| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹2.7 L | L1 | Accepted-AOC Award |
| 2 | L2₹2.7 L+₹3,810.96 (1.42%)Rejected-Finance | ₹2.7 L+₹3,810.96 (1.42%) | L2 | Rejected-Finance Lowest 2 |
| 3 | L3₹2.8 L+₹6,960.84 (2.59%)Rejected-Finance | ₹2.8 L+₹6,960.84 (2.59%) | L3 | Rejected-Finance Lowest 3 |
| 4 | L4₹2.9 L+₹19,015.92 (7.07%)Rejected-Finance | ₹2.9 L+₹19,015.92 (7.07%) | L4 | Rejected-Finance Lowest 4 |
| 5 | L5₹3.0 L+₹34,220.88 (12.7%)Rejected-Finance | ₹3.0 L+₹34,220.88 (12.7%) | L5 | Rejected-Finance Lowest 5 |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
1 Sept 2026, 10:00 amClosed
Execuitve Engineer
EE HP PWD Division Tanda at Nagrota Bagwan
Repair to Anatomy Lecture Theater and Examination Hall for Dr R.P. Govt. Medical College Tanda in Tehsil Nagrota Bagwan Distt Kangra (HP) (Deposit work) (SH-Providing and fixing plain multipurpose cement board painting and distempering work etc)
2026_PWD_141895_1
Nagrota 4165-79
Open Tender
Civil Works - Buildings
Percentage
60 days
Nagrota Bagwan
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹7,800
9 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: Asbestos cement sheet as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government | 366.88 | Per square metre | 27.88 | ₹10,228.61 |
| 2 | Providing and fixing 6 mm thick Cement fiber board as per IS: 14862 plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc; complete (frame work to be paid seperatately) as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government | 372.65 | Per square metre | 493.18 | ₹1,83,783.53 |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats complete as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government | 372.64 | Per square metre | 69.83 | ₹26,021.45 |
| 4 | Wall painting Two or more coats on new work with acrylic emulsion paint of approved brand and manufacture to give an even any shade complete as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government | 670.63 | Per square metre | 75.85 | ₹50,867.29 |
| 5 | Providing and applying J.K. white Birla cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete and as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government | 201.19 | Per square metre | 49.15 | ₹9,888.49 |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government | 1,238.22 | Per Kilo-gram | 87.29 | ₹1,08,084.22 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Sbd.pdf
Tender Documents • 8.00 MB
BOQ_210626.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .