| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L Quoted ₹6.0 L | L1 | Accepted-AOC DUE TO L1 |
| 2 | L2₹6.1 L+₹12,235.66 (2.04%)Rejected-Finance | ₹6.1 L+₹12,235.66 (2.04%) | L2 | Rejected-Finance REJECTED DUE TO L2 |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
22 Oct 2022, 11:00 amClosed
EXECUTIVE ENGINEER, MGCCD-14, GARHMUKTESHWAR
OFFICE OF THE EXECUTIVE ENGINEER, MGCCD-14, GARHMUKTESHWAR
CONSTRUCTION OF VRB AT KM. 3.350 OF DHANORI MINOR
2022_UPIDC_738800_5
04/EE/2022-23
Open Tender
Civil Works - Canal
Item Rate
120 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹31,000
17 Aug 2024
17 Oct 2022
22 Oct 2022
17 Oct 2022
22 Oct 2022
17 Oct 2022
17 Oct 2022 - 22 Oct 2022
Amount
Excavation in Foundation in Ordinary soil for structure i/c all lead & reqd. lifts as per site requirement and with proper disposel of excavated earth as per directed by engineer in charge for proper completion of work
Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work
Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work
Centering & shuttering for bridge, parapet and transitions i/c all cost of labour & T&P etc complete for proper completion of work
Reinforced Cement Concrete in (1:1.5:3) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Cement Concrete in (1:1:2) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work
Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work
Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work
Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work
Providing and Fixing of year Plate for proper completion of work
Providing and fixing of B.M Plate for proper completion of work
Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work
Earth work in Filling in Layers including cariage of earth from a distance of 1km. & all lifts i/c ramming dressing & all labour T&P etc.
M-100 Brick on edge paving i/c Joints filleds with sand including cost of all material, labour, T&P etc for proper completion of work
M/s VIJAY ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .