Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹3.4 Cr+₹45.4 L (15.4%)Rejected-Finance MATHRAKKATTU BRAHMAPURAM P O AMBALAMEDU ERNAKULAM 682 303 | ERNAKULAM | ERNAKULAM | KERALA | 682303 | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹3.6 Cr+₹66.7 L (22.6%)Rejected-Finance KALARIKKAPARAMBIL BRAHMAPURAM P O AMBALAMUGAL ERNAKULAM 682 303 | ERNAKULAM | ERNAKULAM | KERALA | 682303 | L3 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | YES YEM CONSTRUCTION L2 | HITRUST CONSTRUCTIONS L1 | saaj constructions L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish out side Infopark campus | 480 | sqm | 14 ₹6,720 | 9 ₹4,320 Lowest | 10 ₹4,800 |
| 2.00 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 20 | no | 450 ₹9,000 | 400 ₹8,000 Lowest | 580 ₹11,600 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth at Infopark Phase II including all lead and lift, disposed earth to be levelled and neatly dressed.All kinds of soil | 384 | cum | 210 ₹80,640 | 200 ₹76,800 Lowest | 230 ₹88,320 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains , including back filling, dressing of sides and ramming of bottom with all lead and lift and disposing of surplus excavated earth for all kinds of soil within infopark phase 2 campus. | 345 | cum | 230 ₹79,350 | 200 ₹69,000 Lowest | 320 ₹1,10,400 |
| 5.00 | Filling available excavated earth(excluding rock) in trenches, under floors, in areas etc. in layers not exceeding 20cm in depth,consoldating each deposited layer by ramming and watering with all lead and lift including cost and conveyance of all materials, labour charges, etc complete at all levels as directed by the Engineer-in-Charge | 194 | cum | 240 ₹46,560 | 225 ₹43,650 | 200 ₹38,800 Lowest |
| 6.00 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).M-sand may be used for the work. | 85 | cum | 6,400 ₹5,44,000 | 225 ₹19,125 Lowest | 6,700 ₹5,69,500 |
| 7.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).M-sand may be used for the work. | 84 | sqm | 450 ₹37,800 | 400 ₹33,600 Lowest | 850 ₹71,400 |
| 8.00 | Applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 84 | sqm | 130 ₹10,920 Lowest | 200 ₹16,800 | 180 ₹15,120 |
| 9.00 | Providing and laying cement concrete for string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. at all level and above, including the cost of centering, shuttering and finishing: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).M-sand may be used for the work. | 10 | cum | 6,500 ₹65,000 Lowest | 16,500 ₹1,65,000 | 10,500 ₹1,05,000 |
| 10.00 | Diluting and injecting chemical emulsion for POST -CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement : 2 coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 508 | sqm | 260 ₹1,32,080 | 220 ₹1,11,760 Lowest | 360 ₹1,82,880 |
Tender Value
₹3.3 Cr
EMD Value
₹1 L
Closing Date
26 May 2025, 6:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive Officer
Parkcentre, near Thapasya building, Infopark Kochi PO, Kakkanad
As per NIT
2025_INFOP_763735_1
Infopark/ e-Tender /003/2025-26
Open Tender
Civil Works - Buildings
Item Rate
Infopark Phase 1 campus, at Kakkanad, Ernakulam Di
As per NIT
8 documents required · 8 mandatory
₹8,850
₹1 L
18 Sept 2025
12 May 2025
27 May 2025
12 May 2025
26 May 2025
12 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish out side Infopark campus | 480 | sqm | 14.78 | ₹7,094.4 |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 20 | no | 447.99 | ₹8,959.8 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth at Infopark Phase II including all lead and lift, disposed earth to be levelled and neatly dressed.All kinds of soil | 384 | cum | 214.03 | ₹82,187.52 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains , including back filling, dressing of sides and ramming of bottom with all lead and lift and disposing of surplus excavated earth for all kinds of soil within infopark phase 2 campus. | 345 | cum | 296.94 | ₹1,02,444.3 |
| 5 | Filling available excavated earth(excluding rock) in trenches, under floors, in areas etc. in layers not exceeding 20cm in depth,consoldating each deposited layer by ramming and watering with all lead and lift including cost and conveyance of all materials, labour charges, etc complete at all levels as directed by the Engineer-in-Charge | 194 | cum | 258.57 | ₹50,162.58 |
| 6 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).M-sand may be used for the work. | 85 | cum | 6,814.89 | ₹5,79,265.65 |
| 7 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).M-sand may be used for the work. | 84 | sqm | 493.07 | ₹41,417.88 |
| 8 | Applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 84 | sqm | 149.15 | ₹12,528.6 |
| 9 | Providing and laying cement concrete for string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. at all level and above, including the cost of centering, shuttering and finishing: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).M-sand may be used for the work. | 10 | cum | 9.49 | ₹94.9 |
| 10 | Diluting and injecting chemical emulsion for POST -CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement : 2 coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 508 | sqm | 267.25 | ₹1,35,763 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 0.20 MB
CorrigendumTechnical.pdf
Tender Document • 0.71 MB
Corrigendamextension.pdf
Tender Document • 0.08 MB
Corrigendumprice.pdf
Tender Document • 0.06 MB
TenderDrawings.pdf
Tender Document • 5.89 MB
COC.pdf
Tender Document • 0.98 MB
Bidforms.pdf
Tender Document • 0.33 MB
BOQ_1244121.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .