| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 LAccepted-AOC CHANDPARA CHANDPURE | KOLKATA | WEST BENGAL | 700001 | L1 | Accepted-AOC AS STATED | |
| 2 | L2₹38.5 L+₹2.0 L (5.38%)Rejected-Finance | L2 | Rejected-Finance AS STATED | |
| 3 | L3₹39.7 L+₹3.1 L (8.49%)Rejected-Finance KOLKATA 700054 | KOLKATA | WEST BENGAL | 700054 | L3 | Rejected-Finance AS STATED |
Tender Value
₹38.1 L
EMD Value
₹76,291
Closing Date
6 Jun 2026, 12:00 pmClosed
SENIOR SUPERINTENDING ENGINEER
KHADYASHREE BHAWAN, 1st Floor, 11A Mirza Ghalib Street, Kolkata 700087
Repairing work at Gaighata RIDF godown in the district of North 24 Parganas.
2026_WBSWC_1024302_1
03 OF 2026-27 OF SE/WBSWC
Open Tender
CIVIL WORKS
Percentage
180 days
Gaighata, North 24 Parganas
PLEASE REFER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹0
₹76,291
25 Sept 2026
14 May 2026
8 Jun 2026
15 May 2026
6 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting
and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge a) 3.90 metre height b) Extra for additional 3.6 height or part thereof | - | Each | 624.5 | - |
| 2 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed(Parapet) | - | Sqm | 22.64 | - |
| 3 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface] (ii) With 1:4 cement morter (c) 20 mm thick plaster | - | Sqm | 231.21 | - |
| 4 | Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed.(transferent sheets), | - | Sqm | 48.86 | - |
| 5 | Supplying, fitting & fixing single skin color coated trapizoidal profile for wall cladding, roof shall be made of 0.45 mm BMT(Base Metal Thickness) (0.5mm TCT(Total coated thickness excluding paint), G550(min 550 yield strength), of Zincalume metalic coating(ISI5965) with high solar reflection index (SRI) value for better colling as per thermatech technology, 1000-1015mm effective cover width with five major corrogation, 28mm high rib spaced at 203mm c/c with subtle square fluting in the pan and the end rib shall have anti capillary grove and return leg, the steel sheet shall be fastened with 40micron zinc coated or 25 micron zinc tin alloy coated , hex head self drilling screw as per IS 3566-2002 class 3 fastener. the base steel shall be coated with zinc aluminium alloy zincalume (AZ150) (i.e. 55%Al,43.4% Zinc, 1.6%Si) minium of 150gm/m2 coating total on both sides, pre-painted with colorbond XRW(xterior roofing walling) paint system of 35micron super durable polyster paint (SDP) with stable inorganic pigment with no lead contents confirming ISI5965. The sheet shall be free from defects and have brand marking of the manufacturer giving product details on the back of the sheet at regular interval confirming genuinity of the material. (i) in roof 0.5mm th. sheet | - | Sqm | 937.95 | - |
| 6 | Stopping roof leakages in C.I. or G.C.I. or asbestos roofing. (iii) Closing holes in C.I.or G.C.I.or asbestos roofing with
sheet bolt, limpet and bitumen washers, putty etc. | - | Each | 19.07 | - |
| 7 | Labour for painting roof surface with Bitumen (using 135 kg (avg.) per % Sq.m.)including cleaning roof, heating bitumen as directed and spreading sand and complete including cost of sand @ 0.6 cu.m. per % Sq.m. and cost of carriage of Bitumen from deptt godown but excluding the cost of bitumen. | - | Sqm | 75.51 | - |
| 8 | Supplying& laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN12311-1&ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyeste core with polyester reinforcement @160gms per sqm & both faces covered with thermo-fusible polyethylene film/MineraLon top face over a coat of primer @0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required. Lap joint shall be provided of 75mm in longitudinal &100mm in transverse direction and fused using LPG/Propane torch employing extra care ensuring full bondage,complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials, labour and applicable taxes.(Payment shall be made on the basis of finished surface area.).
Membrane Property: Softening Point > 150 deg C, ColdFlexibility < -6 deg C, Tensile Strength, N/cm : 600(longitudinal), 450 (transverse), Tearing Strength, N:300 (longitudinal), 200 (transverse) | - | Sqm | 485.06 | - |
| 9 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof | 1 | Cum | 2,331.16 | ₹2,328.83 |
| 10 | (c) Anti termite treatment to the soil under floor with chemical emulsion by admixing imidacloprid emulsifiable
concentrates (72ml in 34litres) with water by weight including drilling vertically 12mm dia, holes at the junction of floor and wall at 300mm, interval to reach the soil below using hand operated pressure pump to squirt chemical emulsion into the pump to squirt chemical emulsion into the holes at the rate of one litre per hole. the holes shall be sealed after operation to match with the existing floor. The entire work is to be carried out as per specification laid down at table 1 & in para 5.3.1.3 of code IS- 6313 (part -III)-2013 | - | Sqm | 87 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
2911ii.pdf
Tender Documents • 0.50 MB
Annexure-II.pdf
Tender Documents • 1.43 MB
BOQ_2517327.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .