Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.4 L+₹17,793.12 (7.96%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.5 L+₹30,756.53 (13.8%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.9 L+₹65,443.76 (29.3%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | MUHAMMED ARUVEETTIL L1 | SAJAD MUHSSIN L4 | AMEER SHA V. L3 | Prabhakaran C L2 |
|---|---|---|---|---|---|---|---|
| 1.00CC WALL | |||||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 5.35 | cum | 57.82 ₹309.11 Lowest | 65.78 ₹351.66 | 65.78 ₹351.66 | 62.43 ₹333.75 |
| 1.00 | OD443535/2025-2026:[OD from MORD 11.4.1.1] - Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification Clause 802,803,1202 & 1203
1.P C C grade M 10
(i)Nominal mix 1:3:6 (excluding form work) | 1.34 | cum | 6,988.08 ₹9,343.06 Lowest | 7,950.03 ₹10,629.19 | 7,950.03 ₹10,629.19 | 7,544.58 ₹10,087.1 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 24.43 | cum | 7,102.39 ₹1,73,504.29 Lowest | 9,500 ₹2,32,075.5 | 8,080.08 ₹1,97,388.27 | 7,668 ₹1,87,321.57 |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.49 | tonne | 81,090.85 ₹39,653.43 Lowest | 92,253.53 ₹45,111.98 | 92,253.53 ₹45,111.98 | 87,548.6 ₹42,811.27 |
| 1.00 | OD443711/2025-2026:OD from 60.6-PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 6 | metre | 103.34 ₹620.04 Lowest | 117.56 ₹705.36 | 117.56 ₹705.36 | 111.56 ₹669.36 |
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
10 Feb 2026, 6:55 pmClosed
Ali Faisal KT
Office of the Assistant Engineer, LID EW Section, Pandikkad Grama Panchayat
Annual Plan PRO NO 550 OF PANDIKKAD GP VALAVU VALIL ROAD SIDE PROTECTION AT WARD 10
2026_LSGD_832956_26
06/2025-26/AE/LIDEW/PNKD
Open Tender
Civil Works - Roads
Item Rate
365 days
Pandikkad
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
Yes
₹6,355
30 Jun 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CC WALL | |||||
| 1.001 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | - | cum | - | - |
| 1.002 | OD443535/2025-2026:[OD from MORD 11.4.1.1] - Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification Clause 802,803,1202 & 1203
1.P C C grade M 10
(i)Nominal mix 1:3:6 (excluding form work) | 1 | cum | - | - |
| 1.003 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 1 | cum | - | - |
| 1.004 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | - | tonne | - | - |
| 1.005 | OD443711/2025-2026:OD from 60.6-PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_1400977.xls
BOQ • 0.30 MB
550.rar
Tender Documents • 3.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .