Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.1 LAccepted-AOC | L1 | Accepted-AOC Agreement executed by L1 bidder | |
| 2 | L2₹44.0 L+₹92,562.73 (2.15%)Rejected-AOC | L2 | Rejected-AOC Agreement executed by L1 bidder | |
| 3 | Rejected-Technical KANNADIKKUZHI HOUSE RAMANATTUKARA VAZHAYUR EAST PO | - | Rejected-Technical L1 and L2 tender approved | |
| 4 | Rejected-Technical | - | Rejected-Technical L1 and L2 tender approved | |
| 5 | Rejected-Technical | - | Rejected-Technical L1 and L2 tender approved |
Tender Value
₹63.0 L
EMD Value
₹50,000
Closing Date
6 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
O/O Executive Engineer HED Division Ponnan
O/O Executive Engineer HED Division Ponnan
New road formation
2021_HED_455802_1
19/HED/EEM/2021-22
Open Tender
Civil Works - Roads
Item Rate
180 days
Kondotty
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
11 Jan 2022
23 Nov 2021
10 Dec 2021
23 Nov 2021
6 Dec 2021
26 Nov 2021
23 Nov 2021 - 26 Nov 2021
60 days
Amount
Appendix A: MoRD for road work
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6
11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20 (i)Nominal mix (1:2:4)
3.2 : Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
5.11.2.A.2a : Mix Seal Surfacing - Mechanical Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Mechanical Means :- Type A <br> (II) Bitumen (S-65)
5.2.3a : Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.1.1a : Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Appendix B: DAR for road work
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
od5328/2021_2022 : Filling with Quarry Muck &amp;amp;lt;br&amp;amp;gt; Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller etc complete for improving the CBR value of subgrade
N K ABDUL JALEEL
VISHNU BABU
UMER KOYA U
SUDEVAN T
P K Hameed
sajid pakkada
INSHAF MOHAMMED SHUHAIB
P.KUNHIKOYA
MOOSA K
HAREESH KUMAR V K
Mohammed Fasil
JABEER.U
HASSAN C
Bidder Name
Mohammed Fasil
P K Hameed
P.KUNHIKOYA
MOOSA K
UMER KOYA U
N K ABDUL JALEEL
HASSAN C
HAREESH KUMAR V K
JABEER.U
SUDEVAN T
sajid pakkada
VISHNU BABU
ERNAD CREATIVE CONSTRUCTION LLP
INSHAF MOHAMMED SHUHAIB
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_652131.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .