such
loss or damage is due to fault and/or the negligence or willful acts or omission of the
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
contractor, his employee, agents, representatives or sub contractor. In such cases
decision of engineer in charge will be final and binding on the contract.
5) GIPCL shall not pay any compensation for the idle man hours of contractor due to
change in schedule of jobs or due to work front given in two phases.
6) The price will remain firm throughout the execution of the order and shall not be
subjected to escalation for reason whatsoever. Applicable income tax at source shall
be deducted from your bills.
7) If contractor fails to commence/execute the work properly and within stipulated time,
GIPCL reserves the right to get completed the entire job or balance part thereof at
the risk and cost of contractor.
8) GIPCL reserves right to terminate the contract, either in full or part, at any time during
its tenure without assigning any reason thereof by giving a written advance notice of
9) Rates include all cost of labour, Material (except free issue) machinery, equipment,
safety gears, tools & tackles, etc.
10) Whenever any dispute arises regarding mode of measurement, the decision of the
Engineer-in-charge shall be final and binding on the contractor.
In case of any dispute arising out of this contract shall be subject to the Arbitration
of court of Surat or Baroda city only.
1.2 SAFE STORAGE OF MATERIALS
Contractor shall be responsible for safe storage of all materials to avoid pilferage,
loss, damage, theft and he shall be responsible till handing over.
1. All tools & tackles, materials, equipments, required vehicles to execute the
contract will be in the scope of the contractor. The contractor should ensure for
healthiness/working conditions of tools, tackles, equipments & vehicles.
2. The Contractor shall have to make necessary arrangement for storage of
materials including safe storage of materials, tools & tackles, equipments at their
3. All safety/PPEs required during work at site are to be arranged by the contractor.
4. The Contractor shall have to provide necessary facilities including
accommodation for their labour at their own cost.
5. The contractor has to arrange transportation for lifting/shifting the materials at
6. Contractor has to depute their supervisors during work execution as per
specification and for work planning & coordination with respective department’s
Engineer-in-charge to record Location wise joint work done reports, to prepare &
apply for manpower gate pass, to maintain statutory & legal compliance records,
7. Contractor has to maintain record of each and every material brought to site with
material test certificate and gate entry.
1.4 PLANNING & MONITORING OF WORK PROGRESS
1. After award of the work, Contractor has to submit schedule of work planning for
completion of work with resources (i.e. manpower and material) mobilization
planning within ten days.
2. Contractor shall mobilize the resources at site within 10 days from the date of LOI
or work order whichever is earlier. GIPCL will closely monitor the agreed schedule
against actual progress of work at site. If contractor failed to carry out work as per
agreed schedule and if contractor failed to mobilized required resources
(manpower & materials) within seven days from written communication, GIPCL
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
will execute the job through other agency at the risk and cost of the contractor
with additional 10% overhead charges.
2. PRICE & RATES
This is SoR based tender and final item rates will be derived based on final offered
lowest price received through e-Reverse Auction on gross total price (including 18%
GST). Prorata reduction will be applied in the quoted price for all the items of SoRs
after price discovery through e-Reverse Auction. The item rates so derived shall be
inclusive of cost of materials (except free issue cement, and as specifically mentioned
in item nomenclature), skilled and/or unskilled labour, supervisors, insurance, safety
PPEs, staging, shuttering & scaffolding, survey works, transportation, mobilization-
demobilization cost, loading-unloading & proper storage, security & safety,
equipment, machinery, consumables, all the required tools & tackles etc…, idle
charges of labours, operators, drivers, machineries, equipments during unavailability
of front or due to unavoidable circumstances or any reasons whatsoever, safety
equipments & PPEs, Royalties, Rents, Excise duty, Sales Tax, Stamp Duties, Central
or State Government or Local body or Municipal Taxes or Duties, Turn over Tax,
Work Contract Tax, VAT, Octroi duty and / or any other duty / tax ((Item rates are
without GST but GST @18% is considered in Total Estimated SoR Value ), levied by
the Central, State Government or other Public bodies etc…and such other costs that
are not specifically mentioned herein but will be incurred by the contractor for the
satisfactory and timely completion of the work. The whole item rates shall be deemed
to include for everything mentioned in the specification, all leads & lifts, contractor’s
overheads & profits for due performance of the work under this contract and such
other costs that are not specifically mentioned herein but will be incurred by the
contractor for the satisfactory and timely completion of the work. The rates shall also
include cost for mobilization / demobilization of manpower, equipments, materials,
etc... as per work requirement.
The rates shall be firm for entire contract period and also during extension thereof, if
required and shall not be subject to any escalation in prices, idle charges for labour,
machinery, overhead expenses etc. No price escalation / idle charges shall be due
to any reason whatsoever.
The prices / item rates so derived based on final recovery of lowest offer from Bidder
shall remain firm till completion of the contract period and any agreed extensions
thereafter and shall not be subject to any other escalation, idle charges for labour,
machinery, equipments, overhead expenses etc. No price escalation / idle charges
shall be payable due to delay in work by contractor or due to non-availability of work
front by GIPCL or any reason whatsoever.
Contractor shall at his expense comply with all labour and industrial laws and such
other acts and statutes as amended from time to time as may be applicable to this
contract in respect to pay etc. On account of any default in respect of all liabilities and
in case of non compliance of the above, the company can withhold their payments till
all legal liabilities are discharged.
The offer price shall be considering mobilization of all required manpower, tools &
tackles, materials, equipment, vehicles, consumables, etc… for timely and
satisfactory completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon
day to day requirement. However, item rates remains unchanged and the payment
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
shall be made as per the actual quantity executed as informed & certified by GIPCL
representatives.
3. CONTRACT PERIOD
Contract period will be 04 (Four) months from the date of commencement
(mobilization period will be 10 days from the date of issue of LoI or Work Order
whichever earlier) or from the date of commencement as mentioned in work order.
The work should be carried out in two phases. The given work of first phase should
be completed in One & half month from date of award of work. The second phase
work front will be given only after completion of 1st phase work and handover of the
given 1st phase work.
In any case, contractor shall not be eligible to claim any compensation or
reimbursement or price escalation which attributed to poor progress, poor quality
work, re-work, holding the work by GIPCL in sack of decision or modification in
proposed scope or due to any whatsoever reason.
Contractor shall not have any right for time extension or compensation or price
escalation on account of delay due to late handing over of particular front by the
GIPCL or any other reason whatsoever. However, GIPCL at its sole discretion may
grant time extension only against the justifications submitted by the contractor in
GIPCL reserve the right to short close the contract at any time by giving one month
notice period without assigning any reason and without any compensation.
In order to complete the works timely as per approved completion schedule,
contractor shall mobilize sufficient nos. of manpower & required material, resources,
tools & tackles etc at locations simultaneously, including independent site
GIPCL reserves the right to extend the Contract Period appropriately for additional
period of 03 (Three) months at the same rates, terms and conditions without any price
escalation and without entering into any new contract
4. TERMS OF PAYMENT
The contractor shall raise running invoice/final bill in duplicate (one original in physical
form and soft copy in MS Excel format as directed by Engineer-in-charge) for work
performed or completed during the previous month along with the documents as
mentioned hereinafter. On receipt of the invoice complete in all respects and with all
the said documents, the payment in respect of the same shall be made within
days of such receipt of a complete invoice as per the following terms of payment:
(i) 100% of monthly RA bill along with 100% taxes shall be released against the
work executed duly certified by GIPCL. Income Tax (IT) will be deducted at
source from monthly RA bills as per the rules in force.
(ii) Security deposit at 10% of contract value shall be submitted as per clause
no.: 1 of Section-C. Security deposit will be returned to the Contractor without
any interest after successful completion of retention period from actual
contract completion date as certified by Engineer-in-charge as per clause no.:
1 of Section-C.
(iii) GST shall be paid along with bills after fulfillment of following terms.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
(a) Submission of copy of registration certificate issued by GST Authority (to
be furnished only once).
(b) Citing the GST Registration no., HSN Code and the date of issue of
registration certificate on invoices.
(c) Citing GIPCL’s GST no. along with contractor’s GST registration no. and
the date of issue of registration certificate on invoices.
(d) Claim of GST amount with percentage (%) separately shown on the
(e) The contractor shall be required to submit the proof of payment of GST
of previous month/quarter, as may be applicable as & when demanded
by GIPCL/Owner/company.
(f) Contractor shall inform the GIPCL in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(g) The contractor shall also mention on their invoice the HSN/SAC code as
applicable under the GST laws under which GST is levied and a self-
certified authentic third-party evidence (www.cbic-gst.gov.in) shall be
adduced to that effect by the contractor.
(iv) The Contractor shall submit his Final Bill within a period of three months of
the expiration or earlier termination of the contract or any extensions that may
be granted by GIPCL to the Contractor. GIPCL shall not entertain any bill for
any work item after expiration of period of three months.
(v) The Contractor shall include all his claims in the Final Bill submitted by him
and accordingly the final bill submitted by the Contractor shall be deemed to
be inclusive of all and whatsoever the claims that the Contractor may have
from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to have
waived any claims not mentioned in the Final Bill and shall not be entitled to
recover the same from GIPCL subsequent to the submission of the Final Bill
on any account and GIPCL shall stand absolved of all its liabilities in respect
of any such claims not raised by the Contractor in his Final Bill.
The rates shall be valid for the Contract Period and agreed extension and shall
remain unaltered during the Contract Period.
5. SCOPE OF GIPCL
Available Electric power, water shall be provided free of charges at any one point
nearer to work site as convenient to GIPCL. Contractor shall make his own
arrangements for drawl and distribution to the work site. However, before drawl of
such energy, contractor shall take prior permission of the same.
However, due to unavoidable circumstances or any other reason whatsoever, on
unavailability of power supply or water, contractor shall proceed with the scope of
work by making own alternate arrangements without any extra cost to GIPCL. GIPCL
will not be held responsible for the delay, interruption or denying for power supply
and water due to any reason whatsoever.
1) FREE ISSUE MATERIAL:
Cement shall be provided free of cost by GIPCL Store, however, necessary
transportation, loading, unloading shall be in the contractor’s scope.
Note: Contractor should take extreme care of GIPCL free issue material to avoid
possible wastage, and also to keep in safe place for avoiding theft. Contractor
also deliver highest quality of work. In case of any rework needs to be carried
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
out due to poor quality/mishandling of free issue material by contractor, they
will be liable to procure same at his own risk & cost. if contractor fail to arrange
materials, GIPCL will procure the same & deduct the amount from contractor’s
6. TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by the acts
of the GIPCL, or if defects not readily detected by proper inspection shall develop
before the final completion and acceptance of the whole work, the CONTRACTOR
shall forthwith make good, without compensation, such damage or defects in a
manner satisfactory to the ENGINEER / GIPCL. In no case shall defective or
imperfect work be retained even if contractor followed all technical specifications.
GIPCL will not compromise for quality of materials, works & workmanship. The
CONTRACTOR shall remain liable under the provisions of this clause
notwithstanding the passing by the GIPCL of any certificate, final or otherwise or the
passing of any accounts.
7. DAILY DIARY AND PROGRESS REPORT
A daily diary register will be kept in the ENGINEER’S office. The CONTRACTOR will
supply all detailed information every day at 9:00 hours for the day preceding and the
diary will be jointly signed by the ENGINEER and the CONTRACTOR’S
representatives, every day in token of its correctness. A works instruction book,
serially numbered will also be kept in the ENGINEER’S office and all day to day
instructions will be given in that book. The CONTRACTOR’S representative shall
report every day to see these instructions and sign them at the bottom in token of his
having seen them.
The CONTRACTOR shall supply all information regarding procurement of materials
and progress of work, as is required by the ENGINEER for compiling the weekly
progress reports. This information shall be supplied by 9:00 hours on every Monday,
for the preceding week.
8. JOINT VERIFICATION OF WORK & MODE OF MEASUREMENT
Actual treated locations as per scope shall be inspected jointly with GIPCL’s
Engineer-in-charge concern and contractor’s representative. The payment will be
done according to actual execution as per joint verification & certification by
contractor & GIPCL Engineer-in-charge as per mode of measurement.
The payment will be done according to actual work carried out as per joint
measurement by contractor & GIPCL Engineer-in-charge for the executed work as
per item nomenclature & specified unit of measurement up to three decimal places.
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer in-charge shall be final and binding to contractor.
9. SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for verification
purpose of the bill:-
(i) Joint record of work done in the form of joint inspection report duly signed by
authorized representatives of contractor and GIPCL.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
(ii) Contractor’s material incoming challans duly stamped & signed by plant gate
(iii) Contractor’s supplied material test certificate/reports/MSDS/TDS as directed
by Engineer-in-charge if required.
The bill will not be entertained without submission of above documents.
10. SUBMISSION OF STATUTORY COMPLIANCES WITH FINAL BILL
Contractor shall submit each Final bill of work carried out along with following
(i) Written undertaking of site clearance with final bill.
(ii) Notarized Indemnity Bond in case of Final bill.
(iii) No claim - No arbitration certificate as per Performa (Annexure-D), after
releasing final bill payment.
Bill submitted without any of the above documents shall not be processed for
11. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 10 days from the time of
intimation given by GIPCL.
b) Contractor shall provide sufficient manpower, materials, tools & tackles, etc…
for execution of job in specified time with respect to quality, specifications, site
preparations, safety, co ordination with GIPCL, issue of work permits, joint
verification, etc... The contractor’s person/s shall coordinate with the
Engineer-in-charge of GIPCL for proper execution of the job.
c) The resources required for execution of above jobs will vary from time to time,
hence contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him for
the work at his own cost.
12. FREE ISSUE MATERIALS BY GIPCL
The rates are with free issue of cement and Fly ash/Bed ash and if specifically
mentioned free issue in item nomenclature of SoR. All free issue materials shall be
issued either from GIPCL store or storage area or silo area on specific request by
contractor. Necessary transportation of free issue material is in the scope of
contractor except Bed Material.
cement shall be issued in no. of 50 kg bags from GIPCL store. The reconciliation of
free issue material shall be done as under:-
i. The contractor shall keep an up to date record of the materials issued by
GIPCL and consumed on the work, in daily register. The contractor shall also
submit weekly statements for actual consumption of such materials and stock
position with him. The actual consumption shall be calculated based on
theoretical quantities worked out by engineer or as jointly recorded
measurements on site.
ii. The recovery of cement, the recovery shall be affected at the rate of Rs. 350/-
per bag or at market rate, whichever higher for quantities above theoretical
consumption. No unaccountable wastage will be allowed.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
13. QUANTITY OF WORK
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may vary up to any extent based on actual requirements
& maintenance requirements as directed by Engineer-in-charge. Contractor shall not
be entitled for any compensation on ground of such alteration in given estimated
quantities within overall limits of awarded contract price. GIPCL reserves the right to
operate or increase/decrease quantities in each item or omit any item included in
Schedule of Quantity at its discretion. Contractor shall have no claim, whatsoever, on
grounds of loss of anticipated profit etc. on account of the same.
14. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith. Bidders
are advised to go through the same.
Where any portion of the general conditions of contract is repugnant to or at variance
with any provisions of the special conditions of contract, then unless a different
intention appears, the provision of the special conditions of contract shall prevail to
the extent of such repugnancy of variance.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sub. :- SoR for Renovation of Attached Toilets of Guest House Rooms in VIP Block
at Tapi Guest House
Sr. Estimate Estimate Amount
Item Details Unit Estimate
1 Dismantling work shall include working at all 260.00 M2 103.63
heights and depth including storing and stacking
the serviceable and depth including storing and
stacking the serviceable material and disposing
of the debris and unserviceable material outside
Plant premises or scrap yard in colony as
directed by Engineer for All types of floor/dedo
like ceramic/ glazed/vitrified tiles etc..
2 As above item but for Chipping plaster of any 220.00 M2 103.63
3 Dismantling work shall include working at all 3.50 M3 1042.23
heights and depth including storing and stacking
the serviceable and depth including storing and
stacking the serviceable material and disposing
of the debris and unserviceable material outside
Plant premises or scrap yard in colony as
directed by Engineer for P.C.C. of any mix
4 Dismantling of Brick masonry work in Cement 30.00 M3 428.66
mortar with plaster
5 Removal of doors, Ventilation (Steel, Aluminium, 20.00 M2 353.30
PVC or wooden), etc. with or without frame as
directed by Engineer-in-charge.
6 Removal of Indian or European W.C., Wash 36.00 No 520.53
basins, Nahni trap & similar fittings.
7 Earthwork in excavation below ground level in 40.00 M3 179.94
foundation, trenches, pits, drains, chambers,
etc. in all class of soil except hard rock including
dewatering, shoring, strutting, if necessary,
dressing of the sides and bottom, stacking of
useful materials as required, back filling with
selected excavated materials, compacting the
back filling, removing of surplus earth after back
filling outside premises at suitable location within
lead of 3.0 kms. etc. complete as directed by
8 Filling fly ash/bed ash under floors, in 30.00 M3 122.48
foundations, plinths etc. including spreading in
layers of avg. 20 cm loose thickness at all
depths, watering, consolidation, dressing and
levelling, etc. complete. (Fly ash of required
quantity shall be supplied at work site on specific
request and the remained/unused quantity of fly
ash shall be removed from site.)
9 Providing & laying plain cement concrete 1:4:8 10.00 M3 2787.11
with 20 mm down graded stone aggregates in
foundations, floors, etc. including tamping,
curing, shuttering the edges, at all dept &
thickness etc. complete.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Amount
Item Details Unit Estimate
10 Providing & laying brick masonry of 230/345/450 10.00 M3 5533.58
mm thick and above in cement mortar 1:5 using
ISI marked standard red bricks, including
scaffolding wherever necessary, curing, raking
joints, etc. complete as per specifications
11 Providing & laying 115 mm thick brick masonry 40.00 M2 775.86
walls in cement mortar 1:5 including providing
RCC mullions and transoms as shown on the
drawings or as specified using ISI marked
standard red bricks, including scaffolding
wherever necessary, curing, raking joints, etc.
complete (reinforcement, shuttering and
concrete of transoms and mullions will be
measured and paid for separately).
12 Providing smooth cement plaster avg. 13 mm 230.00 M2 192.14
thick in cement mortar 1:4 for RCC, brick work
including scaffolding, curing, etc., complete as
per specifications.
13 Providing and laying in required size vitrified 260.00 M2 1001.37
tiles of Nitco, Kajaria, Johnson, Somani, Bell,
Asian or Euro make or its equivant quality of
approved plain shade in floor/dedo laid on
25mm (average) base of cement mortar 1:4
(1cement : 4 coarse sand), cutting chase in walls
as required including pointing of the joints with
white cement mixed with colour pigment to
match, curing etc.. Complete in floors/dedos.
(Basic Rate : Rs 700 per S.M.)
14 Providing & fixing in position 'HINDUSTAN' 9.00 No 7514.00
'CERA' or its equivalent first quality white glazed
vitreous china clay WC with 'P' or 'S' trap as
required including cutting the wall, floor, if
required and making good the same, jointing
inlet & outlet connections, etc. complete as
directed by Engr for the following:
EUROPEAN' type WC pan-580 mm size with
plastic seat cover (Basic Rate Rs. 6000/-)
15 Providing & fixing white glazed vitreous China 9.00 No 3014.92
clay HINDUSTAN' 'CERA' or its equivalent first
quality wash hand basin of 550mm x 400mm
size with CI brackets including grouting the C.I.
bracket in wall with cement concrete, jointing
inlet & outlet connections, etc. complete as
directed. Basic rate of wash basin Rs. 1,800/-
16 Providing & fixing C P heavy duty bottle trap 9.00 No 1479.04
Jaquar make (Basic rate Rs. 1,000/-)
17 Providing & fixing Reinforced PVC inlet pipe up 9.00 No 179.30
to 600mm long (Basic rate Rs. 85/-)
18 Providing & fixing Jaquar or equivalent approved 9.00 No 334.70
CP brass waste coupling for wash basins and
sinks (heavy duty) 32 mm dia including
removing old coupling, etc. complete. (Basic
price Rs. 250/-)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Amount
Item Details Unit Estimate
19 Providing & fixing 150 mm square heavy duty 18.00 No 334.70
stainless steel jali of approved quality on floor
trap including removing of existing jali, chipping
and making good the same, etc. complete. Basic
price Rs. 250/-.
20 Providing & Fixing Jaquar approved quality 9.00 No 880.12
make fixtures (fusion fusion series) of Bib Cock
with Wall Flange 1/2" dia,(15 mm) including
fixing of new fittings with Teflon or hold tight,
removing of existing fixtures, etc.
complete(Basic rate Rs. 625/-)
21 Providing & Fixing Jaquar approved quality 9.00 No 880.12
make fixtures of Pillar Tap 1/2" dia,(15 mm)
(fusion series ) including fixing of new fittings
with taflon or hold tight, removing of existing
fixtures, etc. complete(Basic rate Rs. 620/-)
22 Providing & Fixing Jaquar approved quality 18.00 No 782.73
make fixtures of Angular Stop Cock (fusion
series) with Wall Flange 1/2" dia,(15 mm)
including fixing of new fittings with Teflon or hold
tight, removing of existing fixtures, etc.
complete(Basic rate Rs. 540/-)
23 Providing & Fixing Jaquar approved quality 9.00 No 3614.22
make fixtures of Hot & Cold wall mixer with CP
offset for overhead shower 1/2" dia,(15 mm)
(fusion series) including fixing of new fittings with
Teflon or hold tight, removing of existing fixtures,
etc. complete(Basic rate Rs. 2900/-)
24 Providing & Fixing Jaquar approved quality 9.00 No 629.35
make fixtures of C P Shower (fusion series) with
wall flange 1/2" dia,(15 mm) including fixing of
new fittings with Teflon or hold tight, removing of
existing fixtures, etc. complex(Basic rate
25 Providing & fixing 25 mm dia CP brass 'Crown' 9.00 No 1301.31
L & K 'Jaquar or its equivalent quality heavy duty
push type flush cock including breaking of wall/
tiles, if required, making good the same,
removing of existing fixtures, etc. complete for
26 Providing & fixing approved quality heavy duty 18.00 No 467.75
75 mm dia. Nahni trap including fixing with
jointing, testing, etc. complete.
27 Providing & fixing CP brass L&K, crown, prince 9.00 No 657.45
or Equivalent fixtures of 1/2" dia,(15 mm)
including fixing of new fittings with Teflon or hold
tight, removing of existing fixtures, etc. complete
for the following:
a) Stop Cock (Basic rate Rs. 450/-)
Providing & Fixing CPVC pipes SDR-13.5 250.00 M 170.22
confirming to IS:15778 of Prince/Supreme/Astral
make for domestic water supply including
cutting, making threads at all floor levels
including fixtures like bends, tees, shoe, elbow,
28 union, nipple etc joined with IPS WELD ON
solvent cement or equivalent resin of approved
brand & manufacture etc. complete for opened
1) Up to 20 mm dia (Basic rate Rs. 94/- per M):
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Amount
Item Details Unit Estimate
29 2) Same as per item no-28 but for Up to 25 mm 175.00 M 329.89
dia (Basic rate Rs. 150/- per M)
30 3) Same as per item no-28 but for Up to 40 mm 50.00 M 457.84
dia (Basic rate Rs. 340/- per M)
31 4) Same as per item no-28 but for Up to 50 mm 75.00 M 801.00
dia (Basic price Rs. 550/- per M)
32 Providing & Fixing UPVC pipes SCH 40 as per 100.00 M 133.94
ASTM D 1785 and ASTM D -2466 of
Prince/Supreme/Astral make for domestic water
supply including cutting, making threads at all
floor levels including fixtures like bends, tees,
shoe, elbow, union, nipple etc joined with IPS
WELD ON solvent cement or equivalent resin of
approved brand & manufacture etc. complete for
1) Up to 20 mm dia (Basic price Rs. 55/- per M)
33 2) Same as per item no-32 but for Up to 25 mm 60.00 M 141.21
dia (Basic price Rs.85/- per M)
34 3) Same as per item no-32 but for Up to 40 mm 50.00 M 272.68
dia (Basic price Rs. 140/- per M)
35 4) Same as per item no-32 but for Up to 50 mm 75.00 M 346.94
dia (Basic price Rs. 185/- per M)
36 5) Same as per item no-32 but for Up to 75 mm 40.00 M 699.96
dia (Basic price Rs. 390/- per M)
37 Providing & fixing approved quality heavy duty 50.00 M 197.21
50 mm dia. Rigid PVC pipes & fittings of Prince
/ Supreme or its equivalent quality including
fixing with clamps, jointing, testing, etc.
a) Pipes (Basic price Rs. 100/- per M)
38 b) Same as per item no-37 but for Fittings such 30.00 No 121.73
as elbow, tee, coupling, reducer, etc. (Basic
39 Providing & fixing approved quality heavy duty 50.00 M 227.64
75 mm dia. Rigid PVC pipes & fittings of Prince
/ Supreme or its equivalent quality including
fixing with clamps, jointing, testing, etc.
a) Pipes (Basic price Rs. 120/- per M)
40 b) Same as per item no-39 but for Fittings such 40.00 No 133.91
as elbow, tee, coupling, reducer, etc. (Basic
price Rs. 95/-)
41 Providing & fixing approved quality heavy duty 60.00 M 355.46
110 mm dia. Rigid PVC pipes & fittings of Prince
/ Supreme or its equivalent quality including
fixing with clamps, jointing, testing, etc.
a) Pipes (Basic price Rs. 225/- per M)
42 b) Same as per item no-41 but for Fittings such 25.00 No 158.25
as elbow, tee, coupling, reducer, etc. (Basic
price Rs. 115/-)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Amount
Item Details Unit Estimate
43 Providing & fixing Cera or equivalent make 9.00 No 1040.81
chrome polished ABS health faucet set with
standard accessories like flexible hose
(minimum 1.00 meter) & wall hook including
fixing of new fittings with Teflon or hold tight,
removing of existing fixtures, etc. complete.
(Basic rate Rs.700/-).
44 Providing & fixing approved quality C.P. brass 9.00 No 793.69
towel road of 20 mm dia x 600 mm long including
C.P. brass 'brackets, fixed with wooden cleats
and CP brass screws, etc. complete.
45 Providing & fixing superior quality stainless steel 9.00 No 959.25
soap dispenser (500ml) with high quality ABS
pump & CP brass screws, etc. complete. As
46 Providing &Fixing CP Double coat hook with 9.00 No 752.30
necessary screws etc. complete.
47 Providing & Fixing approved quality CP Toilet 9.00 No 1027.42
48 Providing & fixing mirror of Gold fish, Atul Modi 9.00 No 1314.19
or equivalent quality mirror glass of size nearly
too 550 x 400 x 5 mm thick with 6 mm thick
marine plywood/ pvc sheet / cement sheet back
including or without PVC frame, hook for fixing
on wall, with necessary rawal plugs, screws, etc.
complete with all labour and materials. In case
of other than rectangular shape, long dimension
should be nearly matched. Basic cost of mirror
shall be Rs. 950/-.
49 Providing and fixing in position Colour Anodize 18.00 M2 7900.00
aluminium windows having sections of Jindal,
Narmada, Banco or equivalent make having
section with three track. Pipe Frame section
Size 4''x1'' with colour Anodize. 5mm thk. Clear
Plain Glass. Aluminium Section and Pipe Frame
18 Gauge. Section Series 3/4''
(Handle/Interlock/Top-Bottom 3/4''x1.5'').
Mosquito net etc.., PVC track gasket, EPDM
rubber gasket on glass of weather tightening
along with locks, handle including sealing gap
with existing wall faces with silicon sealants
making it water proof in all manner, etc.
complete at all floor levels. For other than above
section as per site requirements & directed,
payment will be on prorata basis as informed by
Engineer-in-charge. Sliding type
50 Providing and fixing in position Colour anodize 9.00 No 4700.00
coated aluminium louvered glass ventilators of
adjustable type including with frames having
Pipe section 2.5''x1.5'' of 18 Guage Make Jindal
or equivalent make with fixing 4 mm thick bajri /
clear glass making frame and glass water tight,
making it good, Space for Exhust Fan etc.
complete at all floor levels.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Amount
Item Details Unit Estimate
51 Providing & fixing MS GRILLS or MS gratings of 600.00 Kg 141.21
required pattern to window jams/ brick wall,
platform, drain cover, etc.. with flats at required
spacing and frame all round of square or round
openings with round headed bolts and nuts or by
screw or welding including applying two coats of
red oxide primer all complete as directed by
engineer in charge
52 waterproofing treatment to sunk surface at all 40.00 M2 675.61
elevations & locations using approved quality
chemicals including cleaning the surfaces with
wire brush, removing of all dirt, dust to receive
further treatment, application with brush/ spray
as per manufacturer's instructions with all
materials, labour & scaffolding, etc. for the
following: (Use Sika/Dr.fixit or equivalent
product as approved) Crack filling &
waterproofing coating on existing surface,
inclusive of chipping of existing surface, bond/
primer coat, disposal of debris etc. No separate
measurement for crack repairs.
53 Providing & laying black/green granite of 28.00 M2 2577.89
approved quality including cutting, placing in line
and level on 20mm thk. CM 1:3 bedding and
cement paste, filling the joints with approved
colour cement, cleaning, finishing in all respect,
etc. complete as directed by Engr. in charge.
(Basic rate of granite Rs.170 / Sq.ft.)
54 Providing and fixing in position Prince Make- 10.00 No 6380.51
(DURAFIT) Manhole covers for 05 metric Ton
capacity chambers (a)
size 0.600m x 0.600m
55 Providing & fixing 30mm thick commercial flush 16.50 M2 4156.59
door shutters with existing door frame including
providing 6 Nos. of hold fasts fixed in 'concrete
block (M-15) for make heavy duty hinges, Iron
oxidised fixtures like handles, aldrops stoppers,
pagstays, etc. including teakwood edge lipping,
etc. with two or more coats of synthetic enamel
paint of approved make and shade over a coat
of primer, 'etc. complete as per design.
56 Providing, supplying & applying standard 1.5mm 16.50 M2 2534.96
thick single piece approved make, color &
shade laminate of basic rate Rs. 490/- per M2 on
shutter, which includes removing the
doors/partitions, cleaning & necessary
roughening the surface for proper bonding of
new laminate, fixing the full size single piece
laminate with approved adhesive, ensuring zero
air entrapping, refixing the door/partition in
proper alignment for smooth operation with new
fasteners, new SS hinges, including removing &
refixing door closures, name plates, door
stoppers, etc... whichever necessary.
57 Cutting zari up to 50mm x 50mm with cutting 350.00 M 78.91
machine / manually in brick masonry wall for
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Amount
Item Details Unit Estimate
58 Making Connection to the Existing inspection 3.00 No 681.04
Chamber By making hole in Brick wall
59 Closing of openings, holes, openings, etc. with 30.00 No 95.63
bricks /cement concrete as per instructions of
engineer with both side plastering, shuttering,
etc. complete for areas of normal approach ( up
to 5.0m. Height) and for hole size up to 0.10 m2.
60 Removing of various pipe lines GI/PVC/UPVC 9.00 Day 616.52
pipe etc..Fittings as directed by Site Incharge
supply of Plumber for 08 Hrs
61 Labour Supply for 08 Hrs 9.00 Day 489.19
62 Supply of Carpenter for 08 Hrs 9.00 Day 668.01
63 Supply of Mason for 08 Hrs 5.00 Day 770.78
Total Amount (Rs.)
Total Amount (Rs.)
GST Amount @ 18% (Rs.)
Total Amount with 18% GST (Rs.)
Total Amount with 18% GST (Rs.)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sub: Renovation for Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House
Sr. Estimate Estimate Estimate
Item Description Unit
Qty Rate Amount (Rs.)
1 Dismantling work shall include working at all 110.00 M2 103.63
heights and depth including storing and
stacking the serviceable and depth including
storing and stacking the serviceable material
and disposing of the debris and unserviceable
material outside Plant premises or scrap yard
in Plant as directed by Engineer for All type of
floor/dado like ceramic / glazed / vitrified tiles
/ kota stone / marble / granite etc.
2 As above item but for Chipping plaster of any 90.00 M2 103.63
3 Removal of Aluminum partitions fully paneled 15.00 M2 353.3
/ partly glazed / double skin , Alum. Doors,
Windows, etc. as directed by Engineer-in-
charge for repairing, modification or
4 Removing of various pipe lines GI/PVC/UPVC 35.00 M 61.24
pipe up to & incl. 50 mm dia. From
wall/floor/soil
5 Removing of various pipe lines GI, PVC, CI, 25.00 M 103.63
SW, AC, pipelines more than 50mm dia. &
incl. 150 mm dia. From wall/floor.soil
6 Removing of Indian or European 22.00 No. 520.53
W.C.,Urinals, Wash basins, Nahni trap &
similar fittings.
7 Providing & laying plain cement concrete 1.00 M3 2787.77
1:4:8 with 20 mm down graded stone
aggregates in foundations, floors, etc.
including tamping, curing, shuttering the
edges, at all dept & thickness etc. complete.
8 Providing & laying 115 mm thick brick 10.00 M2 775.86
masonry walls in cement mortar 1:5 including
providing RCC mullions and transoms as
shown on the drawings or as specified using
ISI marked standard red bricks, including
scaffolding wherever necessary, curing,
raking joints, etc. complete (reinforcement,
shuttering and concrete of transoms and
mullions will be measured and paid for
separately). 0.00m. to 5.0m.
9 Providing smooth cement plaster avg. 13 mm 90.00 M2 192.14
thick in cement mortar 1:4 for RCC, brick work
including scaffolding, curing, etc., complete as
per specifications.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Estimate
Item Description Unit
Qty Rate Amount (Rs.)
10 Providing and laying in required size vitrified 110.00 M2 1001.37
tiles of Nitco, Kajaria, Johnson, Somani, Bell,
Asian or Euro make or its equivant quality of
approved plain shade in floor/dedo laid on
25mm (average) base of cement mortar 1:4
(1cement : 4 coarse sand), cutting chase in
walls as required including pointing of the
joints with white cement mixed with colour
pigment to match, curing etc..complete in
floors/dedos. (Basic Rate : Rs 700 per S.M.)
11 Providing & laying black/green granite of 8.00 M2 2577.89
approved quality including cutting, placing in
line and level on avg. 20mm thk. CM 1:3
bedding and cement paste, filling the joints
with approved colour cement, cleaning,
finishing in all respect, etc. complete as
directed by Engr. in charge. (Basic rate of
granite Rs.150 / Sq.ft.)
12 Providing & fixing of sandwich platform of 10.00 M2 11000
black granite stone (Top granite counter &
resting on kota stone) as per drawing. The
rate shall including materials, cutting, placing
in line and level, GIPCL approved quality
chemical for fixing, moulding, chamfer,
polishing, cleaning, making grove on wall,
fixing of 4" front Patti of granite platform & 3"
vertical patti on support kota stone edge, also
including making necessary opening for fixing
wash basin & tap, jarries, cutting of stones etc.
complete as directed by Engr. in charge.
Note: only required quantity of cement shall
be free issue from GIPCL store. All other
required materials like white cement,
chemical for fixing etc. shall be in contractor
13 Providing & fixing in position 'HINDUSTAN' 2.00 No. 7514
'CERA' or its equivalent first quality white
glazed vitreous china clay WC pan with 'P' or
'S' trap as required including cutting the wall,
floor, if required and making good the same,
jointing inlet & outlet connections, etc.
complete as directed by Engr for the following:
EUROPEAN' type WC pan-580 mm size with
plastic seat cover (Basic Rate Rs. 6000/-)
14 Providing & fixing PVC flushing tank of 2.00 No. 1314
champion or its equivalent quality with
necessary fittings, etc. complete (basic price
15 Providing & fixing white glazed vitreous China 7.00 No. 3014.92
clay HINDUSTAN' 'CERA' or its equivalent
first quality oval shape wash hand basin
including jointing inlet & outlet connections,
fixing in sandwich platform, etc. complete as
directed. Size dicided by GIPCL Engineer in
chargeBasic rate of wash basin Rs. 2,000/-
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Estimate
Item Description Unit
Qty Rate Amount (Rs.)
16 Providing & fixing white glazed flat back 2.00 No. 2151.66
urinals HINDUSTAN' 'CERA' or its equivalent
first quality of 465 x 365 x 265 mm size
including CI brackets, fixing with screws in
wall, inlet, outlet connections, etc. completed.
Basic rate of Urinal Rs. 1200/-
17 Providing & fixing approved quality heavy duty 6.00 No. 467.45
75 mm dia. Nahni trap including fixing with
jointing, testing, etc. complete.
18 Providindg & Fixing Jaquar approved quality 3.00 No. 880.12
make fixtures of Bib Cock with Wall Flange
(Basic rate Rs. 625/-)
19 Providindg & Fixing Jaquar approved quality 7.00 No. 1707.90
make fixtures of Press metric Pillar cock
(Basic rate Rs. 1300/-)
20 Providindg & Fixing Jaquar approved quality 20.00 No. 782.74
make fixtures of Angular Stop Cock with Wall
Flange (Basic rate Rs. 540/-)
21 Providing & fixing mirror of Gold fish, Atul 7.00 No. 1247.76
Modi or equivalent quality mirror glass of size
nearly too 550 x 400 x 5 mm thick with fixing
material like adhesive, rivets etc as per
direction of engineer in-charge. Basic cost of
mirror shall be Rs. 950/-.
22 Providing & Fixing UPVC pipes SCH 40 as per 35.00 M 133.94
ASTM D 1785 and ASTM D -2466 of
Prince/Supreme/Astral make for domestic
water supply including cutting, making
threads at all floor levels including fixtures like
bends, tees, shoe, elbow, union, nipple etc
joined with IPS WELD ON solvent cement or
equivalent resin of approved brand &
manufacture etc. complete for opened piping:
1) Up to 20 mm dia (Basic price Rs. 55/- per
23 2) Same as per item no-22 but for Up to 25 20.00 M 141.21
mm dia (Basic price Rs.85/- per M)
24 3) Same as per item no-22 but for Up to 40 15.00 M 272.68
mm dia (Basic price Rs. 140/- per M)
25 4) Same as per item no-22 but for Up to 50 15.00 M 346.94
mm dia (Basic price Rs. 185/- per M)
26 5) Same as per item no-22 but for Up to 75 10.00 M 699.96
mm dia (Basic price Rs. 390/- per M)
27 Providing & fixing approved quality heavy duty 15.00 M 197.21
50 mm dia. Rigid PVC pipes & fittings of
Prince / Supreme or its equivalent quality
including fixing with clamps, jointing, testing,
a) Pipes (Basic price Rs. 100/- per M)
28 b) Same as per item no-27 but for Fittings 10.00 No 121.73
such as elbow, tee, coupling, reducer, etc.
(Basic price Rs.85/-)
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Estimate
Item Description Unit
Qty Rate Amount (Rs.)
29 Providing & fixing approved quality heavy duty 50.00 M 227.64
75 mm dia. Rigid PVC pipes & fittings of
Prince / Supreme or its equivalent quality
including fixing with clamps, jointing, testing,
a) Pipes (Basic price Rs. 120/- per M)
30 b) Same as per item no-29 but for Fittings 10.00 No 133.91
such as elbow, tee, coupling, reducer, etc.
(Basic price Rs. 95/-)
31 Providing & fixing approved quality heavy duty 60.00 M 355.46
110 mm dia. Rigid PVC pipes & fittings of
Prince / Supreme or its equivalent quality
including fixing with clamps, jointing, testing,
a) Pipes (Basic price Rs. 225/- per M)
32 b) Same as per item no-31 but for Fittings 25.00 No 158.25
such as elbow, tee, coupling, reducer, etc.
(Basic price Rs. 115/-)
33 Providing & fixing Cera or equivalent make 2.00 No 1040.81
chrome polished ABS health faucet set with
standard accessories like flexible hose
(minimum 1.00 meter) & wall hook including
fixing of new fittings with Teflon or hold tight,
removing of existing fixtures, etc. complete.
(Basic rate Rs.700/-).
34 Providing & fixing Maleysian sal wood frame 3.50 M2 5893.56
from 125mmx65mm size sections for door
with 38mm thick commercial flush door
'shutters including providing 6 Nos. of hold
fasts fixed in concrete block (M-15) for make
heavy duty hinges, Iron oxidised fixtures like
handles, aldrops stoppers, pagstays, etc.
including teakwood edge lipping, etc. with two
or more coats of synthetic enamel paint 'of
approved make and shade over a coat of
primer, etc. complete as per design.
35 Providing and fixing in position Colour 2.00 No 4700
anodize coated aluminium louvered glass
ventilators of adjustable type including with
frames having Pipe section 2.5''x1.5'' of
Guage Make Jindal or equivalent make with
fixing 4 mm thick bajri / clear glass making
frame and glass water tight, making it
good,Space for Exhust Fan etc. complete at
all floor levels.
36 Visit charges of plumber with tools & tackles 3.00 Day 654
including to & fro transportation for fixing of
Bib Tap, Pillar tap, waste coupling, PVC Spiral
waste pipe, etc. as decided by Engineer-in-
37 Supply of unskilled labour for assist/helping of 3.00 Day 518.84
38 Supply of Mason for 08 Hrs 2.00 Days 770.78
39 Carpenter supply for re-fixing of door 2.00 Day 708.5
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Sr. Estimate Estimate Estimate
Item Description Unit
Qty Rate Amount (Rs.)
40 Closing of small openings, holes, etc. with 4.00 No. 95.6334434
bricks /cement concrete as per instructions of
engineer with both side plastering, shuttering,
whichever required etc. complete and for hole
size upto 0.10 m2.
41 Cutting zari up to 50mm x 50mm with cutting 125.00 M 78.91
machine / manually in brick masonry wall for
42 Making Connection to the Existing inspection 3.00 No 681.04
Chamber By making hole in Brick wall
Total Amount (Rs.)
Total Amount (Rs.)
GST Amount @ 18% (Rs.)
Total Amount with 18% GST (Rs.)
Total Amount with 18% GST (Rs.)
Part Descriptions Amount
A SoR Amount for Renovation of Attached
Toilets of Guest House Rooms in VIP Block
at Tapi Guest House including 18% GST
B SoR Amount for Renovation for Wash Basin
Area including Ladies and Gents Toilets at
Narmada Guest House including 18% GST
Total SoR Amount of Part A +B with 18% GST
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
PRICE BID (To be quoted online only through website:
https://tender.nprocure.com)
Description SoR Amount Above/Below Contractor's Total
(1) including GST (3) percentage to Quoted
(Rs.) be filled by Amount in
(2) bidder (equal, (Rs.)
Surat Lignite Power Plant - 26,23,661.12 Equal
4X125 MW, Renovation of Above
Attached Toilets of Guest Below
House Rooms in VIP Block at
Tapi Guest House and Wash
Basin Area including Ladies
and Gents Toilets at Narmada
Guest House, SLPP Colony as
per SoR (Part-A & B) (including
The quoted percentage rate on given SoR item rates will be inclusive of all
labour cost, equipments, materials (except specified free supplied materials by
GIPCL in respective items), supervision, consumables, tools, tackles, profit &
overheads, all taxes & duties, (GST 18% is considered on total estimated SoR
value), etc… Rates shall be firm for entire duration of contract period.
At estimated SoR value (including GST)
______%age above the estimated SoR value (including GST)
______%age below the estimated SoR value (including GST
Note:- (1) Percentage rate offer/bid price on SoR value (including 18% GST) shall be quoted through online (n)-
Procure only. Hard copy of price bid shall not be considered/accepted.
(2) Evaluation of tender will be done on gross total quoted amount (including 18% GST).
SEAL & SIGNATURE OF TENDERER : __________________________________
NAME OF AUTHORISED PERSON : __________________________________
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Date : Signature of Contractor
with official stamp
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE
BY SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO:
Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred to
as “The Company/Owner” which expressions shall unless repugnant to the
subject or context includes its legal representatives, successors and assigns)
has entered into a contract with M/s. ………………………………..
………………………….(hereinafter referred to as “Contractor(s)/ Seller(s)”
which expression shall unless repugnant to the subject or context includes their
legal representatives, successors and assigns ) for
…………………………….on the terms and conditions as set out inter alia, in
the Company’s contract No./ work order
No.……………………………………………..date …………and various
documents forming part thereof hereinafter referred to as the “said contract”
which expression include all amendments, modifications and/ or variations
thereto and where as the Contractor(s)/ Seller(s) has agreed for due execution
of the entire contract and guarantees its performance including any parts
executed through any other agencies/ subcontractors
AND WHEREAS one of the conditions of the “said contract” is that
“contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a
bank for….% (……….percent) of the total value of the “said contract” against
due and faithful performance of the “said contract” including performance
guarantee obligations of the contractor(s)/seller(s) for execution/ supplies
made under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating
that in the opinion of the Company, which is final & binding, the amount claimed
is due by reason of default made by the Contractor(s)/ Seller(s) in performing
any of the terms & conditions of the said Contract including defect liability
obligations, in fulfilling the performance guarantee obligation or loss or damage
caused to or would be caused to or suffered by the Company by reason of any
breach by the said Contractor (s)/ Seller(s) of any of the terms & conditions of
the contract. Any such demand made on the Bank by the owner shall be
conclusive as regards the amount due and payable by the Bank under this
guarantee. However our liability under this guarantee shall be restricted to Rs.-
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the contractor(s)/ Seller(s) in
any suit or proceeding pending before any office, court or tribunal relating
thereto our liability under this present guarantee being absolute and
unequivocal. The payment so made by us under this bond shall be a valid
discharge of our liability for payment there under. Our liability to pay is not
dependent or conditional on the owner proceeding against the Contractor(s)/
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all
respect and for all purposes be binding and operative until payment of all
money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke this
guarantee during its currency without previous consent of the
OWNER/PURCHASER and further agrees that if this guarantee is extended
for a period as mutually agreed between contractor & owner/purchaser, the
guarantee shall be valid for a period so extended provided that a written
request for such extension is received before the expiry of validity of
6. We ……………Bank further agree with the Company that the company shall
have the fullest liberty without our consent and without affecting in any manner
our obligations hereunder to vary any of the terms and conditions of the said
Contract(s)/ Order(s) or to extend the time of performance by the said
Contractor(s) Seller(s) from time to time or to postpone for any time or from
time to time any of the powers exercisable by the Company against the said
Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and
conditions relating to the said Contract(s)/ Order(s) and we shall not be
relieved from our liability by reason of any such variation, or extension being
granted to the said Contractor (s) / Seller(s) or for any forbearance, act or
omission on the part of the Company or any indulgence by the Company to
the said Contractor(s)/ Seller(s) or by any such matter or thing whatsoever
which under the law relating to sureties would, but for this provision, have
affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force
till..……..Unless a demand or claim under this Guarantee is made on us within
three months from the date of expiry we shall be discharged from all the
liabilities under this guarantee.
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate
Office at PO: Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter
called “The Company Owner” which expression shall unless repugnant to the subject
or context includes its legal representatives, successors and assigns) has issued
tender paper vide its Tender No……………………………………………for --------------
----------------------------- (hereinafter called “the said tender”)to
M/s.……………………………(hereinafter called the said Tenderer(s)” which
expression shall unless repugnant to the subject or context includes their legal
representatives, successors and assigns and as per terms and conditions of the said
tender, the tenderer shall submit a Bank guarantee for Rs.……….
(Rupees……………..only) towards earnest money in lieu of cash.
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this guarantee
without any demur, merely on a demand from the Company stating that in the opinion
of the company which is final and binding, the amount claimed is due because of any
withdrawal of the tender or any material alteration to the tender after the opening of
the tender by way of any loss or damage caused to or would be caused or suffered
by the Company by reason of any breach by the said tenderer(s) of any of the terms
and conditions contained in the said tender or failure to accept the letter of Intent
Agreement or that the amount covered under this Guarantee is forfeited. Any such
demand made on the Bank by the owner shall be conclusive as regards the amount
due and payable by the Bank under this guarantee, However, our liability under this
guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not withstanding any
dispute or disputes raised by the tenderer (s) in any suit or proceeding pending before
any office, court or tribunal relating thereto our liability under this present guarantee
being absolute and unequivocal. The payment so made by us under this bond shall
be a valid discharge of our liability for payment there under. Our liability to pay is not
dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by
the liquidation or winding up, dissolution or change of constitution or insolvency of
the said tenderer(s) but shall in all respect and for all purposes be binding and
operative until payment of all money due or liabilities under the said contract(s)/
Order(s) are fulfilled.
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the finalization
of the said tender and that it shall continue to be enforceable till the said tender is
finally decided and order placed on the successful tenderer(s) and or till all the dues
of the company under or by virtue of the said tender have been fully paid and its
claims satisfied or discharged or till a duly authorized officer of the company certifies
that the terms and conditions of the said tender have been fully and properly carried
out by the said tenderer (s) and accordingly discharges the guarantee.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
6. That the Owner Company will have full liberty without reference to us and without
affecting this guarantee to postpone for any time or from time to time the exercise of
any of the power of the owner under the tender.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission of
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
PROFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill are full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept
this, and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will
not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the
works for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out above
referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the
statutory requirements. We hereby indemnify GIPCL from any disputes arising in future
related to payment of labours, Provident Fund, etc.and confirm that all liabilities of
settlements of disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
(Surat Lignite Power Plant)
Schedule of Deviation from Technical Specification and Commercial Terms
All the deviations from the terms & conditions of contract shall be filled by
BIDDER clause by clause in this schedule.
Sr. No SECTION CLAUSE AS PER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s
Tender enquiry. The bidder further confirms that in the events any other data and information
presented in the BIDDER’s proposal and accompanying documents are at variance with
specific requirements laid out in the OWNER’s Tender Document, then the latter shall govern
and will be binding on the BIDDER for quoted price.
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm,
agree and undertake that all the Statutory and Safety Laws and Regulations of the applicable
Authority/ies shall be strictly followed for all types of works at the site during the period of the Contract,
if awarded to me.
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Disputes/ Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
______________________ on behalf of ………Name of Party/Company………..hereby
confirm that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings / organizations
for the last three (03) years. There are no ongoing/pending legal matter(s) with any of the
Govt. of Gujarat Undertakings / GoG supported Companies, including GIPCL.
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the
last three( 03) years.
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in
this regard shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
E-Tender for “Surat Lignite Power Plant - 4X125 MW, Unit # 1 to 4: Renovation of Attached Toilets of Guest
House Rooms in VIP Block at Tapi Guest House and Wash Basin Area including Ladies and Gents Toilets at
Narmada Guest House, SLPP Colony”. Bid No.: SLPP/Civil/Colony/ Toilet Renovation/2026.
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of Advance for Ash, DM water etc.”
(The link is visible as horizontal highlighted below Tenders - News & Update Section)
3. After clicking the link the new page will open. On this page, No need to enter User
Name and Password. Directly click on “ Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will
be self explanatory. It is desired that all the information may be filled correctly so that
the payment made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available”
and then proceed. E.g. some information like Party code is not available to vendor or
GST No. not available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”,
It will be appreciated that regular vendors may obtain the party code from Materials
or Concerned Person , so that the vendor can be identified. The same party code may
be used for future transactions also After entering the details, click on SUBMIT
5. he vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway,
the charges* as below will be applicable, which has to be borne by Vendor/Party making
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BG Format.pdf
Tender for Tapi and Narmada GH Toilet renovation.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .