Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹1.8 Cr+₹3.5 L (1.97%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 2 | L4₹1.8 Cr+₹4.7 L (2.67%)Accepted-Finance UPENDRAVILASAM STAIONKADVU KULATHOOR PO AE POTHENCODE PANCHAYATH | THIRUVANANTHAPURAM | KERALA | 695001 | L4 | Accepted-Finance L4 | |
| 3 | L5₹1.8 Cr+₹8.5 L (4.87%)Accepted-Finance | L5 | Accepted-Finance L5 | |
| 4 | L1₹1.8 CrRejected-Finance ANAS MANZIL KALLELIBHAGOM KARUNAGAPPALLY 690519 KOLLAM DIST KERALA | KOLLAM | KERALA | 690519 | L1 | Rejected-Finance L1 | |
| 5 | L2₹1.8 Cr+₹3.0 L (1.73%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹2.1 Cr
EMD Value
₹1 L
Closing Date
24 Nov 2026, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer
GENERALConstruction of New building block for FHC Pullampara,Thiruvananthapuram
2026_PWD_887532_1
PWD/BLDG/TR/2019/2022
Open Tender
Civil Works - Buildings
Percentage
Nedumangad
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
27 Nov 2026
10 Nov 2026
26 Nov 2026
10 Nov 2026
24 Nov 2026
10 Nov 2026
60 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Retaining Structures(Civil work) | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 532.92 | cum | 263.35 | ₹1,40,344.48 |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 76.84 | cum | 133.93 | ₹10,290.65 |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.99 | cum | 8,109.18 | ₹48,590.21 |
| 1.004 | OD40455/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately..All work upto plinth level | 54.45 | cum | 11,222.29 | ₹6,11,087.36 |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,445.28 | kilogram | 114.92 | ₹6,25,771.58 |
| 1.006 | OD40454/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately .All work above plinth level up to floor V level | 60.32 | cum | 13,302 | ₹8,02,416.55 |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 6,032.32 | kg | 114.92 | ₹6,93,234.21 |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 14.28 | sqm | 394.74 | ₹5,636.89 |
| 1.009 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 592.38 | sqm | 858.26 | ₹5,08,411.77 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
affidavit.pdf
Additional Documents • 0.33 MB
formoftender.pdf
Additional Documents • 0.34 MB
priliminaryagreement.pdf
Additional Documents • 0.42 MB
epayment.pdf
Other Document • 0.01 MB
integritypact.pdf
Other Document • 0.10 MB
BOQ_1514939.xls
BOQ • 0.37 MB
bid.pdf
Tender Documents • 2.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .