Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.0 CrRejected-Finance 800 RAM NAGAR ROORKEE DISTT HARIDWAR UK PIN 247667 | ROORKEE | HARIDWAR | UTTARAKHAND | 247667 | ₹3.0 Cr | L2 | Rejected-Finance Not being L1 |
| 3 | Rejected-Technical 11 CIVIL LINES ROORKEE DISTT HARIDWAR UK PIN 247667 | HARIDWAR | UTTARAKHAND | 247667 | - | - | Rejected-Technical Specialist firm has executed MOU with more than one bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Specialist firm has executed MOU with more than one bidder |
| 5 | Rejected-Technical OFFICE NO 304 305 3RD FLOOR PLOT NO 1 USHA CHAMBERS L S C NEW RAJDHANI ENCLAVE DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | - | - | Rejected-Technical Specialist firm has executed MOU with more than one bidder |
| Sl No | Description | Qty | Unit | sidh builders L2 | JYOTI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00SCHEDULE A PART I (BUILDING WORK) | |||||
| 2.00 | Design, fabrication, supply, erection, construction and execution of single storey class room building using substructure RCC frame (RCC foundation, RCC column, RCC plinth beam) upto plinth level & in superstructure load bearing sections shall be made PEB structures and wall /panels other non-load bearing members of Light gauge steel frame (LGSF). The class room building shall have 4 classrooms (each of size 13.00m x 9.00m) , verandah etc. based on given tentative line plan Drg No CWE No 2/RKE/01/2025-26 Sheet 1/1complete all as specifed and directed. | 1 | Each | 2,50,00,000 ₹2.5 Cr | 1,75,03,200 ₹1.8 Cr |
| 3.00 | Design, fabrication, supply, erection, construction and execution of single storey toilet block consisit of EWC 2 Nos, Urinal 4 Nos and WHB 02 Nos alongwith necessary fittings/ fixtures and plumbing work including structural work for staging of 1000 ltr PVC water tank using substructure RCC frame (RCC foundation, RCC column, RCC plinth beam) upto plinth level & in superstructure load bearing sections shall be made PEB structures and wall /panels other non-load bearing members of Light gauge steel frame (LGSF). The toilet block shall have verandah on one side of the block based on the given tentative plan drg No CWE No 2/RKE/01/2025-26 Sheet 1/1 complete all as specifed and directed. | 1 | Each | 30,00,000 ₹30 L | 18,50,000 ₹18.5 L |
| 4.00 | Total amount of Sch 'A' Part II (DEMOLITION OF BUILDING) (For details see Sch 'A' in PDF folder) | 1 | Each | 1,58,700 ₹1.6 L | 2,40,436 ₹2.4 L |
| 5.00 | Total amount of Sch 'A' Part III (Hard Standing) (For details see Sch 'A' in PDF folder) | 1 | Each | 3,50,000 ₹3.5 L | 3,55,373 ₹3.6 L |
| 6.00 | Total amount of Sch 'A' Part IV (EXTERNAL WATER SUPPLY) (For details see Sch 'A' in PDF folder) | 1 | Each | 1,25,000 ₹1.3 L | 63,935 ₹63,935 |
| 7.00 | Total amount of Sch 'A' Part V (EXTERNAL ELECTRIC SUPPLY) (For details see Sch 'A' in PDF folder) | 1 | Each | 60,000 ₹60,000 | 28,250 ₹28,250 |
| 8.00 | Total amount of Sch 'A' Part VI (SITE CLEARANCE AND EART WORK) (For details see Sch 'A' in PDF folder) | 1 | Each | 40,000 ₹40,000 | 24,565 ₹24,565 |
| 9.00 | Total amount of Sch 'A' Part VII (INTERNAL ELECTRIC SUPPLY) (For details see Sch 'A' in PDF folder) | 1 | Each | 4,50,000 ₹4.5 L | 4,45,800 ₹4.5 L |
| 10.00 | Total amount of Sch 'A' Part VII (INTERNAL WATER SUPPLY) (For details see Sch 'A' in PDF folder) | 1 | Each | 35,000 ₹35,000 | 14,890 ₹14,890 |
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹3.5 L
Closing Date
24 Nov 2025, 6:00 pmClosed
CWE No.2 Meerut
Headquarters Commander Works Engineer No 2 Military Engineer Services Boundary Road, Near Supply Depot Meerut Cantt-250001
PROVISION OF CLASS ROOMS AT BENGAL ENGINEERING GROUP AND CENTRE, ROORKEE
2025_MES_732341_1
95360/RKE/E8
Open Tender
Civil Works
270 days
Roorkee
Please refer tender pages
10 documents required · 10 mandatory
₹2,000
GE Roorkee
₹3.5 L
HQ CWE No-2 Meerut
25 Feb 2026
23 Sept 2025
28 Nov 2025
23 Sept 2025
24 Nov 2025
10 Nov 2025
28 Oct 2025
Total amount of Sch 'A' Part II (DEMOLITION OF BUILDING) (For details see Sch 'A' in PDF folder)
Total amount of Sch 'A' Part III (Hard Standing) (For details see Sch 'A' in PDF folder)
Total amount of Sch 'A' Part IV (EXTERNAL WATER SUPPLY) (For details see Sch 'A' in PDF folder)
Total amount of Sch 'A' Part V (EXTERNAL ELECTRIC SUPPLY) (For details see Sch 'A' in PDF folder)
Total amount of Sch 'A' Part VI (SITE CLEARANCE AND EART WORK) (For details see Sch 'A' in PDF folder)
Total amount of Sch 'A' Part VII (INTERNAL ELECTRIC SUPPLY) (For details see Sch 'A' in PDF folder)
Total amount of Sch 'A' Part VII (INTERNAL WATER SUPPLY) (For details see Sch 'A' in PDF folder)
Note:- (a) Specifications of all items should not be less than the above mentioned specification and quantity. (b) The work to be carried out as per NBC2016 norms and necessary firefighting eqpt also be provided as per Building norms NBC 2016. (c) Specifications of all items should not be less than the above mentioned specification and quantity, if additional quantity and higher specification are required at site the contractor shall be provided the same without any extra cost with the approval of accepting officer. (d) Tenderers may note that amount of credit Rs 2,29,997.00 will be deducted from the total amount arrived, at the time of Acceptance of Contract.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tender95360.pdf
Tender Documents • 4.40 MB
BOQ_819966.xls
BOQ • 0.33 MB
Drawings.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid