Loading…
Loading…
Tender Value
₹10.3 L
EMD Value
₹20,516
Closing Date
3 Aug 2026, 9:00 am2d left
Pritpal Singh
Municipal Committee Barara
Reconstruction and upgradation of Street with M-40 ISI paver block and drain type-II from Shop of Surender Singla to H/o Baljinder singh Via H/o Papal Rana to H/o Gurdyal Saini Ward No 15 in MC Barara.Road Id(ulbbar00612)
2026_HRY_536851_1
2026E564F04C 1F54 45CD 84C3 0973C1106F34379ULB
Open Tender
Civil Works
Works
120 days
Barara
Reconstruction and upgradation of Street with M-40 ISI paver block and drain type-II from Shop of Surender Singla to H/o Baljinder singh Via H/o Papal Rana to H/o Gurdyal Saini Ward No 15 in MC Barara.Road Id(ulbbar00612)
2 documents required · 2 mandatory
₹1,180
₹20,516
Yes
27 Jul 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
27 Jul 2026 - 29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 89.98 | cum | 1,038 | ₹93,399.24 |
| 2 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 1,184 | Sqm | 7 | ₹8,288 |
| 3 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 1,009 | Sqm | 655 | ₹6,60,895 |
| 4 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 1,184 | Sqm | 26 | ₹30,784 |
| 5 | [17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate] | 175 | Sqm | 66 | ₹11,550 |
| 6 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | 430 | Metre | 363 | ₹1,56,090 |
| 7 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 21.66 | cum | 202 | ₹4,375.32 |
| 8 | [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate] | 21.66 | cum | 480 | ₹10,396.8 |
| 9 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 14.4 | cum | 3,476 | ₹50,054.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_615989.xls
BOQ • 0.29 MB
1B7B25Z171265.pdf
Additional Documents • 1.88 MB
OT0171265.pdf
Other Document • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].