Loading…
Loading…
Tender Value
₹19.4 L
EMD Value
₹38,840
Closing Date
27 Jul 2026, 4:00 pmDue tomorrow
Executive Engineer
Kotranka
Permanent Restoration of Road from Pinga Badhal Road
2026_PWDJK_317079_5
NIT No. 18 of 2026-27 dated 21.07.2026
Open Tender
Civil Works
Percentage
Kotranka
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Executive Engineer PWD RnB Division Kotranka
₹38,840
21 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
27 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical means (hydraulic excavator) in trenches for foundations, drains,pipes,cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan ,depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge ,disposal earth is to be levelled and neately dressed.all kind of soil = 80%, ordinary rock =20%. | 380 | Cum | 327.84 | ₹1,24,579.2 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:5:10 ( 1 Cement :5 Coarse sand : 10 graded stone agg. 40mm nominal size) crushed stone agg . All work upto plinth level. | 16 | Cum | 4,826.5 | ₹77,224 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 using 20% plum of nallah split stone (1 cement:3 coarse sand : 6 graded crushed stone
aggregate 20mm nominal size) crushed. | 27 | Cum | 4,774.46 | ₹1,28,910.42 |
| 4Centring and Shuttering including strutting, propping etc and removal of form work for | |||||
| 0.9 | Foundations: footings, bases of columns etc. for mass concrete. | 180 | Sqm | 286.35 | ₹51,543 |
| 5 | Stone filling hand packed in horizontal on level including cost of stones. | 48 | Cum | 937.9 | ₹45,019.2 |
| 6 | Providing and laying 40mm thick cement concrete flooring in 1:2:4 mix (1 sement : 2 coarse sand:4 graded stone aggregate 20mm nominal size crusher aggregate). | 45 | Mtr | 510.25 | ₹22,961.25 |
| 7 | Slip Clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | 210 | Cum | 331.15 | ₹69,541.5 |
| 8 | Hand-packing stones in wire-crates; including cost of crates and stone | 634 | Cum | 1,800 | ₹11,41,200 |
| 9Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_1037411.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].