Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Fee/PreQual/Technical/Finance BANAMALIPUR AGARTALA TRIPURA WEST PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | -11.00% | ₹9.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.9 LAdmitted-Fee/PreQual/Technical/Finance | -10.55% | ₹9.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.3 LAdmitted-Fee/PreQual/Technical/Finance DHALESWAR SOUTH AGARTALA COLLEGE TRIPURA WEST | AGARTALA | WEST TRIPURA | TRIPURA | 799004 | -6.75% | ₹10.3 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | -4.11% | ₹10.6 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.0 L
EMD Value
₹22,030
Closing Date
14 May 2026, 3:00 pmClosed
e Executive Engineer,P.W.Div-IV,AM
O/O the Executive Engineer,P.W.Div-IV,AM
Maintenance road and drain at Paul Nursing home gali under ward no 21 AMC
2026_SAMC_72589_1
DNIET-15/Div-IV/AMC/2026-27
Open Tender
Civil Works
Percentage
60 days
under ward no-21, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹22,030
Yes
25 Jun 2026
6 May 2026
14 May 2026
6 May 2026
14 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil | 1 | cum | 231.6 | ₹231.37 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | 1,177.3 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 9,938.6 | - |
| 4 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 1 | cum | 9,845.2 | ₹9,835.35 |
| 5 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | 1,533.5 | - |
| 6 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) with neat cement punning | 1 | sqm | 281 | ₹280.72 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : In plinth and skirting courses, fillets, columns, pillars, posts and struts: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 13,305.8 | ₹13,292.49 |
| 8 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement-
-All work upto plinth level- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 11,693.5 | - |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 0.4 | kg | 103.9 | ₹41.56 |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply | - | sqm | 729.5 | - |
stage.html
html • 0.02 MB
finance_73852.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_73852.xls
BOQ • 0.34 MB
DNIET15.pdf
Tender Documents • 2.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].