| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance 18 1 ADARSHA PALLY D P NAGAR KOL 56 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | L1 | Accepted-Finance SINCE THE LOWEST | |
| 2 | L2₹2.0 L+₹1,158 (0.57%)Rejected-Finance | L2 | Rejected-Finance MORE THAN THE LOWEST | |
| 3 | L3₹2.0 L+₹1,199 (0.59%)Rejected-Finance | L3 | Rejected-Finance MORE THAN THE LOWEST | |
| 4 | L4₹2.1 L+₹3,454 (1.71%)Rejected-Finance | L4 | Rejected-Finance MORE THAN THE LOWEST | |
| 5 | L5₹2.1 L+₹5,080 (2.51%)Rejected-Finance 15 KISHNA GHOSH LANE GORABAZAR P O BERHAMPORE DIST MURSHIDABAD WEST BENGAL 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | L5 | Rejected-Finance MORE THAN THE LOWEST |
Tender Value
₹2.0 L
EMD Value
₹4,064
Closing Date
7 Oct 2026, 11:00 amClosed
The Assistant Engineer, BNWSD-I, Purta Bhavan
The Assistant Engineer, BNWSD-I, Purta Bhavan, Room No 125
Construction of cable trench for LT Bulk connection of West Bengal Board of Primary Education in Acharya Prafulla Chandra Bhavan, DK-7/1, Sector-II, Salt Lake City, Kolkata-91, during the year 2026-2027
2026_WBPWD_5076871_3
AE/BNWSD-I/NIT-07e/2026-2027
Open Tender
CIVIL WORKS
Percentage
15 days
Purta Bhavan, Salt Lake, Sector-I, Kolkata-700091
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,064
Yes
12 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar. | 2.32 | Cu.M. | 2,060.2 | ₹4,779.66 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 1.17 | Cu.M. | 1,503.6 | ₹1,759.21 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.78 | Cu.M. | 3,551.25 | ₹2,769.98 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 8.58 | Cu.M. | 177.5 | ₹1,522.95 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 2.28 | Cu.M. | 2,123.75 | ₹4,842.15 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal
size derived from natural sources) ( a) Pakur Variety | 2.85 | Cu.M. | 7,878.5 | ₹22,453.73 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.81 | Cu.M. | 7,132.25 | ₹27,173.87 |
| 8 | CEMENT PLASTER (IN FINE SAND) 20 mm cement plaster 1:6 (1 cement : 6 fine sand) : | 15.24 | Sq.M. | 450 | ₹6,858 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.78 | Cu.M. | 9,045.75 | ₹16,101.44 |
| 10 | Centering and shuttering including strutting, propping etc. and removal Foundations, footings, bases of columns, etc. for mass oncrete | 25.74 | Sq.M. | 392.15 | ₹10,093.94 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_5172221.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .